Building Construction — Charles*, Virginia

WD VA20260170-16884-bld · Revision 1 · Effective May 17, 2026

Revision history →
Quick Answer

The Davis-Bacon prevailing wage for ASBESTOS WORKER/HEAT & FROST INSULATOR - MECHANICAL A. PAID HOLIDAYS: NEW YEAR'S DAY, MARTIN LUTHER KING DAY, MEMORIAL DAY, INDEPENDENCE DAY, LABOR DA in Charles*, Virginia (construction type: building) is $40.77/hr base + $20.17/hr fringe = $60.94/hr total package (WD VA20260170-16884-bld, Rev. 1).

Scroll down for all 33 trade classifications covered by this determination.

WD Number: VA20260170-16884-bld
Revision: 1
Construction Type: building
State: Virginia (VA)
County: Charles*
Effective: May 17, 2026
Trades covered: 33
Official source: SAM.gov reference VA20260170View on SAM.gov →

Prevailing Wage Rates — All Trades

Base hourly rates and fringe benefit requirements for all trade classifications covered by this wage determination. Total package = base + fringe.

Trade Classification Base $/hr Fringe $/hr Total Package H&W Pension Vacation Training
ASBESTOS WORKER/HEAT & FROST INSULATOR - MECHANICAL A. PAID HOLIDAYS: NEW YEAR'S DAY, MARTIN LUTHER KING DAY, MEMORIAL DAY, INDEPENDENCE DAY, LABOR DA $40.77 $20.17 $60.94 Top 10% +186% vs market $0.00 $0.00 $0.00 $0.00
BOILERMAKER $38.97 $27.39 $66.36 +128% vs market $0.00 $0.00 $0.00 $0.00
BRICKLAYER $20.00 $1.00 $21.00 -21% vs market $0.00 $0.00 $0.00 $0.00
CARPENTER $21.10 $1.11 $22.21 -8% vs market $0.00 $0.00 $0.00 $0.00
CEMENT MASON/CONCRETE FINISHER $17.23 $0.00 $17.23 -26% vs market $0.00 $0.00 $0.00 $0.00
CREDIT $51.39 $38.44 $89.83 Bottom 10% $0.00 $0.00 $0.00 $0.00
ELECTRICIAN $37.95 $18.02 $55.97 +89% vs market $0.00 $0.00 $0.00 $0.00
GLAZIER $18.43 $3.71 $22.14 -21% vs market $0.00 $0.00 $0.00 $0.00
HVAC MECHANIC $20.60 $2.93 $23.53 Above median -19% vs market $0.00 $0.00 $0.00 $0.00
IRONWORKER, REINFORCING $27.18 $4.13 $31.31 Above median +12% vs market $0.00 $0.00 $0.00 $0.00
IRONWORKER: STRUCTURAL AND ORNAMENTAL $31.00 $18.28 $49.28 +76% vs market $0.00 $0.00 $0.00 $0.00
LABORER: COMMON OR GENERAL $11.53 $0.99 $12.52 -35% vs market $0.00 $0.00 $0.00 $0.00
LABORER: MASON TENDER - BRICK $13.41 $3.15 $16.56 Above median -14% vs market $0.00 $0.00 $0.00 $0.00
LABORER: MASON TENDER - CEMENT/CONCRETE $12.96 $3.12 $16.08 Above median -17% vs market $0.00 $0.00 $0.00 $0.00
LABORER: PIPELAYER $12.28 $1.96 $14.24 -26% vs market $0.00 $0.00 $0.00 $0.00
OPERATOR: BACKHOE/EXCAVATOR/TRACKHOE $19.74 $1.43 $21.17 Above median $0.00 $0.00 $0.00 $0.00
OPERATOR: BOBCAT/SKID STEER/SKID LOADER $18.95 $4.03 $22.98 $0.00 $0.00 $0.00 $0.00
OPERATOR: BULLDOZER $17.50 $0.00 $17.50 $0.00 $0.00 $0.00 $0.00
OPERATOR: FORKLIFT $19.40 $7.00 $26.40 Above median $0.00 $0.00 $0.00 $0.00
OPERATOR: LOADER $21.28 $3.17 $24.45 Above median $0.00 $0.00 $0.00 $0.00
OPERATOR: ROLLER $16.25 $4.88 $21.13 Above median $0.00 $0.00 $0.00 $0.00
PAINTER $16.87 $0.00 $16.87 -21% vs market $0.00 $0.00 $0.00 $0.00
PAINTER: SPRAY $16.58 $0.00 $16.58 -23% vs market $0.00 $0.00 $0.00 $0.00
PIPEFITTER $33.25 $19.47 $52.72 +84% vs market $0.00 $0.00 $0.00 $0.00
PLUMBER $33.25 $19.47 $52.72 Above median +84% vs market $0.00 $0.00 $0.00 $0.00
POWER EQUIPMENT OPERATOR $39.99 $18.05 $58.04 Above median +131% vs market $0.00 $0.00 $0.00 $0.00
POWER EQUIPMENT OPERATOR $40.99 $18.05 $59.04 Above median +135% vs market $0.00 $0.00 $0.00 $0.00
SHEET METAL WORKER, EXCLUDES HVAC DUCT INSTALLATION.$ 19.72 1.83 ROOFER $17.40 $1.55 $18.95 Top 10% -33% vs market $0.00 $0.00 $0.00 $0.00
SPRINKLER FITTER $20.50 $2.93 $23.43 -18% vs market $0.00 $0.00 $0.00 $0.00
TILE FINISHER $23.40 $0.00 $23.40 +17% vs market $0.00 $0.00 $0.00 $0.00
TILE SETTER $27.80 $10.25 $38.05 +91% vs market $0.00 $0.00 $0.00 $0.00
TRUCK DRIVER: DUMP TRUCK $14.88 $0.00 $14.88 -43% vs market $0.00 $0.00 $0.00 $0.00
WATERPROOFER $21.17 $3.41 $24.58 Top 10% $0.00 $0.00 $0.00 $0.00

Crew Labor Cost Estimator

Estimate total federal-contract labor cost using the Charles*, VA — Building construction prevailing wage rates. Add a row for each trade in your crew, set the number of workers and hours, and optionally add a burden percentage for payroll taxes, workers’ comp, and insurance.

Trade Workers Hours/worker Rate $/hr Subtotal
|
Direct labor subtotal
$0.00
Loaded cost (with burden)
$0.00

This is an estimate only. Burden percentages vary widely by state, employer experience modifier, and benefit plan structure. Davis-Bacon also requires per-trade record-keeping on Form WH-347; this calculator does not replace certified payroll reporting.

Other Construction Types in Charles*

Compliance Notes

Full Davis-Bacon compliance guide →

View full revision history for VA20260170-16884-bld →