Highway Construction — Weber, Utah

WD UT20260111-17785-hwy · Revision 1 · Effective May 17, 2026

Revision history →
Quick Answer

The Davis-Bacon prevailing wage for CARPENTER, INCLUDES FORM WORK in Weber, Utah (construction type: highway) is $22.84/hr base + $4.64/hr fringe = $27.48/hr total package (WD UT20260111-17785-hwy, Rev. 1).

Scroll down for all 34 trade classifications covered by this determination.

WD Number: UT20260111-17785-hwy
Revision: 1
Construction Type: highway
State: Utah (UT)
County: Weber
Effective: May 17, 2026
Trades covered: 34
Official source: SAM.gov reference UT20260111View on SAM.gov →

Prevailing Wage Rates — All Trades

Base hourly rates and fringe benefit requirements for all trade classifications covered by this wage determination. Total package = base + fringe.

Trade Classification Base $/hr Fringe $/hr Total Package H&W Pension Vacation Training
CARPENTER, INCLUDES FORM WORK $22.84 $4.64 $27.48 Above median +11% vs market $0.00 $0.00 $0.00 $0.00
CEMENT MASON/CONCRETE FINISHER $18.94 $2.41 $21.35 -20% vs market $0.00 $0.00 $0.00 $0.00
ELECTRICIAN, INCLUDES LOW VOLTAGE WIRING $32.24 $7.85 $40.09 Above median +36% vs market $0.00 $0.00 $0.00 $0.00
FENCE ERECTOR $15.07 $2.53 $17.60 Top 10% $0.00 $0.00 $0.00 $0.00
HIGHWAY/PARKING LOT STRIPING: PAINTER $14.05 $1.62 $15.67 Bottom 10% $0.00 $0.00 $0.00 $0.00
INSTALLER - SIGN $16.95 $5.87 $22.82 Top 10% $0.00 $0.00 $0.00 $0.00
IRONWORKER, REINFORCING $26.61 $13.76 $40.37 Above median +76% vs market $0.00 $0.00 $0.00 $0.00
LABORER: ASPHALT, INCLUDES RAKER, SHOVELER, SPREADER AND DISTRIBUTOR $22.69 $8.65 $31.34 Above median +41% vs market $0.00 $0.00 $0.00 $0.00
LABORER: COMMON OR GENERAL $17.02 $4.79 $21.81 Above median -2% vs market $0.00 $0.00 $0.00 $0.00
LABORER: GRADE CHECKER $21.21 $6.30 $27.51 Above median +24% vs market $0.00 $0.00 $0.00 $0.00
LABORER: LANDSCAPE $12.18 $2.53 $14.71 Above median -34% vs market $0.00 $0.00 $0.00 $0.00
LABORER: MASON TENDER - CEMENT/CONCRETE $12.40 $2.53 $14.93 Above median -33% vs market $0.00 $0.00 $0.00 $0.00
LABORER: PIPELAYER $17.13 $3.54 $20.67 Above median -7% vs market $0.00 $0.00 $0.00 $0.00
OPERATOR: BACKHOE/EXCAVATOR/TRACKHOE $19.32 $5.27 $24.59 Above median $0.00 $0.00 $0.00 $0.00
OPERATOR: BOBCAT/SKID STEER/SKID LOADER $19.76 $3.31 $23.07 $0.00 $0.00 $0.00 $0.00
OPERATOR: BROOM/SWEEPER $23.36 $5.52 $28.88 Above median $0.00 $0.00 $0.00 $0.00
OPERATOR: CONCRETE FINISHING MACHINE $20.03 $6.55 $26.58 Above median $0.00 $0.00 $0.00 $0.00
OPERATOR: CRANE $30.66 $10.61 $41.27 Above median $0.00 $0.00 $0.00 $0.00
OPERATOR: DRILL $27.44 $15.65 $43.09 Above median $0.00 $0.00 $0.00 $0.00
OPERATOR: GRADER/BLADE $27.87 $15.65 $43.52 Top 10% $0.00 $0.00 $0.00 $0.00
OPERATOR: LOADER $23.78 $15.65 $39.43 Above median $0.00 $0.00 $0.00 $0.00
OPERATOR: MECHANIC $36.34 $15.65 $51.99 Above median $0.00 $0.00 $0.00 $0.00
OPERATOR: MILLING MACHINE $25.37 $15.65 $41.02 Above median $0.00 $0.00 $0.00 $0.00
OPERATOR: OILER $22.18 $9.73 $31.91 Above median $0.00 $0.00 $0.00 $0.00
OPERATOR: PAVEMENT MARKING GRINDER $24.37 $15.65 $40.02 Top 10% $0.00 $0.00 $0.00 $0.00
OPERATOR: PAVER $24.40 $15.65 $40.05 Top 10% $0.00 $0.00 $0.00 $0.00
OPERATOR: ROLLER $22.11 $12.45 $34.56 Above median $0.00 $0.00 $0.00 $0.00
OPERATOR: SCREED $24.45 $15.65 $40.10 Top 10% $0.00 $0.00 $0.00 $0.00
TRAFFIC CONTROL: FLAGGER $20.59 $8.65 $29.24 Above median $0.00 $0.00 $0.00 $0.00
TRAFFIC CONTROL: LABORER-CONES/ BARRICADES/BARRELS - SETTER/MOVER/SWEEPER $20.59 $7.56 $28.15 Above median $0.00 $0.00 $0.00 $0.00
TRUCK DRIVER: DUMP TRUCK $25.12 $11.47 $36.59 Top 10% +28% vs market $0.00 $0.00 $0.00 $0.00
TRUCK DRIVER: OIL DISTRIBUTOR TRUCK $27.78 $11.64 $39.42 Top 10% +38% vs market $0.00 $0.00 $0.00 $0.00
TRUCK DRIVER: VACTOR $23.40 $0.00 $23.40 Top 10% -18% vs market $0.00 $0.00 $0.00 $0.00
TRUCK DRIVER: WATER TRUCK $25.25 $11.47 $36.72 Top 10% +28% vs market $0.00 $0.00 $0.00 $0.00

Crew Labor Cost Estimator

Estimate total federal-contract labor cost using the Weber, UT — Highway construction prevailing wage rates. Add a row for each trade in your crew, set the number of workers and hours, and optionally add a burden percentage for payroll taxes, workers’ comp, and insurance.

Trade Workers Hours/worker Rate $/hr Subtotal
|
Direct labor subtotal
$0.00
Loaded cost (with burden)
$0.00

This is an estimate only. Burden percentages vary widely by state, employer experience modifier, and benefit plan structure. Davis-Bacon also requires per-trade record-keeping on Form WH-347; this calculator does not replace certified payroll reporting.