Building Construction — St Thomas, U.S. Virgin Islands

WD VI20260001-20013-bld · Revision 1 · Effective May 17, 2026

Revision history →
Quick Answer

The Davis-Bacon prevailing wage for CARPENTER in St Thomas, U.S. Virgin Islands (construction type: building) is $7.25/hr base + $0.00/hr fringe = $7.25/hr total package (WD VI20260001-20013-bld, Rev. 1).

Scroll down for all 19 trade classifications covered by this determination.

WD Number: VI20260001-20013-bld
Revision: 1
Construction Type: building
State: U.S. Virgin Islands (VI)
County: St Thomas
Effective: May 17, 2026
Trades covered: 19
Official source: SAM.gov reference VI20260001View on SAM.gov →

Prevailing Wage Rates — All Trades

Base hourly rates and fringe benefit requirements for all trade classifications covered by this wage determination. Total package = base + fringe.

Trade Classification Base $/hr Fringe $/hr Total Package H&W Pension Vacation Training
CARPENTER $7.25 $0.00 $7.25 Bottom 10% $0.00 $0.00 $0.00 $0.00
CEMENT MASON/CONCRETE FINISHER $7.25 $0.00 $7.25 Bottom 10% $0.00 $0.00 $0.00 $0.00
ELECTRICIAN $7.63 $0.00 $7.63 Bottom 10% $0.00 $0.00 $0.00 $0.00
IRONWORKER $7.25 $0.00 $7.25 Bottom 10% $0.00 $0.00 $0.00 $0.00
LABORERS $7.25 $0.00 $7.25 Bottom 10% $0.00 $0.00 $0.00 $0.00
LABORERS: MASON TENDERS $7.25 $0.00 $7.25 Above median $0.00 $0.00 $0.00 $0.00
PAINTER $7.25 $0.00 $7.25 Bottom 10% $0.00 $0.00 $0.00 $0.00
PLUMBER $7.25 $0.00 $7.25 Bottom 10% $0.00 $0.00 $0.00 $0.00
POWER EQUIPMENT OPERATORS $7.50 $0.00 $7.50 $0.00 $0.00 $0.00 $0.00
POWER EQUIPMENT OPERATORS $7.45 $0.00 $7.45 $0.00 $0.00 $0.00 $0.00
POWER EQUIPMENT OPERATORS: ASPHALT MACHINE OPERATORS $7.62 $0.00 $7.62 $0.00 $0.00 $0.00 $0.00
POWER EQUIPMENT OPERATORS: BULLDOZER $7.54 $0.00 $7.54 $0.00 $0.00 $0.00 $0.00
POWER EQUIPMENT OPERATORS: CHERRY PICKERS $7.25 $0.00 $7.25 $0.00 $0.00 $0.00 $0.00
POWER EQUIPMENT OPERATORS: CRANE $7.60 $0.00 $7.60 Bottom 10% $0.00 $0.00 $0.00 $0.00
POWER EQUIPMENT OPERATORS: FORK LIFT OPERATORS $7.25 $0.00 $7.25 $0.00 $0.00 $0.00 $0.00
POWER EQUIPMENT OPERATORS: RIGGERS $7.92 $0.00 $7.92 $0.00 $0.00 $0.00 $0.00
SHEET ROCK MECHANIC $7.25 $0.00 $7.25 $0.00 $0.00 $0.00 $0.00
TRUCK DRIVER $7.25 $0.00 $7.25 Bottom 10% $0.00 $0.00 $0.00 $0.00
WELDER $7.25 $0.00 $7.25 Bottom 10% $0.00 $0.00 $0.00 $0.00

Crew Labor Cost Estimator

Estimate total federal-contract labor cost using the St Thomas, VI — Building construction prevailing wage rates. Add a row for each trade in your crew, set the number of workers and hours, and optionally add a burden percentage for payroll taxes, workers’ comp, and insurance.

Trade Workers Hours/worker Rate $/hr Subtotal
|
Direct labor subtotal
$0.00
Loaded cost (with burden)
$0.00

This is an estimate only. Burden percentages vary widely by state, employer experience modifier, and benefit plan structure. Davis-Bacon also requires per-trade record-keeping on Form WH-347; this calculator does not replace certified payroll reporting.

Other Construction Types in St Thomas

Compliance Notes

Full Davis-Bacon compliance guide →

View full revision history for VI20260001-20013-bld →