Highway Construction — Franklin, Vermont

WD VT20260060-17765-hwy · Revision 1 · Effective May 17, 2026

Revision history →
Quick Answer

The Davis-Bacon prevailing wage for CARPENTER, INCLUDES FORM WORK in Franklin, Vermont (construction type: highway) is $21.66/hr base + $3.58/hr fringe = $25.24/hr total package (WD VT20260060-17765-hwy, Rev. 1).

Scroll down for all 12 trade classifications covered by this determination.

WD Number: VT20260060-17765-hwy
Revision: 1
Construction Type: highway
State: Vermont (VT)
County: Franklin
Effective: May 17, 2026
Trades covered: 12
Official source: SAM.gov reference VT20260060View on SAM.gov →

Prevailing Wage Rates — All Trades

Base hourly rates and fringe benefit requirements for all trade classifications covered by this wage determination. Total package = base + fringe.

Trade Classification Base $/hr Fringe $/hr Total Package H&W Pension Vacation Training
CARPENTER, INCLUDES FORM WORK $21.66 $3.58 $25.24 Above median -16% vs market $0.00 $0.00 $0.00 $0.00
LABORER: COMMON OR GENERAL, INCLUDES ASPHALT RAKER, SHOVELER, SPREADER AND DISTRIBUTOR $16.48 $1.68 $18.16 -19% vs market $0.00 $0.00 $0.00 $0.00
LABORER: PIPELAYER $25.40 $21.43 $46.83 Top 10% +109% vs market $0.00 $0.00 $0.00 $0.00
OPERATOR: BACKHOE/EXCAVATOR/TRACKHOE $21.58 $2.25 $23.83 Above median $0.00 $0.00 $0.00 $0.00
OPERATOR: BOBCAT/SKID STEER/SKID LOADER $22.85 $8.39 $31.24 Above median $0.00 $0.00 $0.00 $0.00
OPERATOR: BROOM/SWEEPER $18.57 $2.47 $21.04 Above median $0.00 $0.00 $0.00 $0.00
OPERATOR: LOADER $21.50 $2.41 $23.91 Above median $0.00 $0.00 $0.00 $0.00
OPERATOR: MILLING MACHINE $32.40 $23.55 $55.95 Top 10% $0.00 $0.00 $0.00 $0.00
OPERATOR: PAVER $21.41 $3.55 $24.96 Above median $0.00 $0.00 $0.00 $0.00
OPERATOR: POUNDER $22.30 $5.04 $27.34 Above median $0.00 $0.00 $0.00 $0.00
TRAFFIC CONTROL: FLAGGER $12.90 $0.00 $12.90 Above median $0.00 $0.00 $0.00 $0.00
TRUCK DRIVER, INCLUDES ALL AXLES INCLUDING DUMP TRUCKS $18.90 $2.68 $21.58 Above median -20% vs market $0.00 $0.00 $0.00 $0.00

Crew Labor Cost Estimator

Estimate total federal-contract labor cost using the Franklin, VT — Highway construction prevailing wage rates. Add a row for each trade in your crew, set the number of workers and hours, and optionally add a burden percentage for payroll taxes, workers’ comp, and insurance.

Trade Workers Hours/worker Rate $/hr Subtotal
|
Direct labor subtotal
$0.00
Loaded cost (with burden)
$0.00

This is an estimate only. Burden percentages vary widely by state, employer experience modifier, and benefit plan structure. Davis-Bacon also requires per-trade record-keeping on Form WH-347; this calculator does not replace certified payroll reporting.

Other Construction Types in Franklin

Compliance Notes

Full Davis-Bacon compliance guide →

View full revision history for VT20260060-17765-hwy →