Heavy Construction — Jefferson, Texas

WD TX20260061-14817-hvy · Revision 1 · Effective May 17, 2026

Revision history →
Quick Answer

The Davis-Bacon prevailing wage for BRICKLAYER in Jefferson, Texas (construction type: heavy) is $32.08/hr base + $14.84/hr fringe = $46.92/hr total package (WD TX20260061-14817-hvy, Rev. 1).

Scroll down for all 8 trade classifications covered by this determination.

WD Number: TX20260061-14817-hvy
Revision: 1
Construction Type: heavy
State: Texas (TX)
County: Jefferson
Effective: May 17, 2026
Trades covered: 8
Official source: SAM.gov reference TX20260061View on SAM.gov →

Prevailing Wage Rates — All Trades

Base hourly rates and fringe benefit requirements for all trade classifications covered by this wage determination. Total package = base + fringe.

Trade Classification Base $/hr Fringe $/hr Total Package H&W Pension Vacation Training
BRICKLAYER $32.08 $14.84 $46.92 +91% vs market $0.00 $0.00 $0.00 $0.00
ELECTRICIAN $15.20 $0.40 $15.60 Bottom 10% -43% vs market $0.00 $0.00 $0.00 $0.00
INSULATOR/ASBESTOS WORKER $30.20 $16.62 $46.82 +103% vs market $0.00 $0.00 $0.00 $0.00
LABORER: COMMON $10.00 $0.00 $10.00 Bottom 10% -46% vs market $0.00 $0.00 $0.00 $0.00
MILLWRIGHT $19.72 $3.73 $23.45 Bottom 10% -21% vs market $0.00 $0.00 $0.00 $0.00
PIPEFITTER $13.20 $0.34 $13.54 Bottom 10% -52% vs market $0.00 $0.00 $0.00 $0.00
POWER EQUIPMENT OPERATOR: CRANE $15.20 $0.40 $15.60 Bottom 10% -35% vs market $0.00 $0.00 $0.00 $0.00
SHEET METAL WORKER $29.70 $13.85 $43.55 +62% vs market $0.00 $0.00 $0.00 $0.00

Crew Labor Cost Estimator

Estimate total federal-contract labor cost using the Jefferson, TX — Heavy construction prevailing wage rates. Add a row for each trade in your crew, set the number of workers and hours, and optionally add a burden percentage for payroll taxes, workers’ comp, and insurance.

Trade Workers Hours/worker Rate $/hr Subtotal
|
Direct labor subtotal
$0.00
Loaded cost (with burden)
$0.00

This is an estimate only. Burden percentages vary widely by state, employer experience modifier, and benefit plan structure. Davis-Bacon also requires per-trade record-keeping on Form WH-347; this calculator does not replace certified payroll reporting.

Other Construction Types in Jefferson

Compliance Notes

Full Davis-Bacon compliance guide →

View full revision history for TX20260061-14817-hvy →