Building Construction — Somervell, Texas

WD TX20260206-14875-bld · Revision 1 · Effective May 17, 2026

Revision history →
Quick Answer

The Davis-Bacon prevailing wage for ASBESTOS WORKER/HEAT & FROST INSULATOR in Somervell, Texas (construction type: building) is $33.23/hr base + $7.52/hr fringe = $40.75/hr total package (WD TX20260206-14875-bld, Rev. 1).

Scroll down for all 25 trade classifications covered by this determination.

WD Number: TX20260206-14875-bld
Revision: 1
Construction Type: building
State: Texas (TX)
County: Somervell
Effective: May 17, 2026
Trades covered: 25
Official source: SAM.gov reference TX20260206View on SAM.gov →

Prevailing Wage Rates — All Trades

Base hourly rates and fringe benefit requirements for all trade classifications covered by this wage determination. Total package = base + fringe.

Trade Classification Base $/hr Fringe $/hr Total Package H&W Pension Vacation Training
ASBESTOS WORKER/HEAT & FROST INSULATOR $33.23 $7.52 $40.75 Bottom 10% +77% vs market $0.00 $0.00 $0.00 $0.00
BOILERMAKER $33.17 $24.92 $58.09 +88% vs market $0.00 $0.00 $0.00 $0.00
BRICKLAYER $20.00 $0.00 $20.00 -18% vs market $0.00 $0.00 $0.00 $0.00
CARPENTER, INCLUDES ACOUSTICAL CEILING INSTALLATION, AND HARDWOOD FLOOR INSTALLATION $14.30 $0.00 $14.30 Top 10% -38% vs market $0.00 $0.00 $0.00 $0.00
CEMENT MASON/CONCRETE FINISHER $13.29 $0.00 $13.29 -41% vs market $0.00 $0.00 $0.00 $0.00
ELECTRICIAN $18.06 $4.87 $22.93 -16% vs market $0.00 $0.00 $0.00 $0.00
IRONWORKER, REINFORCING $29.64 $8.43 $38.07 Above median +60% vs market $0.00 $0.00 $0.00 $0.00
IRONWORKER, REINFORCING $28.30 $8.23 $36.53 Above median +54% vs market $0.00 $0.00 $0.00 $0.00
IRONWORKER, STRUCTURAL $15.48 $0.00 $15.48 Bottom 10% -35% vs market $0.00 $0.00 $0.00 $0.00
LABORER: COMMON OR GENERAL $9.73 $0.00 $9.73 -47% vs market $0.00 $0.00 $0.00 $0.00
LABORER: LANDSCAPE & IRRIGATION $8.50 $0.22 $8.72 Above median -53% vs market $0.00 $0.00 $0.00 $0.00
LABORER: MASON TENDER - BRICK $12.02 $0.00 $12.02 -35% vs market $0.00 $0.00 $0.00 $0.00
LABORER: MORTAR MIXER $12.00 $0.00 $12.00 Top 10% -35% vs market $0.00 $0.00 $0.00 $0.00
LABORERS: MASON TENDER - CEMENT/CONCRETE $25.27 $9.57 $34.84 Top 10% +90% vs market $0.00 $0.00 $0.00 $0.00
OPERATOR: BACKHOE/EXCAVATOR/TRACKHOE $11.00 $0.00 $11.00 Bottom 10% $0.00 $0.00 $0.00 $0.00
OPERATOR: BULLDOZER $13.00 $0.31 $13.31 $0.00 $0.00 $0.00 $0.00
OPERATOR: CRANE $21.33 $0.00 $21.33 $0.00 $0.00 $0.00 $0.00
OPERATOR: FORKLIFT $14.58 $0.00 $14.58 Bottom 10% $0.00 $0.00 $0.00 $0.00
OPERATOR: LOADER $10.54 $0.00 $10.54 Bottom 10% $0.00 $0.00 $0.00 $0.00
PAINTER: BRUSH, ROLLER AND SPRAY $13.50 $0.00 $13.50 -36% vs market $0.00 $0.00 $0.00 $0.00
PLUMBER $20.38 $4.74 $25.12 -11% vs market $0.00 $0.00 $0.00 $0.00
ROOFER $13.64 $1.80 $15.44 -29% vs market $0.00 $0.00 $0.00 $0.00
SHEET METAL WORKER $17.00 $0.00 $17.00 Bottom 10% -37% vs market $0.00 $0.00 $0.00 $0.00
TILE SETTER $15.00 $0.00 $15.00 -28% vs market $0.00 $0.00 $0.00 $0.00
TRUCK DRIVER $12.52 $0.00 $12.52 -51% vs market $0.00 $0.00 $0.00 $0.00

Crew Labor Cost Estimator

Estimate total federal-contract labor cost using the Somervell, TX — Building construction prevailing wage rates. Add a row for each trade in your crew, set the number of workers and hours, and optionally add a burden percentage for payroll taxes, workers’ comp, and insurance.

Trade Workers Hours/worker Rate $/hr Subtotal
|
Direct labor subtotal
$0.00
Loaded cost (with burden)
$0.00

This is an estimate only. Burden percentages vary widely by state, employer experience modifier, and benefit plan structure. Davis-Bacon also requires per-trade record-keeping on Form WH-347; this calculator does not replace certified payroll reporting.

Other Construction Types in Somervell

Compliance Notes

Full Davis-Bacon compliance guide →

View full revision history for TX20260206-14875-bld →