Building Construction — Lancaster, Virginia

WD VA20260007-16900-bld · Revision 1 · Effective May 17, 2026

Revision history →
Quick Answer

The Davis-Bacon prevailing wage for ASBESTOS WORKER/HEAT & FROST INSULATOR - MECHANICAL A. PAID HOLIDAYS: NEW YEAR'S DAY, MARTIN LUTHER KING DAY, MEMORIAL DAY, INDEPENDENCE DAY, LABOR DA in Lancaster, Virginia (construction type: building) is $40.77/hr base + $20.17/hr fringe = $60.94/hr total package (WD VA20260007-16900-bld, Rev. 1).

Scroll down for all 12 trade classifications covered by this determination.

WD Number: VA20260007-16900-bld
Revision: 1
Construction Type: building
State: Virginia (VA)
County: Lancaster
Effective: May 17, 2026
Trades covered: 12
Official source: SAM.gov reference VA20260007View on SAM.gov →

Prevailing Wage Rates — All Trades

Base hourly rates and fringe benefit requirements for all trade classifications covered by this wage determination. Total package = base + fringe.

Trade Classification Base $/hr Fringe $/hr Total Package H&W Pension Vacation Training
ASBESTOS WORKER/HEAT & FROST INSULATOR - MECHANICAL A. PAID HOLIDAYS: NEW YEAR'S DAY, MARTIN LUTHER KING DAY, MEMORIAL DAY, INDEPENDENCE DAY, LABOR DA $40.77 $20.17 $60.94 Top 10% +186% vs market $0.00 $0.00 $0.00 $0.00
CARPENTER $16.96 $0.00 $16.96 -30% vs market $0.00 $0.00 $0.00 $0.00
CREDIT $51.39 $38.44 $89.83 Bottom 10% $0.00 $0.00 $0.00 $0.00
ELECTRICIAN $37.95 $18.02 $55.97 +89% vs market $0.00 $0.00 $0.00 $0.00
LABORER: COMMON OR GENERAL $16.00 $0.00 $16.00 Above median -17% vs market $0.00 $0.00 $0.00 $0.00
OPERATOR: BACKHOE/EXCAVATOR/TRACKHOE $14.11 $0.00 $14.11 $0.00 $0.00 $0.00 $0.00
PIPEFITTER: INCLUDES HVAC UNIT INSTALLATION A. PAID HOLIDAYS: NEW YEAR'S DAY, MARTIN LUTHER KING'S BIRTHDAY, MEMORIAL DAY, INDEPENDENCE DAY, LABOR DAY $55.00 $24.46 $79.46 Top 10% +177% vs market $0.00 $0.00 $0.00 $0.00
PLUMBER $21.74 $5.45 $27.19 -5% vs market $0.00 $0.00 $0.00 $0.00
POWER EQUIPMENT OPERATOR: BULLDOZER $38.79 $18.05 $56.84 Above median +126% vs market $0.00 $0.00 $0.00 $0.00
ROOFER $15.56 $3.06 $18.62 -21% vs market $0.00 $0.00 $0.00 $0.00
SHEET METAL WORKER $17.73 $6.44 $24.17 -14% vs market $0.00 $0.00 $0.00 $0.00
TRUCK DRIVER: DUMP TRUCK $11.25 $0.57 $11.82 Bottom 10% -55% vs market $0.00 $0.00 $0.00 $0.00

Crew Labor Cost Estimator

Estimate total federal-contract labor cost using the Lancaster, VA — Building construction prevailing wage rates. Add a row for each trade in your crew, set the number of workers and hours, and optionally add a burden percentage for payroll taxes, workers’ comp, and insurance.

Trade Workers Hours/worker Rate $/hr Subtotal
|
Direct labor subtotal
$0.00
Loaded cost (with burden)
$0.00

This is an estimate only. Burden percentages vary widely by state, employer experience modifier, and benefit plan structure. Davis-Bacon also requires per-trade record-keeping on Form WH-347; this calculator does not replace certified payroll reporting.

Other Construction Types in Lancaster

Compliance Notes

Full Davis-Bacon compliance guide →

View full revision history for VA20260007-16900-bld →