Highway Construction — Covington*, Virginia

WD VA20260065-16928-hwy · Revision 1 · Effective May 17, 2026

Revision history →
Quick Answer

The Davis-Bacon prevailing wage for CARPENTER, INCLUDES FORM WORK in Covington*, Virginia (construction type: highway) is $17.73/hr base + $1.48/hr fringe = $19.21/hr total package (WD VA20260065-16928-hwy, Rev. 1).

Scroll down for all 22 trade classifications covered by this determination.

WD Number: VA20260065-16928-hwy
Revision: 1
Construction Type: highway
State: Virginia (VA)
County: Covington*
Effective: May 17, 2026
Trades covered: 22
Official source: SAM.gov reference VA20260065View on SAM.gov →

Prevailing Wage Rates — All Trades

Base hourly rates and fringe benefit requirements for all trade classifications covered by this wage determination. Total package = base + fringe.

Trade Classification Base $/hr Fringe $/hr Total Package H&W Pension Vacation Training
CARPENTER, INCLUDES FORM WORK $17.73 $1.48 $19.21 Above median -20% vs market $0.00 $0.00 $0.00 $0.00
CEMENT MASON/CONCRETE FINISHER $19.35 $0.00 $19.35 -17% vs market $0.00 $0.00 $0.00 $0.00
IRONWORKER, REINFORCING $20.80 $0.00 $20.80 -26% vs market $0.00 $0.00 $0.00 $0.00
LABORER: ASPHALT, INCLUDES RAKER, SHOVELER, SPREADER AND DISTRIBUTOR $16.40 $0.00 $16.40 Above median -15% vs market $0.00 $0.00 $0.00 $0.00
LABORER: COMMON OR GENERAL $14.94 $0.00 $14.94 Above median -23% vs market $0.00 $0.00 $0.00 $0.00
LABORER: PIPELAYER $16.75 $0.00 $16.75 Above median -13% vs market $0.00 $0.00 $0.00 $0.00
OPERATOR: ASPHALT SPREADER AND DISTRIBUTOR $18.90 $0.00 $18.90 Above median $0.00 $0.00 $0.00 $0.00
OPERATOR: BACKHOE/EXCAVATOR/TRACKHOE $19.59 $0.00 $19.59 $0.00 $0.00 $0.00 $0.00
OPERATOR: BROOM/SWEEPER $12.25 $0.23 $12.48 $0.00 $0.00 $0.00 $0.00
OPERATOR: BULLDOZER $19.36 $0.00 $19.36 Above median $0.00 $0.00 $0.00 $0.00
OPERATOR: CRANE $26.68 $0.00 $26.68 $0.00 $0.00 $0.00 $0.00
OPERATOR: GRADER/BLADE, INCLUDES FINISHING $26.13 $0.00 $26.13 Top 10% $0.00 $0.00 $0.00 $0.00
OPERATOR: LOADER $19.36 $0.00 $19.36 Above median $0.00 $0.00 $0.00 $0.00
OPERATOR: MECHANIC $19.13 $0.00 $19.13 $0.00 $0.00 $0.00 $0.00
OPERATOR: MILLING MACHINE $21.13 $0.00 $21.13 Above median $0.00 $0.00 $0.00 $0.00
OPERATOR: PAVER $17.12 $0.00 $17.12 $0.00 $0.00 $0.00 $0.00
OPERATOR: ROLLER $18.96 $0.00 $18.96 Above median $0.00 $0.00 $0.00 $0.00
OPERATOR: ROLLER $18.11 $0.00 $18.11 Above median $0.00 $0.00 $0.00 $0.00
TRAFFIC CONTROL: FLAGGER $11.82 $0.00 $11.82 $0.00 $0.00 $0.00 $0.00
TRUCK DRIVER : HEAVY 7CY & UNDER $16.69 $0.00 $16.69 Top 10% -36% vs market $0.00 $0.00 $0.00 $0.00
TRUCK DRIVER: HEAVY OVER 7 CY $16.69 $0.00 $16.69 -36% vs market $0.00 $0.00 $0.00 $0.00
TRUCK DRIVER: SINGLE & MULTI AXLE $17.08 $0.00 $17.08 -35% vs market $0.00 $0.00 $0.00 $0.00

Crew Labor Cost Estimator

Estimate total federal-contract labor cost using the Covington*, VA — Highway construction prevailing wage rates. Add a row for each trade in your crew, set the number of workers and hours, and optionally add a burden percentage for payroll taxes, workers’ comp, and insurance.

Trade Workers Hours/worker Rate $/hr Subtotal
|
Direct labor subtotal
$0.00
Loaded cost (with burden)
$0.00

This is an estimate only. Burden percentages vary widely by state, employer experience modifier, and benefit plan structure. Davis-Bacon also requires per-trade record-keeping on Form WH-347; this calculator does not replace certified payroll reporting.

Other Construction Types in Covington*

Compliance Notes

Full Davis-Bacon compliance guide →

View full revision history for VA20260065-16928-hwy →