Highway Construction — Rich, Utah

WD UT20260103-17787-hwy · Revision 1 · Effective May 17, 2026

Revision history →
Quick Answer

The Davis-Bacon prevailing wage for CARPENTER, INCLUDES FORM WORK in Rich, Utah (construction type: highway) is $22.34/hr base + $3.48/hr fringe = $25.82/hr total package (WD UT20260103-17787-hwy, Rev. 1).

Scroll down for all 29 trade classifications covered by this determination.

WD Number: UT20260103-17787-hwy
Revision: 1
Construction Type: highway
State: Utah (UT)
County: Rich
Effective: May 17, 2026
Trades covered: 29
Official source: SAM.gov reference UT20260103View on SAM.gov →

Prevailing Wage Rates — All Trades

Base hourly rates and fringe benefit requirements for all trade classifications covered by this wage determination. Total package = base + fringe.

Trade Classification Base $/hr Fringe $/hr Total Package H&W Pension Vacation Training
CARPENTER, INCLUDES FORM WORK $22.34 $3.48 $25.82 Above median +4% vs market $0.00 $0.00 $0.00 $0.00
CEMENT MASON/CONCRETE FINISHER $21.21 $2.87 $24.08 -10% vs market $0.00 $0.00 $0.00 $0.00
ELECTRICIAN $26.83 $0.00 $26.83 -9% vs market $0.00 $0.00 $0.00 $0.00
FENCE ERECTOR $15.86 $2.84 $18.70 Top 10% $0.00 $0.00 $0.00 $0.00
HIGHWAY/PARKING LOT STRIPING: PAINTER $19.26 $1.62 $20.88 Above median $0.00 $0.00 $0.00 $0.00
INSTALLER - SIGN $17.48 $2.73 $20.21 Above median $0.00 $0.00 $0.00 $0.00
LABORER: ASPHALT, INCLUDES RAKER, SHOVELER, SPREADER AND DISTRIBUTOR $24.66 $8.65 $33.31 Above median +50% vs market $0.00 $0.00 $0.00 $0.00
LABORER: COMMON OR GENERAL $18.36 $5.42 $23.78 Above median +7% vs market $0.00 $0.00 $0.00 $0.00
LABORER: LANDSCAPE $15.16 $2.79 $17.95 Above median -19% vs market $0.00 $0.00 $0.00 $0.00
LABORER: MASON TENDER - CEMENT/CONCRETE $16.62 $2.71 $19.33 Above median -13% vs market $0.00 $0.00 $0.00 $0.00
LABORER: PIPELAYER $18.04 $2.79 $20.83 Above median -6% vs market $0.00 $0.00 $0.00 $0.00
OPERATOR: BACKHOE/EXCAVATOR/TRACKHOE $21.33 $5.83 $27.16 Above median $0.00 $0.00 $0.00 $0.00
OPERATOR: BOBCAT/SKID STEER/SKID LOADER $20.05 $3.31 $23.36 Above median $0.00 $0.00 $0.00 $0.00
OPERATOR: BROOM/SWEEPER $20.28 $7.41 $27.69 Above median $0.00 $0.00 $0.00 $0.00
OPERATOR: BULLDOZER $24.21 $1.59 $25.80 Above median $0.00 $0.00 $0.00 $0.00
OPERATOR: CONCRETE FINISHING MACHINE $22.57 $6.55 $29.12 Top 10% $0.00 $0.00 $0.00 $0.00
OPERATOR: GRADER/BLADE $27.92 $15.65 $43.57 Top 10% $0.00 $0.00 $0.00 $0.00
OPERATOR: LOADER $25.37 $15.65 $41.02 Top 10% $0.00 $0.00 $0.00 $0.00
OPERATOR: MECHANIC $27.43 $15.65 $43.08 Above median $0.00 $0.00 $0.00 $0.00
OPERATOR: MILLING MACHINE $27.81 $7.26 $35.07 Above median $0.00 $0.00 $0.00 $0.00
OPERATOR: OILER $19.00 $5.44 $24.44 Above median $0.00 $0.00 $0.00 $0.00
OPERATOR: PAVER $24.37 $15.65 $40.02 Top 10% $0.00 $0.00 $0.00 $0.00
OPERATOR: ROLLER $23.46 $15.65 $39.11 Above median $0.00 $0.00 $0.00 $0.00
OPERATOR: SCREED $26.14 $12.31 $38.45 Top 10% $0.00 $0.00 $0.00 $0.00
TRAFFIC CONTROL: FLAGGER $15.00 $4.13 $19.13 Above median $0.00 $0.00 $0.00 $0.00
TRAFFIC CONTROL: LABORER-CONES/ BARRICADES/BARRELS - SETTER/MOVER/SWEEPER $20.31 $8.65 $28.96 Above median $0.00 $0.00 $0.00 $0.00
TRUCK DRIVER: DUMP TRUCK $22.32 $9.09 $31.41 Above median +10% vs market $0.00 $0.00 $0.00 $0.00
TRUCK DRIVER: OIL DISTRIBUTOR TRUCK $27.34 $8.55 $35.89 Top 10% +25% vs market $0.00 $0.00 $0.00 $0.00
TRUCK DRIVER: WATER TRUCK $22.83 $11.01 $33.84 Above median +18% vs market $0.00 $0.00 $0.00 $0.00

Crew Labor Cost Estimator

Estimate total federal-contract labor cost using the Rich, UT — Highway construction prevailing wage rates. Add a row for each trade in your crew, set the number of workers and hours, and optionally add a burden percentage for payroll taxes, workers’ comp, and insurance.

Trade Workers Hours/worker Rate $/hr Subtotal
|
Direct labor subtotal
$0.00
Loaded cost (with burden)
$0.00

This is an estimate only. Burden percentages vary widely by state, employer experience modifier, and benefit plan structure. Davis-Bacon also requires per-trade record-keeping on Form WH-347; this calculator does not replace certified payroll reporting.

Other Construction Types in Rich

Compliance Notes

Full Davis-Bacon compliance guide →

View full revision history for UT20260103-17787-hwy →