Heavy Construction — Grand Isle, Vermont

WD VT20260069-17777-hvy · Revision 1 · Effective May 17, 2026

Revision history →
Quick Answer

The Davis-Bacon prevailing wage for ELECTRICIAN, INCLUDES LOW VOLTAGE WIRING in Grand Isle, Vermont (construction type: heavy) is $28.82/hr base + $2.85/hr fringe = $31.67/hr total package (WD VT20260069-17777-hvy, Rev. 1).

Scroll down for all 7 trade classifications covered by this determination.

WD Number: VT20260069-17777-hvy
Revision: 1
Construction Type: heavy
State: Vermont (VT)
County: Grand Isle
Effective: May 17, 2026
Trades covered: 7
Official source: SAM.gov reference VT20260069View on SAM.gov →

Prevailing Wage Rates — All Trades

Base hourly rates and fringe benefit requirements for all trade classifications covered by this wage determination. Total package = base + fringe.

Trade Classification Base $/hr Fringe $/hr Total Package H&W Pension Vacation Training
ELECTRICIAN, INCLUDES LOW VOLTAGE WIRING $28.82 $2.85 $31.67 Above median +10% vs market $0.00 $0.00 $0.00 $0.00
LABORER $25.40 $21.43 $46.83 Above median +109% vs market $0.00 $0.00 $0.00 $0.00
LABORER: PIPELAYER $25.40 $21.43 $46.83 Top 10% +109% vs market $0.00 $0.00 $0.00 $0.00
OPERATOR: BACKHOE/EXCAVATOR/TRACKHOE $27.45 $10.33 $37.78 Above median $0.00 $0.00 $0.00 $0.00
OPERATOR: LOADER $27.04 $19.52 $46.56 Top 10% $0.00 $0.00 $0.00 $0.00
TRAFFIC CONTROL: FLAGGER $12.60 $0.14 $12.74 $0.00 $0.00 $0.00 $0.00
TRUCK DRIVER: DUMP TRUCK $17.35 $0.00 $17.35 Above median -36% vs market $0.00 $0.00 $0.00 $0.00

Crew Labor Cost Estimator

Estimate total federal-contract labor cost using the Grand Isle, VT — Heavy construction prevailing wage rates. Add a row for each trade in your crew, set the number of workers and hours, and optionally add a burden percentage for payroll taxes, workers’ comp, and insurance.

Trade Workers Hours/worker Rate $/hr Subtotal
|
Direct labor subtotal
$0.00
Loaded cost (with burden)
$0.00

This is an estimate only. Burden percentages vary widely by state, employer experience modifier, and benefit plan structure. Davis-Bacon also requires per-trade record-keeping on Form WH-347; this calculator does not replace certified payroll reporting.

Other Construction Types in Grand Isle

Compliance Notes

Full Davis-Bacon compliance guide →

View full revision history for VT20260069-17777-hvy →