Highway Construction — Albemarle, Virginia

WD VA20260099-16879-hwy · Revision 1 · Effective May 17, 2026

Revision history →
Quick Answer

The Davis-Bacon prevailing wage for CARPENTER, INCLUDES FORM WORK in Albemarle, Virginia (construction type: highway) is $17.20/hr base + $0.00/hr fringe = $17.20/hr total package (WD VA20260099-16879-hwy, Rev. 1).

Scroll down for all 33 trade classifications covered by this determination.

WD Number: VA20260099-16879-hwy
Revision: 1
Construction Type: highway
State: Virginia (VA)
County: Albemarle
Effective: May 17, 2026
Trades covered: 33
Official source: SAM.gov reference VA20260099View on SAM.gov →

Prevailing Wage Rates — All Trades

Base hourly rates and fringe benefit requirements for all trade classifications covered by this wage determination. Total package = base + fringe.

Trade Classification Base $/hr Fringe $/hr Total Package H&W Pension Vacation Training
CARPENTER, INCLUDES FORM WORK $17.20 $0.00 $17.20 -29% vs market $0.00 $0.00 $0.00 $0.00
CEMENT MASON/CONCRETE FINISHER $19.94 $0.00 $19.94 -14% vs market $0.00 $0.00 $0.00 $0.00
ELECTRICIAN, INCLUDES TRAFFIC SIGNALIZATION $36.85 $14.13 $50.98 Top 10% +72% vs market $0.00 $0.00 $0.00 $0.00
IRONWORKER, REINFORCING $22.71 $0.00 $22.71 -19% vs market $0.00 $0.00 $0.00 $0.00
IRONWORKER, STRUCTURAL $27.38 $0.00 $27.38 -2% vs market $0.00 $0.00 $0.00 $0.00
LABORER: ASPHALT, INCLUDES RAKER, SHOVELER, SPREADER AND DISTRIBUTOR $15.92 $0.00 $15.92 -18% vs market $0.00 $0.00 $0.00 $0.00
LABORER: COMMON OR GENERAL $14.65 $0.00 $14.65 Above median -24% vs market $0.00 $0.00 $0.00 $0.00
LABORER: GRADE CHECKER $15.07 $0.00 $15.07 -22% vs market $0.00 $0.00 $0.00 $0.00
LABORER: PIPELAYER $15.11 $0.00 $15.11 -22% vs market $0.00 $0.00 $0.00 $0.00
LABORER: POWER TOOL OPERATOR $15.69 $0.00 $15.69 -19% vs market $0.00 $0.00 $0.00 $0.00
OPERATOR: ASPHALT SPREADER AND DISTRIBUTOR $16.51 $0.00 $16.51 $0.00 $0.00 $0.00 $0.00
OPERATOR: BACKHOE/EXCAVATOR/TRACKHOE $21.69 $0.00 $21.69 Above median $0.00 $0.00 $0.00 $0.00
OPERATOR: BOBCAT/SKID STEER/SKID LOADER $19.16 $4.45 $23.61 Above median $0.00 $0.00 $0.00 $0.00
OPERATOR: BROOM/SWEEPER $14.32 $0.25 $14.57 Above median $0.00 $0.00 $0.00 $0.00
OPERATOR: BULLDOZER, INCLUDING UTILITY $19.26 $0.00 $19.26 $0.00 $0.00 $0.00 $0.00
OPERATOR: CRANE $25.82 $0.00 $25.82 $0.00 $0.00 $0.00 $0.00
OPERATOR: DRILL $24.66 $0.00 $24.66 Above median $0.00 $0.00 $0.00 $0.00
OPERATOR: GRADALL $18.65 $0.00 $18.65 Bottom 10% $0.00 $0.00 $0.00 $0.00
OPERATOR: GRADER/BLADE $26.13 $0.00 $26.13 Above median $0.00 $0.00 $0.00 $0.00
OPERATOR: HYDROSEEDER $16.64 $0.00 $16.64 Above median $0.00 $0.00 $0.00 $0.00
OPERATOR: LOADER $18.39 $0.00 $18.39 Above median $0.00 $0.00 $0.00 $0.00
OPERATOR: MECHANIC $20.60 $0.00 $20.60 $0.00 $0.00 $0.00 $0.00
OPERATOR: MILLING MACHINE $23.12 $3.60 $26.72 Above median $0.00 $0.00 $0.00 $0.00
OPERATOR: PAVER $18.00 $0.00 $18.00 Above median $0.00 $0.00 $0.00 $0.00
OPERATOR: PILEDRIVER $21.83 $4.08 $25.91 Top 10% $0.00 $0.00 $0.00 $0.00
OPERATOR: ROLLER $18.90 $0.00 $18.90 Above median $0.00 $0.00 $0.00 $0.00
OPERATOR: SCREED $22.13 $4.89 $27.02 Above median $0.00 $0.00 $0.00 $0.00
PAVEMENT MARKING TRUCK DRIVER $18.83 $0.00 $18.83 $0.00 $0.00 $0.00 $0.00
TRAFFIC CONTROL: FLAGGER $10.22 $0.00 $10.22 $0.00 $0.00 $0.00 $0.00
TRUCK DRIVER : HEAVY 7CY & UNDER $15.36 $0.00 $15.36 Bottom 10% -41% vs market $0.00 $0.00 $0.00 $0.00
TRUCK DRIVER: FUEL AND LUBRICANT SERVICE $18.25 $0.00 $18.25 Top 10% -30% vs market $0.00 $0.00 $0.00 $0.00
TRUCK DRIVER: HEAVY OVER 7 CY $17.74 $0.00 $17.74 Above median -32% vs market $0.00 $0.00 $0.00 $0.00
TRUCK DRIVER: SINGLE & MULTI AXLE $19.06 $0.00 $19.06 Above median -27% vs market $0.00 $0.00 $0.00 $0.00

Crew Labor Cost Estimator

Estimate total federal-contract labor cost using the Albemarle, VA — Highway construction prevailing wage rates. Add a row for each trade in your crew, set the number of workers and hours, and optionally add a burden percentage for payroll taxes, workers’ comp, and insurance.

Trade Workers Hours/worker Rate $/hr Subtotal
|
Direct labor subtotal
$0.00
Loaded cost (with burden)
$0.00

This is an estimate only. Burden percentages vary widely by state, employer experience modifier, and benefit plan structure. Davis-Bacon also requires per-trade record-keeping on Form WH-347; this calculator does not replace certified payroll reporting.

Other Construction Types in Albemarle

Compliance Notes

Full Davis-Bacon compliance guide →

View full revision history for VA20260099-16879-hwy →