Residential Construction — Millard, Utah

WD UT20260006-17788-res · Revision 1 · Effective May 17, 2026

Revision history →
Quick Answer

The Davis-Bacon prevailing wage for BRICKLAYER in Millard, Utah (construction type: residential) is $7.25/hr base + $0.47/hr fringe = $7.72/hr total package (WD UT20260006-17788-res, Rev. 1).

Scroll down for all 16 trade classifications covered by this determination.

WD Number: UT20260006-17788-res
Revision: 1
Construction Type: residential
State: Utah (UT)
County: Millard
Effective: May 17, 2026
Trades covered: 16
Official source: SAM.gov reference UT20260006View on SAM.gov →

Prevailing Wage Rates — All Trades

Base hourly rates and fringe benefit requirements for all trade classifications covered by this wage determination. Total package = base + fringe.

Trade Classification Base $/hr Fringe $/hr Total Package H&W Pension Vacation Training
BRICKLAYER $7.25 $0.47 $7.72 Bottom 10% -72% vs market $0.00 $0.00 $0.00 $0.00
CARPENTER $7.25 $0.00 $7.25 Bottom 10% -71% vs market $0.00 $0.00 $0.00 $0.00
CEMENT MASON/CONCRETE FINISHER $7.25 $0.00 $7.25 Bottom 10% -73% vs market $0.00 $0.00 $0.00 $0.00
DRYWALL MECHANIC $7.25 $0.00 $7.25 -70% vs market $0.00 $0.00 $0.00 $0.00
ELECTRICIAN $7.25 $0.00 $7.25 Bottom 10% -75% vs market $0.00 $0.00 $0.00 $0.00
HVAC MECHANIC $7.25 $0.00 $7.25 Bottom 10% -73% vs market $0.00 $0.00 $0.00 $0.00
LABORER $7.25 $0.00 $7.25 Bottom 10% -67% vs market $0.00 $0.00 $0.00 $0.00
LABORER: MASON TENDER $7.25 $0.00 $7.25 Bottom 10% -67% vs market $0.00 $0.00 $0.00 $0.00
PAINTER: BRUSH ONLY $7.25 $0.00 $7.25 Bottom 10% -67% vs market $0.00 $0.00 $0.00 $0.00
PLUMBER $7.25 $0.00 $7.25 Bottom 10% -76% vs market $0.00 $0.00 $0.00 $0.00
POWER EQUIPMENT OPERATORS: BULLDOZERS $7.25 $0.00 $7.25 Above median -75% vs market $0.00 $0.00 $0.00 $0.00
POWER EQUIPMENT OPERATORS: CRANES, DERRICKS, DRAGLINES $7.25 $0.00 $7.25 -75% vs market $0.00 $0.00 $0.00 $0.00
POWER EQUIPMENT OPERATORS: TRENCHING MACHINES $7.25 $0.00 $7.25 -75% vs market $0.00 $0.00 $0.00 $0.00
ROOFER $7.25 $0.00 $7.25 Bottom 10% -70% vs market $0.00 $0.00 $0.00 $0.00
SHEET METAL WORKER $7.25 $0.00 $7.25 Bottom 10% -75% vs market $0.00 $0.00 $0.00 $0.00
TRUCK DRIVER $7.25 $0.00 $7.25 Bottom 10% -75% vs market $0.00 $0.00 $0.00 $0.00

Crew Labor Cost Estimator

Estimate total federal-contract labor cost using the Millard, UT — Residential construction prevailing wage rates. Add a row for each trade in your crew, set the number of workers and hours, and optionally add a burden percentage for payroll taxes, workers’ comp, and insurance.

Trade Workers Hours/worker Rate $/hr Subtotal
|
Direct labor subtotal
$0.00
Loaded cost (with burden)
$0.00

This is an estimate only. Burden percentages vary widely by state, employer experience modifier, and benefit plan structure. Davis-Bacon also requires per-trade record-keeping on Form WH-347; this calculator does not replace certified payroll reporting.

Other Construction Types in Millard

Compliance Notes

Full Davis-Bacon compliance guide →

View full revision history for UT20260006-17788-res →