Highway Construction — Duchesne, Utah
WD UT20260007-17792-hwy · Revision 1 · Effective May 17, 2026
The Davis-Bacon prevailing wage for CARPENTER, INCLUDES FORM WORK in Duchesne, Utah (construction type: highway) is $22.34/hr base + $3.48/hr fringe = $25.82/hr total package (WD UT20260007-17792-hwy, Rev. 1).
Scroll down for all 29 trade classifications covered by this determination.
Prevailing Wage Rates — All Trades
Base hourly rates and fringe benefit requirements for all trade classifications covered by this wage determination. Total package = base + fringe.
| Trade Classification | Base $/hr | Fringe $/hr | Total Package | H&W | Pension | Vacation | Training |
|---|---|---|---|---|---|---|---|
| CARPENTER, INCLUDES FORM WORK | $22.34 | $3.48 | $25.82 Above median +4% vs market | $0.00 | $0.00 | $0.00 | $0.00 |
| CEMENT MASON/CONCRETE FINISHER | $21.21 | $2.87 | $24.08 -10% vs market | $0.00 | $0.00 | $0.00 | $0.00 |
| ELECTRICIAN | $26.83 | $0.00 | $26.83 -9% vs market | $0.00 | $0.00 | $0.00 | $0.00 |
| FENCE ERECTOR | $15.86 | $2.84 | $18.70 Top 10% | $0.00 | $0.00 | $0.00 | $0.00 |
| HIGHWAY/PARKING LOT STRIPING: PAINTER | $19.26 | $1.62 | $20.88 Above median | $0.00 | $0.00 | $0.00 | $0.00 |
| INSTALLER - SIGN | $17.48 | $2.73 | $20.21 Above median | $0.00 | $0.00 | $0.00 | $0.00 |
| LABORER: ASPHALT, INCLUDES RAKER, SHOVELER, SPREADER AND DISTRIBUTOR | $24.66 | $8.65 | $33.31 Above median +50% vs market | $0.00 | $0.00 | $0.00 | $0.00 |
| LABORER: COMMON OR GENERAL | $16.57 | $2.58 | $19.15 Above median -14% vs market | $0.00 | $0.00 | $0.00 | $0.00 |
| LABORER: LANDSCAPE | $15.16 | $2.79 | $17.95 Above median -19% vs market | $0.00 | $0.00 | $0.00 | $0.00 |
| LABORER: MASON TENDER - CEMENT/CONCRETE | $16.62 | $2.71 | $19.33 Above median -13% vs market | $0.00 | $0.00 | $0.00 | $0.00 |
| LABORER: PIPELAYER | $18.04 | $2.79 | $20.83 Above median -6% vs market | $0.00 | $0.00 | $0.00 | $0.00 |
| OPERATOR: BACKHOE/EXCAVATOR/TRACKHOE | $21.33 | $5.83 | $27.16 Above median | $0.00 | $0.00 | $0.00 | $0.00 |
| OPERATOR: BOBCAT/SKID STEER/SKID LOADER | $20.05 | $3.31 | $23.36 Above median | $0.00 | $0.00 | $0.00 | $0.00 |
| OPERATOR: BROOM/SWEEPER | $19.60 | $7.41 | $27.01 Above median | $0.00 | $0.00 | $0.00 | $0.00 |
| OPERATOR: BULLDOZER | $24.21 | $1.59 | $25.80 Above median | $0.00 | $0.00 | $0.00 | $0.00 |
| OPERATOR: CONCRETE FINISHING MACHINE | $22.57 | $6.55 | $29.12 Top 10% | $0.00 | $0.00 | $0.00 | $0.00 |
| OPERATOR: GRADER/BLADE | $27.92 | $15.65 | $43.57 Top 10% | $0.00 | $0.00 | $0.00 | $0.00 |
| OPERATOR: LOADER | $25.37 | $15.65 | $41.02 Top 10% | $0.00 | $0.00 | $0.00 | $0.00 |
| OPERATOR: MECHANIC | $27.43 | $15.65 | $43.08 Above median | $0.00 | $0.00 | $0.00 | $0.00 |
| OPERATOR: MILLING MACHINE | $27.81 | $7.26 | $35.07 Above median | $0.00 | $0.00 | $0.00 | $0.00 |
| OPERATOR: OILER | $19.00 | $5.44 | $24.44 Above median | $0.00 | $0.00 | $0.00 | $0.00 |
| OPERATOR: PAVER | $26.52 | $13.33 | $39.85 Top 10% | $0.00 | $0.00 | $0.00 | $0.00 |
| OPERATOR: ROLLER | $23.50 | $4.97 | $28.47 Above median | $0.00 | $0.00 | $0.00 | $0.00 |
| OPERATOR: SCREED | $27.15 | $13.59 | $40.74 Top 10% | $0.00 | $0.00 | $0.00 | $0.00 |
| TRAFFIC CONTROL: FLAGGER | $12.33 | $1.72 | $14.05 Above median | $0.00 | $0.00 | $0.00 | $0.00 |
| TRAFFIC CONTROL: LABORER-CONES/ BARRICADES/BARRELS - SETTER/MOVER/SWEEPER | $20.31 | $8.65 | $28.96 Above median | $0.00 | $0.00 | $0.00 | $0.00 |
| TRUCK DRIVER: DUMP TRUCK | $20.44 | $4.07 | $24.51 Above median -14% vs market | $0.00 | $0.00 | $0.00 | $0.00 |
| TRUCK DRIVER: OIL DISTRIBUTOR TRUCK | $27.34 | $8.55 | $35.89 Top 10% +25% vs market | $0.00 | $0.00 | $0.00 | $0.00 |
| TRUCK DRIVER: WATER TRUCK | $22.83 | $11.01 | $33.84 Above median +18% vs market | $0.00 | $0.00 | $0.00 | $0.00 |
Crew Labor Cost Estimator
Estimate total federal-contract labor cost using the Duchesne, UT — Highway construction prevailing wage rates. Add a row for each trade in your crew, set the number of workers and hours, and optionally add a burden percentage for payroll taxes, workers’ comp, and insurance.
| Trade | Workers | Hours/worker | Rate $/hr | Subtotal |
|---|
This is an estimate only. Burden percentages vary widely by state, employer experience modifier, and benefit plan structure. Davis-Bacon also requires per-trade record-keeping on Form WH-347; this calculator does not replace certified payroll reporting.
Other Construction Types in Duchesne
Compliance Notes
- This wage determination applies to federal contracts for highway construction in Duchesne, Utah.
- The Davis-Bacon Act applies to contracts ≥$2,000 involving construction, alteration, or repair of federal or federally assisted buildings.
- The total package (base + fringe) is the minimum hourly labor cost per worker. Employers may satisfy fringe requirements by contributing to bona fide benefit plans.
- Apprentices must be registered with a DOL-approved apprenticeship program to be paid apprentice rates.
- Contractors must post this wage determination at the job site. Certified payroll records must be submitted weekly using Form WH-347.
- If a trade classification you need isn't listed below, request a conformance from the DOL Wage and Hour Division.