Heavy Construction — Summit, Utah

WD UT20260011-17666-hvy · Revision 1 · Effective May 17, 2026

Revision history →
Quick Answer

The Davis-Bacon prevailing wage for CARPENTER, INCLUDES FORM WORK in Summit, Utah (construction type: heavy) is $14.63/hr base + $0.97/hr fringe = $15.60/hr total package (WD UT20260011-17666-hvy, Rev. 1).

Scroll down for all 33 trade classifications covered by this determination.

WD Number: UT20260011-17666-hvy
Revision: 1
Construction Type: heavy
State: Utah (UT)
County: Summit
Effective: May 17, 2026
Trades covered: 33
Official source: SAM.gov reference UT20260011View on SAM.gov →

Prevailing Wage Rates — All Trades

Base hourly rates and fringe benefit requirements for all trade classifications covered by this wage determination. Total package = base + fringe.

Trade Classification Base $/hr Fringe $/hr Total Package H&W Pension Vacation Training
CARPENTER, INCLUDES FORM WORK $14.63 $0.97 $15.60 -37% vs market $0.00 $0.00 $0.00 $0.00
CEMENT MASON/CONCRETE FINISHER $17.08 $3.14 $20.22 -24% vs market $0.00 $0.00 $0.00 $0.00
ELECTRICIAN $23.74 $7.64 $31.38 +6% vs market $0.00 $0.00 $0.00 $0.00
IRONWORKER $32.68 $27.55 $60.23 +162% vs market $0.00 $0.00 $0.00 $0.00
LABORER: COMMON OR GENERAL, PIPELAYER: NATURAL GAS PIPELINE CONSTRUCTION ONLY $20.59 $8.65 $29.24 +32% vs market $0.00 $0.00 $0.00 $0.00
LABORER: COMMON OR GENERAL: EXCLUDING NATURAL GAS PIPELINE & WATER/SEWER LINE CONSTRUCTION $20.59 $8.65 $29.24 +32% vs market $0.00 $0.00 $0.00 $0.00
LABORER: LANDSCAPE $7.25 $0.00 $7.25 Bottom 10% -67% vs market $0.00 $0.00 $0.00 $0.00
LABORER: MASON TENDER, HAND HELD SAW, JACKHAMMER, POWER SAW) $20.85 $8.65 $29.50 +33% vs market $0.00 $0.00 $0.00 $0.00
LABORER: PIPELAYER $14.00 $0.00 $14.00 -37% vs market $0.00 $0.00 $0.00 $0.00
LABORER: POT TENDER AND SAND BLASTER: NATURAL GAS PIPELINE CONSTRUCTION ONLY $20.85 $8.65 $29.50 +33% vs market $0.00 $0.00 $0.00 $0.00
LABORER:FLAGGER $20.59 $8.65 $29.24 +32% vs market $0.00 $0.00 $0.00 $0.00
LABORER:HAND HELD DRILL $21.65 $8.65 $30.30 +37% vs market $0.00 $0.00 $0.00 $0.00
LINE CONSTRUCTION: LINEMAN $58.83 $21.21 $80.04 +105% vs market $0.00 $0.00 $0.00 $0.00
OPERATOR: CRANE $28.97 $9.40 $38.37 Above median $0.00 $0.00 $0.00 $0.00
OPERATOR: POWER EQUIPMENT ( ROLLER) $34.25 $18.62 $52.87 $0.00 $0.00 $0.00 $0.00
OPERATOR: POWER EQUIPMENT (BLADE/GRADER) $40.32 $18.62 $58.94 $0.00 $0.00 $0.00 $0.00
OPERATOR: POWER EQUIPMENT OILER: NATURAL GAS PIPELINE CONSTRUCTION ONLY $22.03 $11.88 $33.91 Top 10% $0.00 $0.00 $0.00 $0.00
OPERATOR: POWER EQUIPMENT SCREED $36.55 $18.62 $55.17 Top 10% $0.00 $0.00 $0.00 $0.00
OPERATOR: POWER EQUIPMENT: ASPHALT PAVER, BULLDOZER, FRONT END LOADER, GRADE SETTER, OIL DISTRIBUTOR, SCRAPER $37.79 $18.62 $56.41 $0.00 $0.00 $0.00 $0.00
OPERATOR: POWER EQUIPMENT: ASPHALT ROLLER, BOBCAT/SKID LOADER, FRONT END LOADER, OILER $36.55 $18.62 $55.17 $0.00 $0.00 $0.00 $0.00
OPERATOR: POWER EQUIPMENT: BACKHOE/EXCAVATOR, FRONT END LOADER $39.01 $18.62 $57.63 Top 10% $0.00 $0.00 $0.00 $0.00
OPERATOR: POWER EQUIPMENT: BACKHOE/EXCAVATOR/TRACKHOE, BLADE/GRADER, BOOM, BULLDOZER, MECHANIC: NATURAL GAS PIPELINE CONSTRUCTION ONLY $35.68 $17.57 $53.25 $0.00 $0.00 $0.00 $0.00
OPERATOR: POWER EQUIPMENT:MECHANIC-EXCLUDING NATURAL GAS PIPELINE CONSTRUCTION $41.71 $18.62 $60.33 $0.00 $0.00 $0.00 $0.00
OPERATOR: TRACKHOE $19.98 $0.00 $19.98 Above median $0.00 $0.00 $0.00 $0.00
TRUCK DRIVER $14.40 $3.99 $18.39 Above median -36% vs market $0.00 $0.00 $0.00 $0.00
TRUCK DRIVER ZONE 1: GROUP 1 $41.39 $15.10 $56.49 +97% vs market $0.00 $0.00 $0.00 $0.00
TRUCK DRIVER ZONE 1: GROUP 2 $40.75 $15.10 $55.85 +95% vs market $0.00 $0.00 $0.00 $0.00
TRUCK DRIVER ZONE 1: GROUP 3 $40.37 $15.10 $55.47 +94% vs market $0.00 $0.00 $0.00 $0.00
TRUCK DRIVER ZONE 2: GROUP 1 $46.65 $15.75 $62.40 +118% vs market $0.00 $0.00 $0.00 $0.00
TRUCK DRIVER ZONE 2: GROUP 2 $46.02 $15.75 $61.77 +116% vs market $0.00 $0.00 $0.00 $0.00
TRUCK DRIVER ZONE 2: GROUP 3 $41.90 $15.75 $57.65 +101% vs market $0.00 $0.00 $0.00 $0.00
WATER & SEWER LINES: LABORER, COMMON OR GENERAL $12.81 $0.00 $12.81 $0.00 $0.00 $0.00 $0.00
WATER & SEWER LINES: OPERATOR-BACKHOE/EXCAVATOR/TRACKHOE $15.57 $0.00 $15.57 $0.00 $0.00 $0.00 $0.00

Crew Labor Cost Estimator

Estimate total federal-contract labor cost using the Summit, UT — Heavy construction prevailing wage rates. Add a row for each trade in your crew, set the number of workers and hours, and optionally add a burden percentage for payroll taxes, workers’ comp, and insurance.

Trade Workers Hours/worker Rate $/hr Subtotal
|
Direct labor subtotal
$0.00
Loaded cost (with burden)
$0.00

This is an estimate only. Burden percentages vary widely by state, employer experience modifier, and benefit plan structure. Davis-Bacon also requires per-trade record-keeping on Form WH-347; this calculator does not replace certified payroll reporting.

Other Construction Types in Summit

Compliance Notes

Full Davis-Bacon compliance guide →

View full revision history for UT20260011-17666-hvy →