Heavy Construction — Floyd, Virginia

WD VA20260207-16931-hvy · Revision 2 · Effective May 17, 2026

Revision history →
Quick Answer

The Davis-Bacon prevailing wage for CARPENTER in Floyd, Virginia (construction type: heavy) is $22.74/hr base + $7.82/hr fringe = $30.56/hr total package (WD VA20260207-16931-hvy, Rev. 2).

Scroll down for all 12 trade classifications covered by this determination.

WD Number: VA20260207-16931-hvy
Revision: 2
Construction Type: heavy
State: Virginia (VA)
County: Floyd
Effective: May 17, 2026
Trades covered: 12
Official source: SAM.gov reference VA20260207View on SAM.gov →

Prevailing Wage Rates — All Trades

Base hourly rates and fringe benefit requirements for all trade classifications covered by this wage determination. Total package = base + fringe.

Trade Classification Base $/hr Fringe $/hr Total Package H&W Pension Vacation Training
CARPENTER $22.74 $7.82 $30.56 +27% vs market $0.00 $0.00 $0.00 $0.00
CEMENT MASON/CONCRETE FINISHER $22.72 $5.49 $28.21 +21% vs market $0.00 $0.00 $0.00 $0.00
ELECTRICIAN $43.02 $17.52 $60.54 Above median +104% vs market $0.00 $0.00 $0.00 $0.00
IRONWORKER $28.73 $20.10 $48.83 +75% vs market $0.00 $0.00 $0.00 $0.00
LABORER: COMMON OR GENERAL $11.94 $1.48 $13.42 Above median -31% vs market $0.00 $0.00 $0.00 $0.00
LABORER: PIPELAYER $18.19 $5.09 $23.28 Above median +20% vs market $0.00 $0.00 $0.00 $0.00
OPERATOR: BACKHOE/EXCAVATOR/TRACKHOE $18.33 $2.03 $20.36 $0.00 $0.00 $0.00 $0.00
OPERATOR: BOBCAT/SKID STEER/SKID LOADER $21.37 $3.83 $25.20 Above median $0.00 $0.00 $0.00 $0.00
OPERATOR: BULLDOZER $24.43 $8.89 $33.32 Above median $0.00 $0.00 $0.00 $0.00
OPERATOR: LOADER $18.62 $7.07 $25.69 Above median $0.00 $0.00 $0.00 $0.00
POWER EQUIPMENT OPERATOR: CRANE $39.99 $18.05 $58.04 Above median +131% vs market $0.00 $0.00 $0.00 $0.00
TRUCK DRIVER: DUMP TRUCK $15.00 $1.84 $16.84 Above median -36% vs market $0.00 $0.00 $0.00 $0.00

Crew Labor Cost Estimator

Estimate total federal-contract labor cost using the Floyd, VA — Heavy construction prevailing wage rates. Add a row for each trade in your crew, set the number of workers and hours, and optionally add a burden percentage for payroll taxes, workers’ comp, and insurance.

Trade Workers Hours/worker Rate $/hr Subtotal
|
Direct labor subtotal
$0.00
Loaded cost (with burden)
$0.00

This is an estimate only. Burden percentages vary widely by state, employer experience modifier, and benefit plan structure. Davis-Bacon also requires per-trade record-keeping on Form WH-347; this calculator does not replace certified payroll reporting.

Other Construction Types in Floyd

Compliance Notes

Full Davis-Bacon compliance guide →

View full revision history for VA20260207-16931-hvy →