Heavy Construction — Sevier, Utah

WD UT20260029-17769-hvy · Revision 1 · Effective May 17, 2026

Revision history →
Quick Answer

The Davis-Bacon prevailing wage for CARPENTER, INCLUDES FORM WORK in Sevier, Utah (construction type: heavy) is $14.75/hr base + $3.03/hr fringe = $17.78/hr total package (WD UT20260029-17769-hvy, Rev. 1).

Scroll down for all 20 trade classifications covered by this determination.

WD Number: UT20260029-17769-hvy
Revision: 1
Construction Type: heavy
State: Utah (UT)
County: Sevier
Effective: May 17, 2026
Trades covered: 20
Official source: SAM.gov reference UT20260029View on SAM.gov →

Prevailing Wage Rates — All Trades

Base hourly rates and fringe benefit requirements for all trade classifications covered by this wage determination. Total package = base + fringe.

Trade Classification Base $/hr Fringe $/hr Total Package H&W Pension Vacation Training
CARPENTER, INCLUDES FORM WORK $14.75 $3.03 $17.78 Above median -28% vs market $0.00 $0.00 $0.00 $0.00
CEMENT MASON/CONCRETE FINISHER $14.00 $0.56 $14.56 -45% vs market $0.00 $0.00 $0.00 $0.00
LABORER CHAIN SAW AND POWER DRILL: NATURAL GAS PIPELINE CONSTRUCTION ONLY $20.85 $8.65 $29.50 Top 10% +33% vs market $0.00 $0.00 $0.00 $0.00
LABORER COMMON OR GENERAL, NAIL GUN, PIPELAYER, POT TENDER: NATURAL GAS PIPELINE CONSTRUCTION ONLY $20.59 $8.65 $29.24 Top 10% +32% vs market $0.00 $0.00 $0.00 $0.00
LABORER FORMWORKER: NATURAL GAS PIPELINE CONSTRUCTION ONLY $20.85 $8.65 $29.50 Top 10% +33% vs market $0.00 $0.00 $0.00 $0.00
LABORER POWDERMAN: NATURAL GAS PIPELINE CONSTRUCTION ONLY $21.65 $8.65 $30.30 Top 10% +37% vs market $0.00 $0.00 $0.00 $0.00
LABORER SANDBLASTER: NATURAL GAS PIPELINE CONSTRUCTION ONLY $20.85 $8.65 $29.50 Top 10% +33% vs market $0.00 $0.00 $0.00 $0.00
LABORER: COMMON OR GENERAL $10.92 $0.00 $10.92 -51% vs market $0.00 $0.00 $0.00 $0.00
LABORER: MASON TENDER - CEMENT/CONCRETE $9.00 $0.36 $9.36 -58% vs market $0.00 $0.00 $0.00 $0.00
LABORER: PIPELAYER $9.32 $0.00 $9.32 Bottom 10% -58% vs market $0.00 $0.00 $0.00 $0.00
OPERATOR: BACKHOE/EXCAVATOR/TRACKHOE $12.00 $0.00 $12.00 Bottom 10% $0.00 $0.00 $0.00 $0.00
OPERATOR: GRADER/BLADE, EXCLUDES NATURAL GAS PIPELINE CONSTRUCTION $13.61 $0.00 $13.61 Top 10% $0.00 $0.00 $0.00 $0.00
OPERATOR: LOADER $12.00 $0.00 $12.00 $0.00 $0.00 $0.00 $0.00
OPERATOR: POWER EQUIPMENT BACKHOE/EXCAVATOR/TRACKHOE, BLADE/GRADER, BOOM, BULLDOZER, CRANE, MECHANIC, TRENCHER: NATURAL GAS PIPELINE CONSTRUCTION ONLY $35.68 $17.57 $53.25 Top 10% $0.00 $0.00 $0.00 $0.00
OPERATOR: POWER EQUIPMENT OILER: NATURAL GAS PIPELINE CONSTRUCTION ONLY $22.03 $11.88 $33.91 Top 10% $0.00 $0.00 $0.00 $0.00
OPERATOR: ROLLER $10.89 $0.00 $10.89 Bottom 10% $0.00 $0.00 $0.00 $0.00
PASS, SWAMP BUGGY/ MARSH BUGGY, OR SIMILAR TYPE EQUIPMENT, TEAM DRIVER, WATER TRUCK NATURAL GAS PIPELINE CONSTRUCTION ONLY PREMIUM PAY: ADD $2.25 TO T $40.66 $15.75 $56.41 $0.00 $0.00 $0.00 $0.00
PREMIUM PAY: ADD $2.25 TO THE ABOVE RATE $41.06 $15.75 $56.81 $0.00 $0.00 $0.00 $0.00
PREMIUM PAY: ADD $2.25 TO THE ABOVE RATE $41.71 $15.75 $57.46 $0.00 $0.00 $0.00 $0.00
TRUCK DRIVER $12.00 $0.00 $12.00 -58% vs market $0.00 $0.00 $0.00 $0.00

Crew Labor Cost Estimator

Estimate total federal-contract labor cost using the Sevier, UT — Heavy construction prevailing wage rates. Add a row for each trade in your crew, set the number of workers and hours, and optionally add a burden percentage for payroll taxes, workers’ comp, and insurance.

Trade Workers Hours/worker Rate $/hr Subtotal
|
Direct labor subtotal
$0.00
Loaded cost (with burden)
$0.00

This is an estimate only. Burden percentages vary widely by state, employer experience modifier, and benefit plan structure. Davis-Bacon also requires per-trade record-keeping on Form WH-347; this calculator does not replace certified payroll reporting.

Other Construction Types in Sevier

Compliance Notes

Full Davis-Bacon compliance guide →

View full revision history for UT20260029-17769-hvy →