Residential Construction — San Juan, Utah

WD UT20260004-17773-res · Revision 1 · Effective May 17, 2026

Revision history →
Quick Answer

The Davis-Bacon prevailing wage for CARPENTER in San Juan, Utah (construction type: residential) is $10.00/hr base + $0.00/hr fringe = $10.00/hr total package (WD UT20260004-17773-res, Rev. 1).

Scroll down for all 11 trade classifications covered by this determination.

WD Number: UT20260004-17773-res
Revision: 1
Construction Type: residential
State: Utah (UT)
County: San Juan
Effective: May 17, 2026
Trades covered: 11
Official source: SAM.gov reference UT20260004View on SAM.gov →

Prevailing Wage Rates — All Trades

Base hourly rates and fringe benefit requirements for all trade classifications covered by this wage determination. Total package = base + fringe.

Trade Classification Base $/hr Fringe $/hr Total Package H&W Pension Vacation Training
CARPENTER $10.00 $0.00 $10.00 Bottom 10% -60% vs market $0.00 $0.00 $0.00 $0.00
CEMENT MASON/CONCRETE FINISHER $8.96 $0.00 $8.96 Bottom 10% -66% vs market $0.00 $0.00 $0.00 $0.00
FLOOR LAYER: CARPET..$ 11.00 0.00 ELECTRICIAN $12.76 $0.00 $12.76 -40% vs market $0.00 $0.00 $0.00 $0.00
INSULATOR, BATT & BLOWN $7.25 $0.00 $7.25 -69% vs market $0.00 $0.00 $0.00 $0.00
LABORER, GENERAL $7.25 $0.00 $7.25 Bottom 10% -67% vs market $0.00 $0.00 $0.00 $0.00
LATHER $10.00 $0.00 $10.00 Bottom 10% $0.00 $0.00 $0.00 $0.00
PAINTER, BRUSH, SPRAY AND ROLLER $8.79 $0.00 $8.79 -60% vs market $0.00 $0.00 $0.00 $0.00
PLASTERER $10.00 $0.00 $10.00 Bottom 10% -61% vs market $0.00 $0.00 $0.00 $0.00
PLUMBER $11.07 $0.00 $11.07 Bottom 10% -63% vs market $0.00 $0.00 $0.00 $0.00
POWER EQUIPMENT OPERATOR - BACKHOE $8.75 $0.00 $8.75 Above median -70% vs market $0.00 $0.00 $0.00 $0.00
ROOFER $8.76 $0.00 $8.76 Bottom 10% -63% vs market $0.00 $0.00 $0.00 $0.00

Crew Labor Cost Estimator

Estimate total federal-contract labor cost using the San Juan, UT — Residential construction prevailing wage rates. Add a row for each trade in your crew, set the number of workers and hours, and optionally add a burden percentage for payroll taxes, workers’ comp, and insurance.

Trade Workers Hours/worker Rate $/hr Subtotal
|
Direct labor subtotal
$0.00
Loaded cost (with burden)
$0.00

This is an estimate only. Burden percentages vary widely by state, employer experience modifier, and benefit plan structure. Davis-Bacon also requires per-trade record-keeping on Form WH-347; this calculator does not replace certified payroll reporting.

Other Construction Types in San Juan

Compliance Notes

Full Davis-Bacon compliance guide →

View full revision history for UT20260004-17773-res →