Highway Construction — Grand, Utah

WD UT20260010-17772-hwy · Revision 1 · Effective May 17, 2026

Revision history →
Quick Answer

The Davis-Bacon prevailing wage for CARPENTER, INCLUDES FORM WORK in Grand, Utah (construction type: highway) is $22.07/hr base + $6.88/hr fringe = $28.95/hr total package (WD UT20260010-17772-hwy, Rev. 1).

Scroll down for all 28 trade classifications covered by this determination.

WD Number: UT20260010-17772-hwy
Revision: 1
Construction Type: highway
State: Utah (UT)
County: Grand
Effective: May 17, 2026
Trades covered: 28
Official source: SAM.gov reference UT20260010View on SAM.gov →

Prevailing Wage Rates — All Trades

Base hourly rates and fringe benefit requirements for all trade classifications covered by this wage determination. Total package = base + fringe.

Trade Classification Base $/hr Fringe $/hr Total Package H&W Pension Vacation Training
CARPENTER, INCLUDES FORM WORK $22.07 $6.88 $28.95 Above median +16% vs market $0.00 $0.00 $0.00 $0.00
CEMENT MASON/CONCRETE FINISHER $17.36 $2.04 $19.40 -27% vs market $0.00 $0.00 $0.00 $0.00
ELECTRICIAN $26.83 $0.00 $26.83 -9% vs market $0.00 $0.00 $0.00 $0.00
HIGHWAY/PARKING LOT STRIPING: PAINTER $16.76 $1.62 $18.38 $0.00 $0.00 $0.00 $0.00
INSTALLER - GUARDRAIL $17.79 $0.00 $17.79 Above median $0.00 $0.00 $0.00 $0.00
INSTALLER - SIGN $18.22 $2.79 $21.01 Top 10% $0.00 $0.00 $0.00 $0.00
LABORER: ASPHALT, INCLUDES RAKER, SHOVELER, SPREADER AND DISTRIBUTOR $19.88 $5.71 $25.59 Above median +15% vs market $0.00 $0.00 $0.00 $0.00
LABORER: COMMON OR GENERAL $13.37 $2.65 $16.02 Above median -28% vs market $0.00 $0.00 $0.00 $0.00
LABORER: LANDSCAPE $14.45 $2.79 $17.24 Above median -22% vs market $0.00 $0.00 $0.00 $0.00
LABORER: MASON TENDER - CEMENT/CONCRETE $17.03 $0.36 $17.39 Above median -22% vs market $0.00 $0.00 $0.00 $0.00
LABORER: PIPELAYER $15.52 $2.79 $18.31 Above median -17% vs market $0.00 $0.00 $0.00 $0.00
OPERATOR: BACKHOE/EXCAVATOR/TRACKHOE $22.10 $5.97 $28.07 Above median $0.00 $0.00 $0.00 $0.00
OPERATOR: BOBCAT/SKID STEER/SKID LOADER $20.05 $3.31 $23.36 Above median $0.00 $0.00 $0.00 $0.00
OPERATOR: BROOM/SWEEPER $18.29 $5.65 $23.94 Above median $0.00 $0.00 $0.00 $0.00
OPERATOR: BULLDOZER $21.77 $4.40 $26.17 Above median $0.00 $0.00 $0.00 $0.00
OPERATOR: CONCRETE FINISHING MACHINE $22.57 $6.55 $29.12 Top 10% $0.00 $0.00 $0.00 $0.00
OPERATOR: GRADER/BLADE $23.69 $5.95 $29.64 Above median $0.00 $0.00 $0.00 $0.00
OPERATOR: LOADER $22.53 $6.92 $29.45 Above median $0.00 $0.00 $0.00 $0.00
OPERATOR: MECHANIC $25.24 $10.96 $36.20 Above median $0.00 $0.00 $0.00 $0.00
OPERATOR: MILLING MACHINE $26.53 $6.00 $32.53 Above median $0.00 $0.00 $0.00 $0.00
OPERATOR: OILER $19.00 $5.44 $24.44 Above median $0.00 $0.00 $0.00 $0.00
OPERATOR: PAVER $23.43 $8.13 $31.56 Above median $0.00 $0.00 $0.00 $0.00
OPERATOR: ROLLER $20.23 $5.61 $25.84 Above median $0.00 $0.00 $0.00 $0.00
OPERATOR: SCREED $19.89 $5.45 $25.34 Above median $0.00 $0.00 $0.00 $0.00
TRAFFIC CONTROL: FLAGGER $12.47 $2.53 $15.00 Above median $0.00 $0.00 $0.00 $0.00
TRAFFIC CONTROL: LABORER-CONES/ BARRICADES/BARRELS - SETTER/MOVER/SWEEPER $17.14 $2.79 $19.93 Above median $0.00 $0.00 $0.00 $0.00
TRUCK DRIVER: DUMP TRUCK $20.31 $4.06 $24.37 Above median -15% vs market $0.00 $0.00 $0.00 $0.00
TRUCK DRIVER: WATER TRUCK $29.53 $14.65 $44.18 Top 10% +54% vs market $0.00 $0.00 $0.00 $0.00

Crew Labor Cost Estimator

Estimate total federal-contract labor cost using the Grand, UT — Highway construction prevailing wage rates. Add a row for each trade in your crew, set the number of workers and hours, and optionally add a burden percentage for payroll taxes, workers’ comp, and insurance.

Trade Workers Hours/worker Rate $/hr Subtotal
|
Direct labor subtotal
$0.00
Loaded cost (with burden)
$0.00

This is an estimate only. Burden percentages vary widely by state, employer experience modifier, and benefit plan structure. Davis-Bacon also requires per-trade record-keeping on Form WH-347; this calculator does not replace certified payroll reporting.

Other Construction Types in Grand

Compliance Notes

Full Davis-Bacon compliance guide →

View full revision history for UT20260010-17772-hwy →