Building Construction — Kaufman, Texas

WD TX20260281-14848-bld · Revision 1 · Effective May 17, 2026

Revision history →
Quick Answer

The Davis-Bacon prevailing wage for ASBESTOS WORKER/HEAT & FROST INSULATOR in Kaufman, Texas (construction type: building) is $33.23/hr base + $7.52/hr fringe = $40.75/hr total package (WD TX20260281-14848-bld, Rev. 1).

Scroll down for all 58 trade classifications covered by this determination.

WD Number: TX20260281-14848-bld
Revision: 1
Construction Type: building
State: Texas (TX)
County: Kaufman
Effective: May 17, 2026
Trades covered: 58
Official source: SAM.gov reference TX20260281View on SAM.gov →

Prevailing Wage Rates — All Trades

Base hourly rates and fringe benefit requirements for all trade classifications covered by this wage determination. Total package = base + fringe.

Trade Classification Base $/hr Fringe $/hr Total Package H&W Pension Vacation Training
ASBESTOS WORKER/HEAT & FROST INSULATOR $33.23 $7.52 $40.75 Bottom 10% +77% vs market $0.00 $0.00 $0.00 $0.00
BOILERMAKER $33.17 $24.92 $58.09 +88% vs market $0.00 $0.00 $0.00 $0.00
BRICKLAYER $19.89 $0.00 $19.89 -19% vs market $0.00 $0.00 $0.00 $0.00
CARPENTER, EXCLUDES DRYWALL HANGING, FORM WORK, AND METAL STUD INSTALLATION $16.62 $0.00 $16.62 -28% vs market $0.00 $0.00 $0.00 $0.00
CAULKER $15.16 $0.00 $15.16 $0.00 $0.00 $0.00 $0.00
CEMENT MASON/CONCRETE FINISHER $13.21 $0.00 $13.21 -41% vs market $0.00 $0.00 $0.00 $0.00
DRYWALL HANGER AND METAL STUD INSTALLER $15.42 $0.00 $15.42 -36% vs market $0.00 $0.00 $0.00 $0.00
ELECTRICIAN $17.97 $2.63 $20.60 -25% vs market $0.00 $0.00 $0.00 $0.00
ELECTRICIAN $17.62 $2.92 $20.54 -25% vs market $0.00 $0.00 $0.00 $0.00
ELECTRICIAN $20.93 $3.86 $24.79 -9% vs market $0.00 $0.00 $0.00 $0.00
ELECTRICIAN, EXCLUDES LOW VOLTAGE WIRING AND INSTALLATION OF ALARMS/SOUND AND COMMUNICATION SYSTEMS $20.65 $3.05 $23.70 Above median -13% vs market $0.00 $0.00 $0.00 $0.00
ELEVATOR MECHANIC: FOOTNOTES: A. 6% UNDER 5 YEARS BASED ON REGULAR HOURLY RATE FOR ALL HOURS WORKED. 8% OVER 5 YEARS BASED ON REGULAR HOURLY RATE FOR $51.93 $38.44 $90.37 Bottom 10% +99% vs market $0.00 $0.00 $0.00 $0.00
FORM WORKER $12.13 $0.00 $12.13 $0.00 $0.00 $0.00 $0.00
GLAZIER $16.55 $3.13 $19.68 -12% vs market $0.00 $0.00 $0.00 $0.00
HIGHWAY/PARKING LOT STRIPING: OPERATOR $10.04 $2.31 $12.35 $0.00 $0.00 $0.00 $0.00
HVAC MECHANIC $39.76 $14.04 $53.80 Top 10% +107% vs market $0.00 $0.00 $0.00 $0.00
INSTALLER - SIDING $14.74 $0.00 $14.74 Above median $0.00 $0.00 $0.00 $0.00
INSTALLER - SIGN $15.61 $0.00 $15.61 Above median $0.00 $0.00 $0.00 $0.00
INSULATOR - BATT $13.00 $0.00 $13.00 -44% vs market $0.00 $0.00 $0.00 $0.00
IRONWORKER, REINFORCING $12.37 $0.00 $12.37 Bottom 10% -48% vs market $0.00 $0.00 $0.00 $0.00
IRONWORKER: ORNAMENTAL AND STRUCTURAL $29.64 $8.43 $38.07 Bottom 10% +60% vs market $0.00 $0.00 $0.00 $0.00
LABORER: COMMON OR GENERAL $11.25 $0.00 $11.25 -39% vs market $0.00 $0.00 $0.00 $0.00
LABORER: LANDSCAPE AND IRRIGATION $11.09 $0.00 $11.09 -40% vs market $0.00 $0.00 $0.00 $0.00
LABORER: MASON TENDER - BRICK $10.54 $0.00 $10.54 -43% vs market $0.00 $0.00 $0.00 $0.00
LABORER: MASON TENDER - CEMENT/CONCRETE $10.75 $0.00 $10.75 -41% vs market $0.00 $0.00 $0.00 $0.00
LABORER: PIPELAYER $13.00 $0.35 $13.35 -27% vs market $0.00 $0.00 $0.00 $0.00
LABORER: PLASTER TENDER $12.22 $0.00 $12.22 Top 10% -33% vs market $0.00 $0.00 $0.00 $0.00
LABORER: ROOF TEAROFF $11.28 $0.00 $11.28 Top 10% -39% vs market $0.00 $0.00 $0.00 $0.00
LATHER $16.00 $0.00 $16.00 $0.00 $0.00 $0.00 $0.00
MILLWRIGHT $32.02 $11.27 $43.29 Bottom 10% +45% vs market $0.00 $0.00 $0.00 $0.00
OPERATOR: BACKHOE/EXCAVATOR/TRACKHOE $12.83 $0.00 $12.83 Bottom 10% $0.00 $0.00 $0.00 $0.00
OPERATOR: BOBCAT/SKID STEER/SKID LOADER $13.93 $0.00 $13.93 Bottom 10% $0.00 $0.00 $0.00 $0.00
OPERATOR: BULLDOZER $18.29 $1.31 $19.60 Above median $0.00 $0.00 $0.00 $0.00
OPERATOR: DRILL $15.69 $0.50 $16.19 $0.00 $0.00 $0.00 $0.00
OPERATOR: FORKLIFT $13.21 $0.81 $14.02 Bottom 10% $0.00 $0.00 $0.00 $0.00
OPERATOR: GRADER/BLADE $12.96 $0.00 $12.96 Bottom 10% $0.00 $0.00 $0.00 $0.00
OPERATOR: LOADER $13.46 $0.85 $14.31 $0.00 $0.00 $0.00 $0.00
OPERATOR: MECHANIC $17.52 $3.33 $20.85 Above median $0.00 $0.00 $0.00 $0.00
OPERATOR: PAVER $18.44 $0.00 $18.44 Above median $0.00 $0.00 $0.00 $0.00
OPERATOR: ROLLER $15.04 $0.00 $15.04 $0.00 $0.00 $0.00 $0.00
PAINTER, EXCLUDES DRYWALL FINISHING/TAPING $13.21 $2.33 $15.54 Above median -27% vs market $0.00 $0.00 $0.00 $0.00
PAINTER: DRYWALL FINISHING/TAPING ONLY $13.76 $2.84 $16.60 Bottom 10% -22% vs market $0.00 $0.00 $0.00 $0.00
PIPEFITTER $39.76 $14.04 $53.80 +91% vs market $0.00 $0.00 $0.00 $0.00
PLASTERER $15.75 $0.00 $15.75 Bottom 10% -30% vs market $0.00 $0.00 $0.00 $0.00
PLUMBER $22.16 $5.46 $27.62 -2% vs market $0.00 $0.00 $0.00 $0.00
PLUMBER, EXCLUDES HVAC PIPE INSTALLATION $22.31 $5.18 $27.49 -2% vs market $0.00 $0.00 $0.00 $0.00
POWER EQUIPMENT OPERATOR ( HYDRAULIC CRANES 59 TONS AND UNDER) $32.35 $13.10 $45.45 Top 10% +90% vs market $0.00 $0.00 $0.00 $0.00
POWER EQUIPMENT OPERATOR ( TOWER CRANE) $32.85 $13.10 $45.95 Top 10% +93% vs market $0.00 $0.00 $0.00 $0.00
ROOFER $17.19 $0.00 $17.19 -21% vs market $0.00 $0.00 $0.00 $0.00
SHEET METAL WORKER, EXCLUDES HVAC DUCT INSTALLATION.$ 24.88 5.97 SHEET METAL WORKER $20.88 $5.19 $26.07 -3% vs market $0.00 $0.00 $0.00 $0.00
SPRINKLER FITTER $22.94 $0.00 $22.94 Bottom 10% -19% vs market $0.00 $0.00 $0.00 $0.00
TILE FINISHER $11.22 $0.00 $11.22 Bottom 10% -46% vs market $0.00 $0.00 $0.00 $0.00
TILE SETTER $14.25 $0.00 $14.25 -32% vs market $0.00 $0.00 $0.00 $0.00
TRUCK DRIVER: 1/SINGLE AXLE TRUCK $16.40 $0.81 $17.21 Above median -33% vs market $0.00 $0.00 $0.00 $0.00
TRUCK DRIVER: DUMP TRUCK $12.39 $1.18 $13.57 -47% vs market $0.00 $0.00 $0.00 $0.00
TRUCK DRIVER: FLATBED TRUCK $19.65 $8.57 $28.22 Top 10% +11% vs market $0.00 $0.00 $0.00 $0.00
TRUCK DRIVER: SEMI-TRAILER TRUCK $12.50 $0.00 $12.50 Above median -51% vs market $0.00 $0.00 $0.00 $0.00
TRUCK DRIVER: WATER TRUCK $12.00 $4.11 $16.11 -37% vs market $0.00 $0.00 $0.00 $0.00

Crew Labor Cost Estimator

Estimate total federal-contract labor cost using the Kaufman, TX — Building construction prevailing wage rates. Add a row for each trade in your crew, set the number of workers and hours, and optionally add a burden percentage for payroll taxes, workers’ comp, and insurance.

Trade Workers Hours/worker Rate $/hr Subtotal
|
Direct labor subtotal
$0.00
Loaded cost (with burden)
$0.00

This is an estimate only. Burden percentages vary widely by state, employer experience modifier, and benefit plan structure. Davis-Bacon also requires per-trade record-keeping on Form WH-347; this calculator does not replace certified payroll reporting.

Other Construction Types in Kaufman

Compliance Notes

Full Davis-Bacon compliance guide →

View full revision history for TX20260281-14848-bld →