Building Construction — Moore, Texas

WD TX20260203-14969-bld · Revision 1 · Effective May 17, 2026

Revision history →
Quick Answer

The Davis-Bacon prevailing wage for BOILERMAKER in Moore, Texas (construction type: building) is $33.17/hr base + $24.92/hr fringe = $58.09/hr total package (WD TX20260203-14969-bld, Rev. 1).

Scroll down for all 22 trade classifications covered by this determination.

WD Number: TX20260203-14969-bld
Revision: 1
Construction Type: building
State: Texas (TX)
County: Moore
Effective: May 17, 2026
Trades covered: 22
Official source: SAM.gov reference TX20260203View on SAM.gov →

Prevailing Wage Rates — All Trades

Base hourly rates and fringe benefit requirements for all trade classifications covered by this wage determination. Total package = base + fringe.

Trade Classification Base $/hr Fringe $/hr Total Package H&W Pension Vacation Training
BOILERMAKER $33.17 $24.92 $58.09 +88% vs market $0.00 $0.00 $0.00 $0.00
BRICKLAYER $19.46 $0.00 $19.46 -21% vs market $0.00 $0.00 $0.00 $0.00
CARPENTER $28.57 $9.30 $37.87 +64% vs market $0.00 $0.00 $0.00 $0.00
CEMENT MASON/CONCRETE FINISHER $13.27 $0.00 $13.27 -41% vs market $0.00 $0.00 $0.00 $0.00
ELECTRICIAN $18.06 $4.87 $22.93 -16% vs market $0.00 $0.00 $0.00 $0.00
IRONWORKER: REINFORCING $29.64 $8.43 $38.07 +60% vs market $0.00 $0.00 $0.00 $0.00
LABORER: COMMON OR GENERAL $7.25 $0.00 $7.25 Bottom 10% -61% vs market $0.00 $0.00 $0.00 $0.00
LABORER: LANDSCAPE & IRRIGATION $8.50 $0.22 $8.72 Above median -53% vs market $0.00 $0.00 $0.00 $0.00
LABORER: MASON TENDER - BRICK $12.02 $0.00 $12.02 -35% vs market $0.00 $0.00 $0.00 $0.00
LABORER: MORTAR MIXER $12.00 $0.00 $12.00 Top 10% -35% vs market $0.00 $0.00 $0.00 $0.00
LABORERS: MASON TENDER - CEMENT/CONCRETE $25.27 $9.57 $34.84 Top 10% +90% vs market $0.00 $0.00 $0.00 $0.00
OPERATOR: BACKHOE/EXCAVATOR/TRACKHOE $13.75 $0.00 $13.75 $0.00 $0.00 $0.00 $0.00
OPERATOR: BULLDOZER $12.80 $0.43 $13.23 Bottom 10% $0.00 $0.00 $0.00 $0.00
OPERATOR: CRANE $21.33 $0.00 $21.33 $0.00 $0.00 $0.00 $0.00
OPERATOR: FORKLIFT $14.58 $0.00 $14.58 Bottom 10% $0.00 $0.00 $0.00 $0.00
OPERATOR: LOADER $10.54 $0.00 $10.54 Bottom 10% $0.00 $0.00 $0.00 $0.00
PAINTER: BRUSH, ROLLER AND SPRAY $12.26 $0.00 $12.26 -42% vs market $0.00 $0.00 $0.00 $0.00
PLUMBER $28.64 $10.65 $39.29 +40% vs market $0.00 $0.00 $0.00 $0.00
ROOFER $13.64 $1.80 $15.44 -29% vs market $0.00 $0.00 $0.00 $0.00
SHEET METAL WORKER $17.00 $0.00 $17.00 Bottom 10% -37% vs market $0.00 $0.00 $0.00 $0.00
TILE SETTER $15.00 $0.00 $15.00 -28% vs market $0.00 $0.00 $0.00 $0.00
TRUCK DRIVER $11.24 $0.35 $11.59 -55% vs market $0.00 $0.00 $0.00 $0.00

Crew Labor Cost Estimator

Estimate total federal-contract labor cost using the Moore, TX — Building construction prevailing wage rates. Add a row for each trade in your crew, set the number of workers and hours, and optionally add a burden percentage for payroll taxes, workers’ comp, and insurance.

Trade Workers Hours/worker Rate $/hr Subtotal
|
Direct labor subtotal
$0.00
Loaded cost (with burden)
$0.00

This is an estimate only. Burden percentages vary widely by state, employer experience modifier, and benefit plan structure. Davis-Bacon also requires per-trade record-keeping on Form WH-347; this calculator does not replace certified payroll reporting.

Other Construction Types in Moore

Compliance Notes

Full Davis-Bacon compliance guide →

View full revision history for TX20260203-14969-bld →