Building Construction — Travis, Texas

WD TX20260271-14807-bld · Revision 1 · Effective May 17, 2026

Revision history →
Quick Answer

The Davis-Bacon prevailing wage for ASBESTOS WORKER/HEAT & FROST INSULATOR in Travis, Texas (construction type: building) is $29.50/hr base + $8.79/hr fringe = $38.29/hr total package (WD TX20260271-14807-bld, Rev. 1).

Scroll down for all 47 trade classifications covered by this determination.

WD Number: TX20260271-14807-bld
Revision: 1
Construction Type: building
State: Texas (TX)
County: Travis
Effective: May 17, 2026
Trades covered: 47
Official source: SAM.gov reference TX20260271View on SAM.gov →

Prevailing Wage Rates — All Trades

Base hourly rates and fringe benefit requirements for all trade classifications covered by this wage determination. Total package = base + fringe.

Trade Classification Base $/hr Fringe $/hr Total Package H&W Pension Vacation Training
ASBESTOS WORKER/HEAT & FROST INSULATOR $29.50 $8.79 $38.29 Bottom 10% +66% vs market $0.00 $0.00 $0.00 $0.00
BOILERMAKER $33.17 $24.92 $58.09 +88% vs market $0.00 $0.00 $0.00 $0.00
BRICKLAYER $20.07 $0.00 $20.07 -18% vs market $0.00 $0.00 $0.00 $0.00
CARPENTER $31.80 $9.56 $41.36 +79% vs market $0.00 $0.00 $0.00 $0.00
CARPENTER $15.62 $0.05 $15.67 -32% vs market $0.00 $0.00 $0.00 $0.00
CARPENTER $14.00 $0.00 $14.00 -40% vs market $0.00 $0.00 $0.00 $0.00
CEMENT MASON/CONCRETE FINISHER $15.71 $0.00 $15.71 -30% vs market $0.00 $0.00 $0.00 $0.00
DRYWALL FINISHER/TAPER $17.06 $4.43 $21.49 Above median -1% vs market $0.00 $0.00 $0.00 $0.00
DRYWALL HANGER AND METAL STUD INSTALLER $17.47 $3.45 $20.92 Above median -13% vs market $0.00 $0.00 $0.00 $0.00
ELECTRICAL INSTALLER $18.00 $2.30 $20.30 $0.00 $0.00 $0.00 $0.00
ELECTRICIAN $36.50 $10.69 $47.19 +72% vs market $0.00 $0.00 $0.00 $0.00
ELEVATOR MECHANIC FOOTNOTE: A. 6% UNDER 5 YEARS BASED ON REGULAR HOURLY RATE FOR ALL HOURS WORKED. 8% OVER 5 YEARS BASED ON REGULAR HOURLY RATE FOR AL $51.59 $38.44 $90.03 Top 10% +98% vs market $0.00 $0.00 $0.00 $0.00
FLOOR LAYER: CARPET $21.88 $0.00 $21.88 +6% vs market $0.00 $0.00 $0.00 $0.00
GLAZIER $12.83 $0.00 $12.83 Bottom 10% -42% vs market $0.00 $0.00 $0.00 $0.00
HVAC MECHANIC $23.78 $6.89 $30.67 Top 10% +18% vs market $0.00 $0.00 $0.00 $0.00
IRONWORKER, REINFORCING $12.27 $0.00 $12.27 Bottom 10% -48% vs market $0.00 $0.00 $0.00 $0.00
IRONWORKER, STRUCTURAL $20.73 $5.24 $25.97 +9% vs market $0.00 $0.00 $0.00 $0.00
IRONWORKER: ORNAMENTAL $28.26 $8.13 $36.39 Bottom 10% +53% vs market $0.00 $0.00 $0.00 $0.00
LABORER: COMMON OR GENERAL $11.44 $0.00 $11.44 -38% vs market $0.00 $0.00 $0.00 $0.00
LABORER: MASON TENDER - BRICK $12.22 $0.00 $12.22 -33% vs market $0.00 $0.00 $0.00 $0.00
LABORER: MASON TENDER - CEMENT/CONCRETE $11.85 $0.00 $11.85 -35% vs market $0.00 $0.00 $0.00 $0.00
LABORER: PIPELAYER $12.45 $0.00 $12.45 -32% vs market $0.00 $0.00 $0.00 $0.00
LABORER: ROOF TEAROFF $11.28 $0.00 $11.28 Top 10% -39% vs market $0.00 $0.00 $0.00 $0.00
OPERATOR: BACKHOE/EXCAVATOR/TRACKHOE $19.43 $3.49 $22.92 Above median $0.00 $0.00 $0.00 $0.00
OPERATOR: BOBCAT/SKID STEER/SKID LOADER $13.00 $0.00 $13.00 Bottom 10% $0.00 $0.00 $0.00 $0.00
OPERATOR: BULLDOZER $14.00 $0.00 $14.00 $0.00 $0.00 $0.00 $0.00
OPERATOR: DRILL $14.50 $0.00 $14.50 Bottom 10% $0.00 $0.00 $0.00 $0.00
OPERATOR: FORKLIFT $16.64 $6.26 $22.90 $0.00 $0.00 $0.00 $0.00
OPERATOR: GRADER/BLADE $19.30 $0.00 $19.30 $0.00 $0.00 $0.00 $0.00
OPERATOR: LOADER $14.00 $0.00 $14.00 $0.00 $0.00 $0.00 $0.00
OPERATOR: MECHANIC $18.75 $5.12 $23.87 Above median $0.00 $0.00 $0.00 $0.00
OPERATOR: PAVER $16.03 $0.00 $16.03 $0.00 $0.00 $0.00 $0.00
OPERATOR: ROLLER $11.25 $0.00 $11.25 Bottom 10% $0.00 $0.00 $0.00 $0.00
PAINTER, EXCLUDES DRYWALL FINISHING/TAPING $18.76 $6.35 $25.11 Above median +18% vs market $0.00 $0.00 $0.00 $0.00
PIPEFITTER: INCLUDING HVAC PIPE INSTALLATION $37.15 $16.92 $54.07 +92% vs market $0.00 $0.00 $0.00 $0.00
PLUMBER, EXCLUDES HVAC PIPE INSTALLATION $23.57 $6.37 $29.94 +6% vs market $0.00 $0.00 $0.00 $0.00
POWER EQUIPMENT OPERATOR $39.47 $10.39 $49.86 Above median +109% vs market $0.00 $0.00 $0.00 $0.00
ROOFER $12.00 $0.00 $12.00 -45% vs market $0.00 $0.00 $0.00 $0.00
SHEET METAL WORKER $34.01 $16.10 $50.11 +87% vs market $0.00 $0.00 $0.00 $0.00
SPRINKLER FITTER $38.57 $24.47 $63.04 +124% vs market $0.00 $0.00 $0.00 $0.00
TILE FINISHER $11.32 $0.00 $11.32 Bottom 10% -46% vs market $0.00 $0.00 $0.00 $0.00
TILE SETTER $16.35 $0.00 $16.35 -22% vs market $0.00 $0.00 $0.00 $0.00
TRUCK DRIVER: DUMP TRUCK $12.39 $1.18 $13.57 -47% vs market $0.00 $0.00 $0.00 $0.00
TRUCK DRIVER: FLATBED TRUCK $19.65 $8.57 $28.22 Top 10% +11% vs market $0.00 $0.00 $0.00 $0.00
TRUCK DRIVER: SEMI-TRAILER TRUCK $12.50 $0.00 $12.50 Above median -51% vs market $0.00 $0.00 $0.00 $0.00
TRUCK DRIVER: WATER TRUCK $12.00 $4.11 $16.11 -37% vs market $0.00 $0.00 $0.00 $0.00
WATERPROOFER $16.30 $0.06 $16.36 $0.00 $0.00 $0.00 $0.00

Crew Labor Cost Estimator

Estimate total federal-contract labor cost using the Travis, TX — Building construction prevailing wage rates. Add a row for each trade in your crew, set the number of workers and hours, and optionally add a burden percentage for payroll taxes, workers’ comp, and insurance.

Trade Workers Hours/worker Rate $/hr Subtotal
|
Direct labor subtotal
$0.00
Loaded cost (with burden)
$0.00

This is an estimate only. Burden percentages vary widely by state, employer experience modifier, and benefit plan structure. Davis-Bacon also requires per-trade record-keeping on Form WH-347; this calculator does not replace certified payroll reporting.

Other Construction Types in Travis

Compliance Notes

Full Davis-Bacon compliance guide →

View full revision history for TX20260271-14807-bld →