Highway Construction — Morgan, Utah

WD UT20260108-17775-hwy · Revision 1 · Effective May 17, 2026

Revision history →
Quick Answer

The Davis-Bacon prevailing wage for CARPENTER, INCLUDES FORM WORK in Morgan, Utah (construction type: highway) is $22.84/hr base + $4.64/hr fringe = $27.48/hr total package (WD UT20260108-17775-hwy, Rev. 1).

Scroll down for all 34 trade classifications covered by this determination.

WD Number: UT20260108-17775-hwy
Revision: 1
Construction Type: highway
State: Utah (UT)
County: Morgan
Effective: May 17, 2026
Trades covered: 34
Official source: SAM.gov reference UT20260108View on SAM.gov →

Prevailing Wage Rates — All Trades

Base hourly rates and fringe benefit requirements for all trade classifications covered by this wage determination. Total package = base + fringe.

Trade Classification Base $/hr Fringe $/hr Total Package H&W Pension Vacation Training
CARPENTER, INCLUDES FORM WORK $22.84 $4.64 $27.48 Above median +11% vs market $0.00 $0.00 $0.00 $0.00
CEMENT MASON/CONCRETE FINISHER $21.19 $6.82 $28.01 +5% vs market $0.00 $0.00 $0.00 $0.00
ELECTRICIAN, INCLUDES LOW VOLTAGE WIRING $32.24 $7.85 $40.09 Above median +36% vs market $0.00 $0.00 $0.00 $0.00
FENCE ERECTOR $15.07 $2.53 $17.60 Top 10% $0.00 $0.00 $0.00 $0.00
HIGHWAY/PARKING LOT STRIPING: PAINTER $14.05 $1.62 $15.67 Bottom 10% $0.00 $0.00 $0.00 $0.00
INSTALLER - SIGN $16.95 $5.87 $22.82 Top 10% $0.00 $0.00 $0.00 $0.00
IRONWORKER, REINFORCING $26.61 $13.76 $40.37 Above median +76% vs market $0.00 $0.00 $0.00 $0.00
LABORER: ASPHALT, INCLUDES RAKER, SHOVELER, SPREADER AND DISTRIBUTOR $21.97 $8.65 $30.62 Above median +38% vs market $0.00 $0.00 $0.00 $0.00
LABORER: COMMON OR GENERAL $20.08 $7.06 $27.14 Above median +22% vs market $0.00 $0.00 $0.00 $0.00
LABORER: GRADE CHECKER $21.21 $6.30 $27.51 Above median +24% vs market $0.00 $0.00 $0.00 $0.00
LABORER: LANDSCAPE $14.76 $2.53 $17.29 Above median -22% vs market $0.00 $0.00 $0.00 $0.00
LABORER: MASON TENDER - CEMENT/CONCRETE $17.36 $2.53 $19.89 Above median -10% vs market $0.00 $0.00 $0.00 $0.00
LABORER: PIPELAYER $17.13 $3.54 $20.67 Above median -7% vs market $0.00 $0.00 $0.00 $0.00
OPERATOR: BACKHOE/EXCAVATOR/TRACKHOE $22.08 $7.77 $29.85 Above median $0.00 $0.00 $0.00 $0.00
OPERATOR: BOBCAT/SKID STEER/SKID LOADER $19.76 $3.31 $23.07 $0.00 $0.00 $0.00 $0.00
OPERATOR: BROOM/SWEEPER $24.12 $5.52 $29.64 Above median $0.00 $0.00 $0.00 $0.00
OPERATOR: CONCRETE FINISHING MACHINE $20.03 $6.55 $26.58 Above median $0.00 $0.00 $0.00 $0.00
OPERATOR: CRANE $30.66 $10.61 $41.27 Above median $0.00 $0.00 $0.00 $0.00
OPERATOR: DRILL $27.44 $15.65 $43.09 Above median $0.00 $0.00 $0.00 $0.00
OPERATOR: GRADER/BLADE $27.87 $15.65 $43.52 Top 10% $0.00 $0.00 $0.00 $0.00
OPERATOR: LOADER $23.78 $15.65 $39.43 Above median $0.00 $0.00 $0.00 $0.00
OPERATOR: MECHANIC $30.40 $15.65 $46.05 Above median $0.00 $0.00 $0.00 $0.00
OPERATOR: MILLING MACHINE $23.58 $15.65 $39.23 Above median $0.00 $0.00 $0.00 $0.00
OPERATOR: OILER $22.18 $9.73 $31.91 Above median $0.00 $0.00 $0.00 $0.00
OPERATOR: PAVEMENT MARKING GRINDER $24.37 $15.65 $40.02 Top 10% $0.00 $0.00 $0.00 $0.00
OPERATOR: PAVER $24.40 $15.65 $40.05 Top 10% $0.00 $0.00 $0.00 $0.00
OPERATOR: ROLLER $23.63 $15.65 $39.28 Above median $0.00 $0.00 $0.00 $0.00
OPERATOR: SCREED $24.45 $15.65 $40.10 Top 10% $0.00 $0.00 $0.00 $0.00
TRAFFIC CONTROL: FLAGGER $20.59 $8.65 $29.24 Above median $0.00 $0.00 $0.00 $0.00
TRAFFIC CONTROL: LABORER-CONES/ BARRICADES/BARRELS - SETTER/MOVER/SWEEPER $20.59 $7.56 $28.15 Above median $0.00 $0.00 $0.00 $0.00
TRUCK DRIVER: DUMP TRUCK $24.16 $11.77 $35.93 Top 10% +25% vs market $0.00 $0.00 $0.00 $0.00
TRUCK DRIVER: OIL DISTRIBUTOR TRUCK $26.25 $12.86 $39.11 Top 10% +37% vs market $0.00 $0.00 $0.00 $0.00
TRUCK DRIVER: VACTOR $23.40 $0.00 $23.40 Top 10% -18% vs market $0.00 $0.00 $0.00 $0.00
TRUCK DRIVER: WATER TRUCK $24.90 $11.70 $36.60 Top 10% +28% vs market $0.00 $0.00 $0.00 $0.00

Crew Labor Cost Estimator

Estimate total federal-contract labor cost using the Morgan, UT — Highway construction prevailing wage rates. Add a row for each trade in your crew, set the number of workers and hours, and optionally add a burden percentage for payroll taxes, workers’ comp, and insurance.

Trade Workers Hours/worker Rate $/hr Subtotal
|
Direct labor subtotal
$0.00
Loaded cost (with burden)
$0.00

This is an estimate only. Burden percentages vary widely by state, employer experience modifier, and benefit plan structure. Davis-Bacon also requires per-trade record-keeping on Form WH-347; this calculator does not replace certified payroll reporting.