Residential Construction — King William, Virginia

WD VA20260147-16899-res · Revision 1 · Effective May 17, 2026

Revision history →
Quick Answer

The Davis-Bacon prevailing wage for BRICKLAYER in King William, Virginia (construction type: residential) is $22.44/hr base + $10.23/hr fringe = $32.67/hr total package (WD VA20260147-16899-res, Rev. 1).

Scroll down for all 21 trade classifications covered by this determination.

WD Number: VA20260147-16899-res
Revision: 1
Construction Type: residential
State: Virginia (VA)
County: King William
Effective: May 17, 2026
Trades covered: 21
Official source: SAM.gov reference VA20260147View on SAM.gov →

Prevailing Wage Rates — All Trades

Base hourly rates and fringe benefit requirements for all trade classifications covered by this wage determination. Total package = base + fringe.

Trade Classification Base $/hr Fringe $/hr Total Package H&W Pension Vacation Training
BRICKLAYER $22.44 $10.23 $32.67 +22% vs market $0.00 $0.00 $0.00 $0.00
CARPENTER $21.44 $3.44 $24.88 +3% vs market $0.00 $0.00 $0.00 $0.00
CEMENT MASON/CONCRETE FINISHER $15.05 $0.00 $15.05 -35% vs market $0.00 $0.00 $0.00 $0.00
DRYWALL HANGER AND METAL STUD INSTALLER $15.32 $0.00 $15.32 -38% vs market $0.00 $0.00 $0.00 $0.00
ELECTRICIAN $16.18 $0.00 $16.18 Bottom 10% -45% vs market $0.00 $0.00 $0.00 $0.00
IRONWORKER, ORNAMENTAL $15.59 $0.00 $15.59 Bottom 10% -44% vs market $0.00 $0.00 $0.00 $0.00
IRONWORKER, STRUCTURAL $21.55 $1.39 $22.94 -18% vs market $0.00 $0.00 $0.00 $0.00
LABORER: COMMON OR GENERAL $10.76 $0.00 $10.76 -44% vs market $0.00 $0.00 $0.00 $0.00
LABORER: MASON TENDER - BRICK $13.56 $0.00 $13.56 Above median -30% vs market $0.00 $0.00 $0.00 $0.00
LABORER: MASON TENDER - CEMENT/CONCRETE $12.84 $0.00 $12.84 -34% vs market $0.00 $0.00 $0.00 $0.00
LABORER: PIPELAYER $14.70 $1.71 $16.41 Above median -15% vs market $0.00 $0.00 $0.00 $0.00
OPERATOR: BACKHOE/EXCAVATOR/TRACKHOE $18.58 $1.98 $20.56 Above median $0.00 $0.00 $0.00 $0.00
OPERATOR: BOBCAT/SKID STEER/SKID LOADER $15.26 $0.80 $16.06 $0.00 $0.00 $0.00 $0.00
OPERATOR: BULLDOZER $14.91 $2.27 $17.18 $0.00 $0.00 $0.00 $0.00
OPERATOR: LOADER $15.21 $2.77 $17.98 Above median $0.00 $0.00 $0.00 $0.00
PAINTER $12.67 $0.00 $12.67 -41% vs market $0.00 $0.00 $0.00 $0.00
PLUMBER $16.92 $0.76 $17.68 -38% vs market $0.00 $0.00 $0.00 $0.00
POWER EQUIPMENT OPERATOR $39.99 $18.05 $58.04 Above median +131% vs market $0.00 $0.00 $0.00 $0.00
POWER EQUIPMENT OPERATOR $40.99 $18.05 $59.04 Above median +135% vs market $0.00 $0.00 $0.00 $0.00
SHEET METAL WORKER, INCLUDES HVAC DUCT INSTALLATION.$ 15.77 0.00 ROOFER $13.15 $0.00 $13.15 Top 10% -53% vs market $0.00 $0.00 $0.00 $0.00
TRUCK DRIVER: DUMP TRUCK $16.30 $0.00 $16.30 -38% vs market $0.00 $0.00 $0.00 $0.00

Crew Labor Cost Estimator

Estimate total federal-contract labor cost using the King William, VA — Residential construction prevailing wage rates. Add a row for each trade in your crew, set the number of workers and hours, and optionally add a burden percentage for payroll taxes, workers’ comp, and insurance.

Trade Workers Hours/worker Rate $/hr Subtotal
|
Direct labor subtotal
$0.00
Loaded cost (with burden)
$0.00

This is an estimate only. Burden percentages vary widely by state, employer experience modifier, and benefit plan structure. Davis-Bacon also requires per-trade record-keeping on Form WH-347; this calculator does not replace certified payroll reporting.

Other Construction Types in King William

Compliance Notes

Full Davis-Bacon compliance guide →

View full revision history for VA20260147-16899-res →