Davis-Bacon Wage Determinations — Jackson, Texas

Jackson has 4 active Davis-Bacon wage determinations. Select a construction type to view trade rates and fringe benefit requirements.

Quick Answer

Davis-Bacon prevailing wage determinations for Jackson, Texas cover 4 construction types: Building, Heavy, Highway and Residential. Each determination sets the minimum base hourly wage and fringe benefits per trade classification for federal construction projects in the county. Select a construction type below for the full trade-by-trade rate table.

building Active
WD: TX20260158-14887-bld Rev. 1
Effective: May 17, 2026
View trade rates →
heavy Active
WD: TX20260088-14887-hvy Rev. 1
Effective: May 17, 2026
View trade rates →
highway Active
WD: TX20260300-14887-hwy Rev. 1
Effective: May 17, 2026
View trade rates →
residential Active
WD: TX20260106-14887-res Rev. 1
Effective: May 17, 2026
View trade rates →

Top-Paying Trades in Jackson

Highest Davis-Bacon total packages (base + fringe) across this county's wage determinations. Each row shows the construction type that yields the highest rate for that trade.

# Trade Construction Type Base $/hr Fringe $/hr Total Package
1 BOILERMAKER building $33.17 $24.92 $58.09 WD →
2 Plumber building $32.85 $12.74 $45.59 WD →
3 PLUMBER building $32.85 $12.74 $45.59 WD →
4 ASBESTOS WORKER/HEAT & FROST INSULATOR building $30.50 $8.89 $39.39 WD →
5 IRONWORKER building $29.64 $8.43 $38.07 WD →
6 IRONWORKER: REINFORCING building $29.64 $8.43 $38.07 WD →
7 LABORERS: MASON TENDER - CEMENT/CONCRETE building $25.27 $9.57 $34.84 WD →
8 Laborers building $25.27 $9.57 $34.84 WD →
9 Crane Operator, Hydraulic Over 80 Tons highway $31.44 $0.00 $31.44 WD →
10 CRANE OPERATOR, HYDRAULIC OVER 80 TONS highway $31.44 $0.00 $31.44 WD →
Each wage determination above lists the minimum hourly base rate and required fringe benefits per trade classification. Full Davis-Bacon compliance guide →