Davis-Bacon Wage Determinations — Matagorda, Texas

Matagorda has 4 active Davis-Bacon wage determinations. Select a construction type to view trade rates and fringe benefit requirements.

Quick Answer

Davis-Bacon prevailing wage determinations for Matagorda, Texas cover 4 construction types: Building, Heavy, Highway and Residential. Each determination sets the minimum base hourly wage and fringe benefits per trade classification for federal construction projects in the county. Select a construction type below for the full trade-by-trade rate table.

building Active
WD: TX20260216-14891-bld Rev. 2
Effective: May 17, 2026
View trade rates →
heavy Active
WD: TX20260075-14891-hvy Rev. 1
Effective: May 17, 2026
View trade rates →
highway Active
WD: TX20260300-14891-hwy Rev. 1
Effective: May 17, 2026
View trade rates →
residential Active
WD: TX20260106-14891-res Rev. 1
Effective: May 17, 2026
View trade rates →

Top-Paying Trades in Matagorda

Highest Davis-Bacon total packages (base + fringe) across this county's wage determinations. Each row shows the construction type that yields the highest rate for that trade.

# Trade Construction Type Base $/hr Fringe $/hr Total Package
1 BOILERMAKER building $33.17 $24.92 $58.09 WD →
2 PLUMBER building $39.98 $11.61 $51.59 WD →
3 Plumber building $38.97 $11.48 $50.45 WD →
4 ASBESTOS WORKER/HEAT & FROST INSULATOR building $30.20 $12.38 $42.58 WD →
5 IRONWORKER, STRUCTURAL AND REINFORCING building $28.26 $8.13 $36.39 WD →
6 IRONWORKER, REINFORCING AND STRUCTURAL building $27.95 $8.03 $35.98 WD →
7 Laborers building $25.27 $9.57 $34.84 WD →
8 LABORERS: MASON TENDER - CEMENT/CONCRETE building $25.27 $9.57 $34.84 WD →
9 ELECTRICIAN heavy $33.89 $0.00 $33.89 WD →
10 CRANE OPERATOR, HYDRAULIC OVER 80 TONS highway $31.44 $0.00 $31.44 WD →
Each wage determination above lists the minimum hourly base rate and required fringe benefits per trade classification. Full Davis-Bacon compliance guide →