WD TX20260267-16840-bld · Revision 1 · Effective May 17, 2026

Revision history →
Quick Answer

The Davis-Bacon prevailing wage for BOILERMAKER in Robertson, Texas (construction type: building) is $33.17/hr base + $24.92/hr fringe = $58.09/hr total package (WD TX20260267-16840-bld, Rev. 1).

Scroll down for all 40 trade classifications covered by this determination.

WD Number: TX20260267-16840-bld
Revision: 1
Construction Type: building
State: Texas (TX)
County: Robertson
Effective: May 17, 2026
Trades covered: 40
Official source: SAM.gov reference TX20260267View on SAM.gov →

Prevailing Wage Rates — All Trades

Base hourly rates and fringe benefit requirements for all trade classifications covered by this wage determination. Total package = base + fringe.

Trade Classification Base $/hr Fringe $/hr Total Package H&W Pension Vacation Training
BOILERMAKER $33.17 $24.92 $58.09 +88% vs market $0.00 $0.00 $0.00 $0.00
BRICKLAYER $20.00 $0.00 $20.00 -18% vs market $0.00 $0.00 $0.00 $0.00
CARPENTER, EXCLUDES FORM WORK $15.50 $0.00 $15.50 -33% vs market $0.00 $0.00 $0.00 $0.00
CEMENT MASON/CONCRETE FINISHER $14.68 $0.00 $14.68 -35% vs market $0.00 $0.00 $0.00 $0.00
ELECTRICIAN $22.96 $4.83 $27.79 +2% vs market $0.00 $0.00 $0.00 $0.00
ELEVATOR MECHANIC: FOOTNOTES: A. 6% UNDER 5 YEARS BASED ON REGULAR HOURLY RATE FOR ALL HOURS WORKED. 8% OVER 5 YEARS BASED ON REGULAR HOURLY RATE FOR $53.59 $38.44 $92.03 Top 10% +102% vs market $0.00 $0.00 $0.00 $0.00
FORM WORKER $11.83 $0.00 $11.83 $0.00 $0.00 $0.00 $0.00
INSULATOR - MECHANICAL $19.77 $7.13 $26.90 Above median +17% vs market $0.00 $0.00 $0.00 $0.00
IRONWORKER, REINFORCING $13.35 $0.00 $13.35 Bottom 10% -44% vs market $0.00 $0.00 $0.00 $0.00
IRONWORKER, STRUCTURAL $20.74 $5.25 $25.99 +9% vs market $0.00 $0.00 $0.00 $0.00
IRONWORKER: ORNAMENTAL $28.26 $8.13 $36.39 Bottom 10% +53% vs market $0.00 $0.00 $0.00 $0.00
LABORER: COMMON OR GENERAL $12.00 $0.00 $12.00 -35% vs market $0.00 $0.00 $0.00 $0.00
LABORER: MASON TENDER - BRICK $10.96 $0.00 $10.96 -40% vs market $0.00 $0.00 $0.00 $0.00
LABORER: MASON TENDER - CEMENT/CONCRETE $9.93 $0.00 $9.93 -46% vs market $0.00 $0.00 $0.00 $0.00
LABORER: PIPELAYER $12.49 $2.13 $14.62 -20% vs market $0.00 $0.00 $0.00 $0.00
LABORER: ROOF TEAROFF $11.28 $0.00 $11.28 Top 10% -39% vs market $0.00 $0.00 $0.00 $0.00
OPERATOR: BACKHOE/EXCAVATOR/TRACKHOE $14.33 $0.00 $14.33 $0.00 $0.00 $0.00 $0.00
OPERATOR: BOBCAT/SKID STEER/SKID LOADER $13.93 $0.00 $13.93 Bottom 10% $0.00 $0.00 $0.00 $0.00
OPERATOR: BULLDOZER $18.29 $1.31 $19.60 Above median $0.00 $0.00 $0.00 $0.00
OPERATOR: DRILL $16.22 $0.34 $16.56 $0.00 $0.00 $0.00 $0.00
OPERATOR: FORKLIFT $15.00 $0.00 $15.00 $0.00 $0.00 $0.00 $0.00
OPERATOR: GRADER/BLADE $14.34 $1.68 $16.02 $0.00 $0.00 $0.00 $0.00
OPERATOR: LOADER $14.01 $0.44 $14.45 $0.00 $0.00 $0.00 $0.00
OPERATOR: MECHANIC $17.52 $3.33 $20.85 Above median $0.00 $0.00 $0.00 $0.00
OPERATOR: PAVER $16.03 $0.00 $16.03 $0.00 $0.00 $0.00 $0.00
OPERATOR: ROLLER $13.11 $0.00 $13.11 $0.00 $0.00 $0.00 $0.00
PAINTER: BRUSH, ROLLER, AND SPRAY $13.14 $0.00 $13.14 -38% vs market $0.00 $0.00 $0.00 $0.00
PIPEFITTER $42.09 $12.96 $55.05 +96% vs market $0.00 $0.00 $0.00 $0.00
PIPEFITTER $37.15 $16.92 $54.07 +92% vs market $0.00 $0.00 $0.00 $0.00
PLUMBER $39.98 $11.61 $51.59 Above median +83% vs market $0.00 $0.00 $0.00 $0.00
POWER EQUIPMENT OPERATOR ( HYDRAULIC CRANES 59 TONS AND UNDER) $32.35 $13.10 $45.45 Top 10% +90% vs market $0.00 $0.00 $0.00 $0.00
POWER EQUIPMENT OPERATOR ( TOWER CRANE) $32.85 $13.10 $45.95 Top 10% +93% vs market $0.00 $0.00 $0.00 $0.00
SHEET METAL WORKER $29.70 $13.85 $43.55 +62% vs market $0.00 $0.00 $0.00 $0.00
SHEET METAL WORKER, EXCLUDES HVAC DUCT INSTALLATION.$ 14.62 0.00 ROOFER $13.75 $0.00 $13.75 -49% vs market $0.00 $0.00 $0.00 $0.00
TILE FINISHER $11.22 $0.00 $11.22 Bottom 10% -46% vs market $0.00 $0.00 $0.00 $0.00
TILE SETTER $14.74 $0.00 $14.74 -30% vs market $0.00 $0.00 $0.00 $0.00
TRUCK DRIVER: DUMP TRUCK $11.97 $1.23 $13.20 -48% vs market $0.00 $0.00 $0.00 $0.00
TRUCK DRIVER: FLATBED TRUCK $19.65 $8.57 $28.22 Top 10% +11% vs market $0.00 $0.00 $0.00 $0.00
TRUCK DRIVER: SEMI-TRAILER TRUCK $12.50 $0.00 $12.50 Above median -51% vs market $0.00 $0.00 $0.00 $0.00
TRUCK DRIVER: WATER TRUCK $12.00 $4.11 $16.11 -37% vs market $0.00 $0.00 $0.00 $0.00

Crew Labor Cost Estimator

Estimate total federal-contract labor cost using the Robertson, TX — Building construction prevailing wage rates. Add a row for each trade in your crew, set the number of workers and hours, and optionally add a burden percentage for payroll taxes, workers’ comp, and insurance.

Trade Workers Hours/worker Rate $/hr Subtotal
|
Direct labor subtotal
$0.00
Loaded cost (with burden)
$0.00

This is an estimate only. Burden percentages vary widely by state, employer experience modifier, and benefit plan structure. Davis-Bacon also requires per-trade record-keeping on Form WH-347; this calculator does not replace certified payroll reporting.

Other Construction Types in Robertson

Compliance Notes

Full Davis-Bacon compliance guide →

View full revision history for TX20260267-16840-bld →