Heavy Construction — Sanpete, Utah
WD UT20260027-17790-hvy · Revision 1 · Effective May 17, 2026
The Davis-Bacon prevailing wage for CEMENT MASON/CONCRETE FINISHER in Sanpete, Utah (construction type: heavy) is $14.00/hr base + $0.56/hr fringe = $14.56/hr total package (WD UT20260027-17790-hvy, Rev. 1).
Scroll down for all 35 trade classifications covered by this determination.
Prevailing Wage Rates — All Trades
Base hourly rates and fringe benefit requirements for all trade classifications covered by this wage determination. Total package = base + fringe.
| Trade Classification | Base $/hr | Fringe $/hr | Total Package | H&W | Pension | Vacation | Training |
|---|---|---|---|---|---|---|---|
| CEMENT MASON/CONCRETE FINISHER | $14.00 | $0.56 | $14.56 -45% vs market | $0.00 | $0.00 | $0.00 | $0.00 |
| LABORER: COMMON OR GENERAL | $11.86 | $1.28 | $13.14 Above median -41% vs market | $0.00 | $0.00 | $0.00 | $0.00 |
| LABORER: MASON TENDER - CEMENT/CONCRETE | $9.00 | $0.36 | $9.36 -58% vs market | $0.00 | $0.00 | $0.00 | $0.00 |
| LABORER: PIPELAYER | $13.00 | $0.00 | $13.00 -41% vs market | $0.00 | $0.00 | $0.00 | $0.00 |
| OPERATOR: BACKHOE/EXCAVATOR/TRACKHOE | $16.55 | $0.00 | $16.55 | $0.00 | $0.00 | $0.00 | $0.00 |
| OPERATOR: GRADER/BLADE | $14.08 | $0.00 | $14.08 Bottom 10% | $0.00 | $0.00 | $0.00 | $0.00 |
| OPERATOR: LOADER | $15.89 | $4.75 | $20.64 Above median | $0.00 | $0.00 | $0.00 | $0.00 |
| OPERATOR: ROLLER | $11.62 | $0.00 | $11.62 Bottom 10% | $0.00 | $0.00 | $0.00 | $0.00 |
| TRUCK DRIVER: ARTICULATED | $32.14 | $14.65 | $46.79 Top 10% +63% vs market | $0.00 | $0.00 | $0.00 | $0.00 |
| TRUCK DRIVER: CONCRETE PUMPING | $29.62 | $14.65 | $44.27 Top 10% +55% vs market | $0.00 | $0.00 | $0.00 | $0.00 |
| TRUCK DRIVER: DUMP TRUCK, BOTTOM-END OR SIDE | $29.37 | $14.65 | $44.02 Bottom 10% +54% vs market | $0.00 | $0.00 | $0.00 | $0.00 |
| TRUCK DRIVER: DUMP TRUCK, BOTTOM-END OR SIDE | $30.56 | $14.65 | $45.21 Above median +58% vs market | $0.00 | $0.00 | $0.00 | $0.00 |
| TRUCK DRIVER: DUMP TRUCK, BOTTOM-END OR SIDE | $29.53 | $14.65 | $44.18 +54% vs market | $0.00 | $0.00 | $0.00 | $0.00 |
| TRUCK DRIVER: DUMP TRUCK, BOTTOM-END OR SIDE | $30.34 | $14.65 | $44.99 Above median +57% vs market | $0.00 | $0.00 | $0.00 | $0.00 |
| TRUCK DRIVER: DUMP TRUCK, BOTTOM-END OR SIDE | $30.12 | $14.65 | $44.77 Above median +56% vs market | $0.00 | $0.00 | $0.00 | $0.00 |
| TRUCK DRIVER: DUMP TRUCK, BOTTOM-END OR SIDE | $29.91 | $14.65 | $44.56 +56% vs market | $0.00 | $0.00 | $0.00 | $0.00 |
| TRUCK DRIVER: DUMP TRUCK, BOTTOM-END OR SIDE | $29.67 | $14.65 | $44.32 +55% vs market | $0.00 | $0.00 | $0.00 | $0.00 |
| TRUCK DRIVER: DUMP TRUCK, BOTTOM-END OR SIDE | $30.69 | $14.65 | $45.34 Top 10% +58% vs market | $0.00 | $0.00 | $0.00 | $0.00 |
| TRUCK DRIVER: FLAT RACK, BULK CEMENT, SEMI-TRAILERS, MUD/BANDING AND PAINT | $29.69 | $14.65 | $44.34 Top 10% +55% vs market | $0.00 | $0.00 | $0.00 | $0.00 |
| TRUCK DRIVER: FLAT RACK, BULK CEMENT, SEMI-TRAILERS, MUD/BANDING AND PAINT | $29.53 | $14.65 | $44.18 Above median +54% vs market | $0.00 | $0.00 | $0.00 | $0.00 |
| TRUCK DRIVER: FLAT RACK, BULK CEMENT, SEMI-TRAILERS, MUD/BANDING AND PAINT | $29.42 | $14.65 | $44.07 Bottom 10% +54% vs market | $0.00 | $0.00 | $0.00 | $0.00 |
| TRUCK DRIVER: FLAT RACK, BULK CEMENT, SEMI-TRAILERS, MUD/BANDING AND PAINT.$ 29.18 14.65 TRUCK DRIVER: FLAT RACK, BULK CEMENT, SEMI-TRAILERS, MUD/BAND | $29.26 | $14.65 | $43.91 Top 10% +53% vs market | $0.00 | $0.00 | $0.00 | $0.00 |
| TRUCK DRIVER: LOWBOY | $32.69 | $14.65 | $47.34 Above median +65% vs market | $0.00 | $0.00 | $0.00 | $0.00 |
| TRUCK DRIVER: OIL SPREADER | $32.68 | $14.65 | $47.33 Top 10% +65% vs market | $0.00 | $0.00 | $0.00 | $0.00 |
| TRUCK DRIVER: TRANSIT MIX | $29.72 | $14.65 | $44.37 Top 10% +55% vs market | $0.00 | $0.00 | $0.00 | $0.00 |
| TRUCK DRIVER: TRANSIT MIX.$ 29.62 14.65 TRUCK DRIVER: TIREMEN AND GREASER | $30.19 | $14.65 | $44.84 Top 10% +57% vs market | $0.00 | $0.00 | $0.00 | $0.00 |
| TRUCK DRIVER: WATER, FUEL & OIL TANK | $29.24 | $14.65 | $43.89 +53% vs market | $0.00 | $0.00 | $0.00 | $0.00 |
| TRUCK DRIVER: WATER, FUEL & OIL TANK | $30.12 | $14.65 | $44.77 Above median +56% vs market | $0.00 | $0.00 | $0.00 | $0.00 |
| TRUCK DRIVER: WATER, FUEL & OIL TANK | $30.06 | $14.65 | $44.71 Above median +56% vs market | $0.00 | $0.00 | $0.00 | $0.00 |
| TRUCK DRIVER: WATER, FUEL & OIL TANK | $31.20 | $14.65 | $45.85 Top 10% +60% vs market | $0.00 | $0.00 | $0.00 | $0.00 |
| TRUCK DRIVER: WATER, FUEL & OIL TANK | $31.04 | $14.65 | $45.69 Above median +60% vs market | $0.00 | $0.00 | $0.00 | $0.00 |
| TRUCK DRIVER: WATER, FUEL & OIL TANK | $29.53 | $14.65 | $44.18 +54% vs market | $0.00 | $0.00 | $0.00 | $0.00 |
| TRUCK DRIVER: WATER, FUEL & OIL TANK | $30.66 | $14.65 | $45.31 Above median +58% vs market | $0.00 | $0.00 | $0.00 | $0.00 |
| TRUCK DRIVER: WATER, FUEL & OIL TANK | $30.59 | $14.65 | $45.24 Above median +58% vs market | $0.00 | $0.00 | $0.00 | $0.00 |
| TRUCK DRIVER: WATER, FUEL & OIL TANK | $29.37 | $14.65 | $44.02 +54% vs market | $0.00 | $0.00 | $0.00 | $0.00 |
Crew Labor Cost Estimator
Estimate total federal-contract labor cost using the Sanpete, UT — Heavy construction prevailing wage rates. Add a row for each trade in your crew, set the number of workers and hours, and optionally add a burden percentage for payroll taxes, workers’ comp, and insurance.
| Trade | Workers | Hours/worker | Rate $/hr | Subtotal |
|---|
This is an estimate only. Burden percentages vary widely by state, employer experience modifier, and benefit plan structure. Davis-Bacon also requires per-trade record-keeping on Form WH-347; this calculator does not replace certified payroll reporting.
Other Construction Types in Sanpete
Compliance Notes
- This wage determination applies to federal contracts for heavy construction in Sanpete, Utah.
- The Davis-Bacon Act applies to contracts ≥$2,000 involving construction, alteration, or repair of federal or federally assisted buildings.
- The total package (base + fringe) is the minimum hourly labor cost per worker. Employers may satisfy fringe requirements by contributing to bona fide benefit plans.
- Apprentices must be registered with a DOL-approved apprenticeship program to be paid apprentice rates.
- Contractors must post this wage determination at the job site. Certified payroll records must be submitted weekly using Form WH-347.
- If a trade classification you need isn't listed below, request a conformance from the DOL Wage and Hour Division.