Building Construction — Kenedy, Texas

WD TX20260211-15010-bld · Revision 1 · Effective May 17, 2026

Revision history →
Quick Answer

The Davis-Bacon prevailing wage for ASBESTOS WORKER/HEAT & FROST INSULATOR in Kenedy, Texas (construction type: building) is $30.50/hr base + $8.89/hr fringe = $39.39/hr total package (WD TX20260211-15010-bld, Rev. 1).

Scroll down for all 23 trade classifications covered by this determination.

WD Number: TX20260211-15010-bld
Revision: 1
Construction Type: building
State: Texas (TX)
County: Kenedy
Effective: May 17, 2026
Trades covered: 23
Official source: SAM.gov reference TX20260211View on SAM.gov →

Prevailing Wage Rates — All Trades

Base hourly rates and fringe benefit requirements for all trade classifications covered by this wage determination. Total package = base + fringe.

Trade Classification Base $/hr Fringe $/hr Total Package H&W Pension Vacation Training
ASBESTOS WORKER/HEAT & FROST INSULATOR $30.50 $8.89 $39.39 Bottom 10% +71% vs market $0.00 $0.00 $0.00 $0.00
BOILERMAKER $33.17 $24.92 $58.09 +88% vs market $0.00 $0.00 $0.00 $0.00
BRICKLAYER $17.76 $0.00 $17.76 -28% vs market $0.00 $0.00 $0.00 $0.00
CARPENTER $18.00 $0.00 $18.00 -22% vs market $0.00 $0.00 $0.00 $0.00
CEMENT MASON/CONCRETE FINISHER $13.27 $0.00 $13.27 -41% vs market $0.00 $0.00 $0.00 $0.00
ELECTRICIAN $15.85 $0.00 $15.85 Bottom 10% -42% vs market $0.00 $0.00 $0.00 $0.00
IRONWORKER: REINFORCING AND STRUCTURAL $27.95 $8.03 $35.98 Bottom 10% +51% vs market $0.00 $0.00 $0.00 $0.00
LABORER: COMMON OR GENERAL $8.50 $0.00 $8.50 Bottom 10% -54% vs market $0.00 $0.00 $0.00 $0.00
LABORER: LANDSCAPE & IRRIGATION $8.50 $0.22 $8.72 Above median -53% vs market $0.00 $0.00 $0.00 $0.00
LABORER: MASON TENDER - BRICK $12.02 $0.00 $12.02 -35% vs market $0.00 $0.00 $0.00 $0.00
LABORER: MORTAR MIXER $9.50 $0.00 $9.50 Bottom 10% -48% vs market $0.00 $0.00 $0.00 $0.00
LABORERS: MASON TENDER - CEMENT/CONCRETE $25.27 $9.57 $34.84 Top 10% +90% vs market $0.00 $0.00 $0.00 $0.00
OPERATOR: BACKHOE/EXCAVATOR/TRACKHOE $13.75 $0.00 $13.75 $0.00 $0.00 $0.00 $0.00
OPERATOR: BULLDOZER $12.80 $0.43 $13.23 Bottom 10% $0.00 $0.00 $0.00 $0.00
OPERATOR: CRANE $21.33 $0.00 $21.33 $0.00 $0.00 $0.00 $0.00
OPERATOR: FORKLIFT $14.58 $0.00 $14.58 Bottom 10% $0.00 $0.00 $0.00 $0.00
OPERATOR: LOADER $10.54 $0.00 $10.54 Bottom 10% $0.00 $0.00 $0.00 $0.00
PAINTER: BRUSH, ROLLER AND SPRAY $15.80 $0.00 $15.80 Above median -26% vs market $0.00 $0.00 $0.00 $0.00
PLUMBER, INCLUDES HVAC PIPE INSTALLATION $12.50 $0.00 $12.50 Bottom 10% -56% vs market $0.00 $0.00 $0.00 $0.00
ROOFER $15.10 $1.29 $16.39 -25% vs market $0.00 $0.00 $0.00 $0.00
SHEET METAL WORKER $17.00 $0.00 $17.00 Bottom 10% -37% vs market $0.00 $0.00 $0.00 $0.00
TILE SETTER $15.00 $0.00 $15.00 -28% vs market $0.00 $0.00 $0.00 $0.00
TRUCK DRIVER $11.24 $0.35 $11.59 -55% vs market $0.00 $0.00 $0.00 $0.00

Crew Labor Cost Estimator

Estimate total federal-contract labor cost using the Kenedy, TX — Building construction prevailing wage rates. Add a row for each trade in your crew, set the number of workers and hours, and optionally add a burden percentage for payroll taxes, workers’ comp, and insurance.

Trade Workers Hours/worker Rate $/hr Subtotal
|
Direct labor subtotal
$0.00
Loaded cost (with burden)
$0.00

This is an estimate only. Burden percentages vary widely by state, employer experience modifier, and benefit plan structure. Davis-Bacon also requires per-trade record-keeping on Form WH-347; this calculator does not replace certified payroll reporting.

Other Construction Types in Kenedy

Compliance Notes

Full Davis-Bacon compliance guide →

View full revision history for TX20260211-15010-bld →