Building Construction — Nelson, Virginia

WD VA20260173-16941-bld · Revision 1 · Effective May 17, 2026

Revision history →
Quick Answer

The Davis-Bacon prevailing wage for ASBESTOS WORKER/HEAT & FROST INSULATOR - MECHANICAL A. PAID HOLIDAYS: NEW YEAR'S DAY, MARTIN LUTHER KING DAY, MEMORIAL DAY, INDEPENDENCE DAY, LABOR DA in Nelson, Virginia (construction type: building) is $40.77/hr base + $20.17/hr fringe = $60.94/hr total package (WD VA20260173-16941-bld, Rev. 1).

Scroll down for all 28 trade classifications covered by this determination.

WD Number: VA20260173-16941-bld
Revision: 1
Construction Type: building
State: Virginia (VA)
County: Nelson
Effective: May 17, 2026
Trades covered: 28
Official source: SAM.gov reference VA20260173View on SAM.gov →

Prevailing Wage Rates — All Trades

Base hourly rates and fringe benefit requirements for all trade classifications covered by this wage determination. Total package = base + fringe.

Trade Classification Base $/hr Fringe $/hr Total Package H&W Pension Vacation Training
ASBESTOS WORKER/HEAT & FROST INSULATOR - MECHANICAL A. PAID HOLIDAYS: NEW YEAR'S DAY, MARTIN LUTHER KING DAY, MEMORIAL DAY, INDEPENDENCE DAY, LABOR DA $40.77 $20.17 $60.94 Top 10% +186% vs market $0.00 $0.00 $0.00 $0.00
BOILERMAKER $38.97 $27.39 $66.36 +128% vs market $0.00 $0.00 $0.00 $0.00
BRICKLAYER $23.54 $6.73 $30.27 +13% vs market $0.00 $0.00 $0.00 $0.00
CARPENTER $14.81 $2.19 $17.00 -30% vs market $0.00 $0.00 $0.00 $0.00
CREDIT $51.39 $38.44 $89.83 Bottom 10% $0.00 $0.00 $0.00 $0.00
ELECTRICIAN $24.01 $8.28 $32.29 +9% vs market $0.00 $0.00 $0.00 $0.00
IRONWORKER, ORNAMENTAL AND STRUCTURAL $37.86 $25.86 $63.72 Above median +128% vs market $0.00 $0.00 $0.00 $0.00
IRONWORKER, REINFORCING $25.36 $6.68 $32.04 Above median +15% vs market $0.00 $0.00 $0.00 $0.00
LABORER: COMMON OR GENERAL $10.00 $1.15 $11.15 -42% vs market $0.00 $0.00 $0.00 $0.00
LABORER: MASON TENDER - BRICK $13.41 $3.15 $16.56 Above median -14% vs market $0.00 $0.00 $0.00 $0.00
LABORER: MASON TENDER - CEMENT/CONCRETE $15.32 $0.00 $15.32 Above median -21% vs market $0.00 $0.00 $0.00 $0.00
LABORER: PIPELAYER $12.00 $1.17 $13.17 -32% vs market $0.00 $0.00 $0.00 $0.00
OPERATOR: BACKHOE/EXCAVATOR/TRACKHOE $16.24 $0.87 $17.11 $0.00 $0.00 $0.00 $0.00
OPERATOR: BOBCAT/SKID STEER/SKID LOADER $18.95 $4.03 $22.98 $0.00 $0.00 $0.00 $0.00
OPERATOR: BULLDOZER $16.00 $0.00 $16.00 $0.00 $0.00 $0.00 $0.00
OPERATOR: FORKLIFT $19.40 $7.00 $26.40 Above median $0.00 $0.00 $0.00 $0.00
OPERATOR: LOADER $21.28 $3.17 $24.45 Above median $0.00 $0.00 $0.00 $0.00
OPERATOR: ROLLER $16.25 $4.88 $21.13 Above median $0.00 $0.00 $0.00 $0.00
PAINTER $20.01 $0.00 $20.01 -7% vs market $0.00 $0.00 $0.00 $0.00
PAINTER: SPRAY ONLY $29.16 $11.86 $41.02 Top 10% +91% vs market $0.00 $0.00 $0.00 $0.00
PIPEFITTER, INCLUDES HVAC PIPE AND UNIT INSTALLATION $23.45 $6.34 $29.79 Bottom 10% +4% vs market $0.00 $0.00 $0.00 $0.00
PLUMBER $21.32 $2.31 $23.63 -17% vs market $0.00 $0.00 $0.00 $0.00
POWER EQUIPMENT OPERATOR $39.99 $18.05 $58.04 Above median +131% vs market $0.00 $0.00 $0.00 $0.00
POWER EQUIPMENT OPERATOR $40.99 $18.05 $59.04 Above median +135% vs market $0.00 $0.00 $0.00 $0.00
SHEET METAL WORKER, INCLUDES HVAC DUCT INSTALLATION.$ 19.50 2.27 ROOFER $16.17 $3.73 $19.90 -29% vs market $0.00 $0.00 $0.00 $0.00
TILE FINISHER $23.40 $0.00 $23.40 +17% vs market $0.00 $0.00 $0.00 $0.00
TILE SETTER $27.80 $10.25 $38.05 +91% vs market $0.00 $0.00 $0.00 $0.00
TRUCK DRIVER: DUMP TRUCK $16.58 $1.73 $18.31 Above median -30% vs market $0.00 $0.00 $0.00 $0.00

Crew Labor Cost Estimator

Estimate total federal-contract labor cost using the Nelson, VA — Building construction prevailing wage rates. Add a row for each trade in your crew, set the number of workers and hours, and optionally add a burden percentage for payroll taxes, workers’ comp, and insurance.

Trade Workers Hours/worker Rate $/hr Subtotal
|
Direct labor subtotal
$0.00
Loaded cost (with burden)
$0.00

This is an estimate only. Burden percentages vary widely by state, employer experience modifier, and benefit plan structure. Davis-Bacon also requires per-trade record-keeping on Form WH-347; this calculator does not replace certified payroll reporting.

Other Construction Types in Nelson

Compliance Notes

Full Davis-Bacon compliance guide →

View full revision history for VA20260173-16941-bld →