Highway Construction — Windsor, Vermont

WD VT20260058-17784-hwy · Revision 1 · Effective May 17, 2026

Revision history →
Quick Answer

The Davis-Bacon prevailing wage for CARPENTER, INCLUDES FORM WORK in Windsor, Vermont (construction type: highway) is $20.46/hr base + $3.65/hr fringe = $24.11/hr total package (WD VT20260058-17784-hwy, Rev. 1).

Scroll down for all 26 trade classifications covered by this determination.

WD Number: VT20260058-17784-hwy
Revision: 1
Construction Type: highway
State: Vermont (VT)
County: Windsor
Effective: May 17, 2026
Trades covered: 26
Official source: SAM.gov reference VT20260058View on SAM.gov →

Prevailing Wage Rates — All Trades

Base hourly rates and fringe benefit requirements for all trade classifications covered by this wage determination. Total package = base + fringe.

Trade Classification Base $/hr Fringe $/hr Total Package H&W Pension Vacation Training
CARPENTER, INCLUDES FORM WORK $20.46 $3.65 $24.11 Above median -19% vs market $0.00 $0.00 $0.00 $0.00
CEMENT MASON/CONCRETE FINISHER $25.34 $0.00 $25.34 -10% vs market $0.00 $0.00 $0.00 $0.00
ELECTRICIAN $28.28 $1.90 $30.18 +5% vs market $0.00 $0.00 $0.00 $0.00
HIGHWAY/PARKING LOT STRIPING: PAINTER $20.80 $4.62 $25.42 Above median $0.00 $0.00 $0.00 $0.00
INSTALLER - SIGN $18.50 $5.52 $24.02 Top 10% $0.00 $0.00 $0.00 $0.00
IRONWORKER, REINFORCING $21.00 $4.92 $25.92 Above median -12% vs market $0.00 $0.00 $0.00 $0.00
IRONWORKER, STRUCTURAL $28.97 $8.72 $37.69 +28% vs market $0.00 $0.00 $0.00 $0.00
LABORER: COMMON OR GENERAL, INCLUDING ASPHALT RAKING, SHOVELING, SPREADING AND CONCRETE WORK $16.85 $3.90 $20.75 Top 10% -8% vs market $0.00 $0.00 $0.00 $0.00
OPERATOR: BACKHOE/EXCAVATOR/TRACKHOE $22.87 $3.07 $25.94 Above median $0.00 $0.00 $0.00 $0.00
OPERATOR: BOBCAT/SKID STEER/SKID LOADER $21.15 $12.05 $33.20 Above median $0.00 $0.00 $0.00 $0.00
OPERATOR: BROOM/SWEEPER $19.94 $6.29 $26.23 Above median $0.00 $0.00 $0.00 $0.00
OPERATOR: BULLDOZER $20.71 $0.92 $21.63 Above median $0.00 $0.00 $0.00 $0.00
OPERATOR: CRANE $22.48 $3.00 $25.48 $0.00 $0.00 $0.00 $0.00
OPERATOR: DRILL $20.23 $4.50 $24.73 Above median $0.00 $0.00 $0.00 $0.00
OPERATOR: GRADER/BLADE $20.91 $5.79 $26.70 Above median $0.00 $0.00 $0.00 $0.00
OPERATOR: LOADER $22.29 $4.48 $26.77 Above median $0.00 $0.00 $0.00 $0.00
OPERATOR: MECHANIC $20.45 $4.54 $24.99 Above median $0.00 $0.00 $0.00 $0.00
OPERATOR: MILLING MACHINE $28.76 $16.77 $45.53 Above median $0.00 $0.00 $0.00 $0.00
OPERATOR: PAVER $23.09 $8.53 $31.62 Above median $0.00 $0.00 $0.00 $0.00
OPERATOR: POUNDER $20.70 $3.78 $24.48 Above median $0.00 $0.00 $0.00 $0.00
OPERATOR: ROLLER $22.55 $9.48 $32.03 Above median $0.00 $0.00 $0.00 $0.00
OPERATOR: SCREED $20.78 $10.07 $30.85 Above median $0.00 $0.00 $0.00 $0.00
TRAFFIC CONTROL: FLAGGER $11.15 $4.40 $15.55 Above median $0.00 $0.00 $0.00 $0.00
TRAFFIC CONTROL: LABORER-CONES/ BARRICADES/BARRELS - SETTER/MOVER/SWEEPER $17.42 $7.11 $24.53 Above median $0.00 $0.00 $0.00 $0.00
TRUCK DRIVER, INCLUDES ALL AXLES INCLUDING DUMP TRUCKS $18.60 $3.58 $22.18 Above median -18% vs market $0.00 $0.00 $0.00 $0.00
TRUCK DRIVER: DISTRIBUTOR TRUCK $22.32 $0.00 $22.32 Above median -18% vs market $0.00 $0.00 $0.00 $0.00

Crew Labor Cost Estimator

Estimate total federal-contract labor cost using the Windsor, VT — Highway construction prevailing wage rates. Add a row for each trade in your crew, set the number of workers and hours, and optionally add a burden percentage for payroll taxes, workers’ comp, and insurance.

Trade Workers Hours/worker Rate $/hr Subtotal
|
Direct labor subtotal
$0.00
Loaded cost (with burden)
$0.00

This is an estimate only. Burden percentages vary widely by state, employer experience modifier, and benefit plan structure. Davis-Bacon also requires per-trade record-keeping on Form WH-347; this calculator does not replace certified payroll reporting.