Highway Construction — Orange, Vermont

WD VT20260053-17766-hwy · Revision 1 · Effective May 17, 2026

Revision history →
Quick Answer

The Davis-Bacon prevailing wage for CARPENTER, INCLUDES FORM WORK in Orange, Vermont (construction type: highway) is $20.00/hr base + $1.64/hr fringe = $21.64/hr total package (WD VT20260053-17766-hwy, Rev. 1).

Scroll down for all 28 trade classifications covered by this determination.

WD Number: VT20260053-17766-hwy
Revision: 1
Construction Type: highway
State: Vermont (VT)
County: Orange
Effective: May 17, 2026
Trades covered: 28
Official source: SAM.gov reference VT20260053View on SAM.gov →

Prevailing Wage Rates — All Trades

Base hourly rates and fringe benefit requirements for all trade classifications covered by this wage determination. Total package = base + fringe.

Trade Classification Base $/hr Fringe $/hr Total Package H&W Pension Vacation Training
CARPENTER, INCLUDES FORM WORK $20.00 $1.64 $21.64 Above median -28% vs market $0.00 $0.00 $0.00 $0.00
CEMENT MASON/CONCRETE FINISHER $25.34 $0.00 $25.34 -10% vs market $0.00 $0.00 $0.00 $0.00
ELECTRICIAN $28.15 $2.03 $30.18 +5% vs market $0.00 $0.00 $0.00 $0.00
HIGHWAY/PARKING LOT STRIPING: PAINTER $23.83 $0.00 $23.83 Above median $0.00 $0.00 $0.00 $0.00
INSTALLER - SIGN $16.25 $3.20 $19.45 Above median $0.00 $0.00 $0.00 $0.00
IRONWORKER, REINFORCING $21.70 $1.60 $23.30 -21% vs market $0.00 $0.00 $0.00 $0.00
IRONWORKER, STRUCTURAL $28.77 $7.91 $36.68 +25% vs market $0.00 $0.00 $0.00 $0.00
LABORER: COMMON OR GENERAL, INCLUDES ASPHALT RAKER, SHOVELER, SPREADER AND DISTRIBUTOR $16.32 $3.15 $19.47 -13% vs market $0.00 $0.00 $0.00 $0.00
LABORER: CONCRETE WORKER $20.19 $1.31 $21.50 -4% vs market $0.00 $0.00 $0.00 $0.00
LABORER: LANDSCAPE $14.70 $1.03 $15.73 Above median -30% vs market $0.00 $0.00 $0.00 $0.00
OPERATOR: BACKHOE/EXCAVATOR/TRACKHOE $22.52 $4.22 $26.74 Above median $0.00 $0.00 $0.00 $0.00
OPERATOR: BOBCAT/SKID STEER/SKID LOADER $19.79 $4.28 $24.07 Above median $0.00 $0.00 $0.00 $0.00
OPERATOR: BROOM/SWEEPER $16.88 $6.14 $23.02 Above median $0.00 $0.00 $0.00 $0.00
OPERATOR: BULLDOZER $21.35 $3.84 $25.19 Above median $0.00 $0.00 $0.00 $0.00
OPERATOR: CRANE $23.42 $2.38 $25.80 $0.00 $0.00 $0.00 $0.00
OPERATOR: DRILL $19.83 $3.94 $23.77 $0.00 $0.00 $0.00 $0.00
OPERATOR: GRADER/BLADE $21.13 $5.53 $26.66 Above median $0.00 $0.00 $0.00 $0.00
OPERATOR: LOADER $21.95 $4.63 $26.58 Above median $0.00 $0.00 $0.00 $0.00
OPERATOR: MECHANIC $23.14 $6.08 $29.22 Above median $0.00 $0.00 $0.00 $0.00
OPERATOR: MILLING MACHINE $22.50 $10.24 $32.74 Above median $0.00 $0.00 $0.00 $0.00
OPERATOR: PAVER $20.89 $5.08 $25.97 Above median $0.00 $0.00 $0.00 $0.00
OPERATOR: POUNDER $22.31 $0.00 $22.31 $0.00 $0.00 $0.00 $0.00
OPERATOR: ROLLER $18.48 $7.16 $25.64 Above median $0.00 $0.00 $0.00 $0.00
OPERATOR: SCREED $20.87 $7.24 $28.11 Above median $0.00 $0.00 $0.00 $0.00
TRAFFIC CONTROL: FLAGGER $10.04 $3.54 $13.58 Above median $0.00 $0.00 $0.00 $0.00
TRAFFIC CONTROL: LABORER-CONES/ BARRICADES/BARRELS - SETTER/MOVER/SWEEPER $17.20 $6.71 $23.91 Above median $0.00 $0.00 $0.00 $0.00
TRUCK DRIVER, INCLUDES ALL AXLES INCLUDING DUMP TRUCKS $18.44 $1.75 $20.19 Bottom 10% -25% vs market $0.00 $0.00 $0.00 $0.00
TRUCK DRIVER: DISTRIBUTOR TRUCK $22.55 $11.87 $34.42 Above median +27% vs market $0.00 $0.00 $0.00 $0.00

Crew Labor Cost Estimator

Estimate total federal-contract labor cost using the Orange, VT — Highway construction prevailing wage rates. Add a row for each trade in your crew, set the number of workers and hours, and optionally add a burden percentage for payroll taxes, workers’ comp, and insurance.

Trade Workers Hours/worker Rate $/hr Subtotal
|
Direct labor subtotal
$0.00
Loaded cost (with burden)
$0.00

This is an estimate only. Burden percentages vary widely by state, employer experience modifier, and benefit plan structure. Davis-Bacon also requires per-trade record-keeping on Form WH-347; this calculator does not replace certified payroll reporting.

Other Construction Types in Orange

Compliance Notes

Full Davis-Bacon compliance guide →

View full revision history for VT20260053-17766-hwy →