Heavy Construction — Washington, Vermont

WD VT20260066-17768-hvy · Revision 1 · Effective May 17, 2026

Revision history →
Quick Answer

The Davis-Bacon prevailing wage for CARPENTER, INCLUDES FORM WORK in Washington, Vermont (construction type: heavy) is $22.54/hr base + $12.82/hr fringe = $35.36/hr total package (WD VT20260066-17768-hvy, Rev. 1).

Scroll down for all 11 trade classifications covered by this determination.

WD Number: VT20260066-17768-hvy
Revision: 1
Construction Type: heavy
State: Vermont (VT)
County: Washington
Effective: May 17, 2026
Trades covered: 11
Official source: SAM.gov reference VT20260066View on SAM.gov →

Prevailing Wage Rates — All Trades

Base hourly rates and fringe benefit requirements for all trade classifications covered by this wage determination. Total package = base + fringe.

Trade Classification Base $/hr Fringe $/hr Total Package H&W Pension Vacation Training
CARPENTER, INCLUDES FORM WORK $22.54 $12.82 $35.36 Above median +18% vs market $0.00 $0.00 $0.00 $0.00
ELECTRICIAN $24.13 $11.96 $36.09 +26% vs market $0.00 $0.00 $0.00 $0.00
IRONWORKER, REINFORCING $33.65 $26.12 $59.77 Above median +103% vs market $0.00 $0.00 $0.00 $0.00
LABORER $25.40 $21.43 $46.83 Above median +109% vs market $0.00 $0.00 $0.00 $0.00
LABORER: PIPELAYER $25.40 $21.43 $46.83 Top 10% +109% vs market $0.00 $0.00 $0.00 $0.00
OPERATOR: BACKHOE/EXCAVATOR/TRACKHOE $22.15 $2.79 $24.94 Above median $0.00 $0.00 $0.00 $0.00
OPERATOR: LOADER $21.36 $0.00 $21.36 Above median $0.00 $0.00 $0.00 $0.00
OPERATOR: PAVER $23.33 $0.00 $23.33 Above median $0.00 $0.00 $0.00 $0.00
OPERATOR: ROLLER $21.26 $0.00 $21.26 Above median $0.00 $0.00 $0.00 $0.00
TRAFFIC CONTROL: FLAGGER $14.85 $0.29 $15.14 Above median $0.00 $0.00 $0.00 $0.00
TRUCK DRIVER: DUMP TRUCK $18.43 $0.00 $18.43 Above median -32% vs market $0.00 $0.00 $0.00 $0.00

Crew Labor Cost Estimator

Estimate total federal-contract labor cost using the Washington, VT — Heavy construction prevailing wage rates. Add a row for each trade in your crew, set the number of workers and hours, and optionally add a burden percentage for payroll taxes, workers’ comp, and insurance.

Trade Workers Hours/worker Rate $/hr Subtotal
|
Direct labor subtotal
$0.00
Loaded cost (with burden)
$0.00

This is an estimate only. Burden percentages vary widely by state, employer experience modifier, and benefit plan structure. Davis-Bacon also requires per-trade record-keeping on Form WH-347; this calculator does not replace certified payroll reporting.

Other Construction Types in Washington

Compliance Notes

Full Davis-Bacon compliance guide →

View full revision history for VT20260066-17768-hvy →