Residential Construction — Orange, Texas

WD TX20260012-14820-res · Revision 1 · Effective May 17, 2026

Revision history →
Quick Answer

The Davis-Bacon prevailing wage for CARPENTER in Orange, Texas (construction type: residential) is $14.45/hr base + $0.00/hr fringe = $14.45/hr total package (WD TX20260012-14820-res, Rev. 1).

Scroll down for all 11 trade classifications covered by this determination.

WD Number: TX20260012-14820-res
Revision: 1
Construction Type: residential
State: Texas (TX)
County: Orange
Effective: May 17, 2026
Trades covered: 11
Official source: SAM.gov reference TX20260012View on SAM.gov →

Prevailing Wage Rates — All Trades

Base hourly rates and fringe benefit requirements for all trade classifications covered by this wage determination. Total package = base + fringe.

Trade Classification Base $/hr Fringe $/hr Total Package H&W Pension Vacation Training
CARPENTER $14.45 $0.00 $14.45 -38% vs market $0.00 $0.00 $0.00 $0.00
DRYWALL FINISHER/TAPER $12.50 $0.00 $12.50 -42% vs market $0.00 $0.00 $0.00 $0.00
DRYWALL HANGER/FRAMER $13.32 $0.00 $13.32 -45% vs market $0.00 $0.00 $0.00 $0.00
ELECTRICIAN $33.76 $13.56 $47.32 +73% vs market $0.00 $0.00 $0.00 $0.00
HVAC MECHANIC $13.83 $0.00 $13.83 -47% vs market $0.00 $0.00 $0.00 $0.00
LABORER, COMMON $8.34 $0.00 $8.34 -55% vs market $0.00 $0.00 $0.00 $0.00
PAINTERS: BRUSH $12.50 $0.00 $12.50 Bottom 10% -41% vs market $0.00 $0.00 $0.00 $0.00
PAINTERS: ROLLER $12.50 $0.00 $12.50 -41% vs market $0.00 $0.00 $0.00 $0.00
PAINTERS: SPRAY $15.00 $0.00 $15.00 Bottom 10% -29% vs market $0.00 $0.00 $0.00 $0.00
ROOFER $12.00 $1.85 $13.85 -37% vs market $0.00 $0.00 $0.00 $0.00
SHEET METAL WORKER $11.00 $0.00 $11.00 Bottom 10% -59% vs market $0.00 $0.00 $0.00 $0.00

Crew Labor Cost Estimator

Estimate total federal-contract labor cost using the Orange, TX — Residential construction prevailing wage rates. Add a row for each trade in your crew, set the number of workers and hours, and optionally add a burden percentage for payroll taxes, workers’ comp, and insurance.

Trade Workers Hours/worker Rate $/hr Subtotal
|
Direct labor subtotal
$0.00
Loaded cost (with burden)
$0.00

This is an estimate only. Burden percentages vary widely by state, employer experience modifier, and benefit plan structure. Davis-Bacon also requires per-trade record-keeping on Form WH-347; this calculator does not replace certified payroll reporting.

Other Construction Types in Orange

Compliance Notes

Full Davis-Bacon compliance guide →

View full revision history for TX20260012-14820-res →