Heavy Construction — Fauquier, Virginia

WD VA20260210-16466-hvy · Revision 3 · Effective May 17, 2026

Revision history →
Quick Answer

The Davis-Bacon prevailing wage for CARPENTER in Fauquier, Virginia (construction type: heavy) is $22.74/hr base + $7.82/hr fringe = $30.56/hr total package (WD VA20260210-16466-hvy, Rev. 3).

Scroll down for all 16 trade classifications covered by this determination.

WD Number: VA20260210-16466-hvy
Revision: 3
Construction Type: heavy
State: Virginia (VA)
County: Fauquier
Effective: May 17, 2026
Trades covered: 16
Official source: SAM.gov reference VA20260210View on SAM.gov →

Prevailing Wage Rates — All Trades

Base hourly rates and fringe benefit requirements for all trade classifications covered by this wage determination. Total package = base + fringe.

Trade Classification Base $/hr Fringe $/hr Total Package H&W Pension Vacation Training
CARPENTER $22.74 $7.82 $30.56 +27% vs market $0.00 $0.00 $0.00 $0.00
CEMENT MASON/CONCRETE FINISHER $30.50 $14.23 $44.73 Above median +92% vs market $0.00 $0.00 $0.00 $0.00
ELECTRICIAN $59.50 $23.06 $82.56 Top 10% +179% vs market $0.00 $0.00 $0.00 $0.00
FORM WORKER $35.89 $14.44 $50.33 Top 10% $0.00 $0.00 $0.00 $0.00
IRONWORKER $31.00 $18.28 $49.28 +76% vs market $0.00 $0.00 $0.00 $0.00
LABORER: COMMON OR GENERAL $18.67 $3.95 $22.62 Above median +17% vs market $0.00 $0.00 $0.00 $0.00
LABORER: LANDSCAPE $23.00 $2.32 $25.32 Above median +31% vs market $0.00 $0.00 $0.00 $0.00
LABORER: PIPELAYER $34.27 $8.70 $42.97 Top 10% +122% vs market $0.00 $0.00 $0.00 $0.00
MASON - STONE $45.65 $21.21 $66.86 Above median +140% vs market $0.00 $0.00 $0.00 $0.00
OPERATOR: BACKHOE/EXCAVATOR/TRACKHOE $26.86 $5.98 $32.84 Above median $0.00 $0.00 $0.00 $0.00
OPERATOR: BOBCAT/SKID STEER/SKID LOADER $21.37 $3.83 $25.20 Above median $0.00 $0.00 $0.00 $0.00
OPERATOR: BULLDOZER $24.42 $0.00 $24.42 Above median $0.00 $0.00 $0.00 $0.00
PIPEFITTER $55.00 $24.46 $79.46 Above median +177% vs market $0.00 $0.00 $0.00 $0.00
POWER EQUIPMENT OPERATOR: CRANE $39.99 $18.05 $58.04 Above median +131% vs market $0.00 $0.00 $0.00 $0.00
POWER EQUIPMENT OPERATOR: LOADER $36.31 $13.27 $49.58 Above median +97% vs market $0.00 $0.00 $0.00 $0.00
TRUCK DRIVER: DUMP TRUCK $16.44 $2.83 $19.27 Above median -26% vs market $0.00 $0.00 $0.00 $0.00

Crew Labor Cost Estimator

Estimate total federal-contract labor cost using the Fauquier, VA — Heavy construction prevailing wage rates. Add a row for each trade in your crew, set the number of workers and hours, and optionally add a burden percentage for payroll taxes, workers’ comp, and insurance.

Trade Workers Hours/worker Rate $/hr Subtotal
|
Direct labor subtotal
$0.00
Loaded cost (with burden)
$0.00

This is an estimate only. Burden percentages vary widely by state, employer experience modifier, and benefit plan structure. Davis-Bacon also requires per-trade record-keeping on Form WH-347; this calculator does not replace certified payroll reporting.

Other Construction Types in Fauquier

Compliance Notes

Full Davis-Bacon compliance guide →

View full revision history for VA20260210-16466-hvy →