Building Construction — Hardin, Texas

WD TX20260252-14815-bld · Revision 1 · Effective May 17, 2026

Revision history →
Quick Answer

The Davis-Bacon prevailing wage for ASBESTOS WORKER/HEAT & FROST INSULATOR in Hardin, Texas (construction type: building) is $30.20/hr base + $12.38/hr fringe = $42.58/hr total package (WD TX20260252-14815-bld, Rev. 1).

Scroll down for all 39 trade classifications covered by this determination.

WD Number: TX20260252-14815-bld
Revision: 1
Construction Type: building
State: Texas (TX)
County: Hardin
Effective: May 17, 2026
Trades covered: 39
Official source: SAM.gov reference TX20260252View on SAM.gov →

Prevailing Wage Rates — All Trades

Base hourly rates and fringe benefit requirements for all trade classifications covered by this wage determination. Total package = base + fringe.

Trade Classification Base $/hr Fringe $/hr Total Package H&W Pension Vacation Training
ASBESTOS WORKER/HEAT & FROST INSULATOR $30.20 $12.38 $42.58 +84% vs market $0.00 $0.00 $0.00 $0.00
BOILERMAKER $33.17 $24.92 $58.09 +88% vs market $0.00 $0.00 $0.00 $0.00
BRICKLAYER $25.50 $8.12 $33.62 +37% vs market $0.00 $0.00 $0.00 $0.00
CARPENTER, EXCLUDES FORM WORK $18.57 $3.09 $21.66 Above median -6% vs market $0.00 $0.00 $0.00 $0.00
CEMENT MASON/CONCRETE FINISHER $13.44 $0.00 $13.44 -40% vs market $0.00 $0.00 $0.00 $0.00
ELECTRICIAN $33.76 $13.56 $47.32 +73% vs market $0.00 $0.00 $0.00 $0.00
FORM WORKER $13.69 $0.00 $13.69 $0.00 $0.00 $0.00 $0.00
IRONWORKER, REINFORCING $12.95 $0.00 $12.95 Bottom 10% -45% vs market $0.00 $0.00 $0.00 $0.00
IRONWORKER, STRUCTURAL $34.35 $14.44 $48.79 Above median +105% vs market $0.00 $0.00 $0.00 $0.00
IRONWORKER: ORNAMENTAL $28.26 $8.13 $36.39 Bottom 10% +53% vs market $0.00 $0.00 $0.00 $0.00
LABORER: COMMON OR GENERAL $12.15 $0.00 $12.15 -34% vs market $0.00 $0.00 $0.00 $0.00
LABORER: LANDSCAPE AND IRRIGATION $11.04 $0.36 $11.40 -38% vs market $0.00 $0.00 $0.00 $0.00
LABORER: MASON TENDER - BRICK $12.87 $0.00 $12.87 -30% vs market $0.00 $0.00 $0.00 $0.00
LABORER: MASON TENDER - CEMENT/CONCRETE $10.50 $0.00 $10.50 -43% vs market $0.00 $0.00 $0.00 $0.00
LABORER: PIPELAYER $13.47 $0.00 $13.47 -27% vs market $0.00 $0.00 $0.00 $0.00
LABORER: ROOF TEAROFF $11.28 $0.00 $11.28 Top 10% -39% vs market $0.00 $0.00 $0.00 $0.00
OPERATOR: BACKHOE/EXCAVATOR/TRACKHOE $19.74 $0.00 $19.74 $0.00 $0.00 $0.00 $0.00
OPERATOR: BOBCAT/SKID STEER/SKID LOADER $13.93 $0.00 $13.93 Bottom 10% $0.00 $0.00 $0.00 $0.00
OPERATOR: BULLDOZER $19.85 $0.07 $19.92 Above median $0.00 $0.00 $0.00 $0.00
OPERATOR: DRILL $16.22 $0.34 $16.56 $0.00 $0.00 $0.00 $0.00
OPERATOR: FORKLIFT $17.69 $0.00 $17.69 $0.00 $0.00 $0.00 $0.00
OPERATOR: GRADER/BLADE $13.37 $0.00 $13.37 Bottom 10% $0.00 $0.00 $0.00 $0.00
OPERATOR: LOADER $13.55 $0.94 $14.49 $0.00 $0.00 $0.00 $0.00
OPERATOR: MECHANIC $17.52 $3.33 $20.85 Above median $0.00 $0.00 $0.00 $0.00
OPERATOR: PAVER $16.03 $0.00 $16.03 $0.00 $0.00 $0.00 $0.00
OPERATOR: ROLLER $16.00 $0.00 $16.00 Above median $0.00 $0.00 $0.00 $0.00
PAINTER: BRUSH, ROLLER, AND SPRAY $16.75 $4.51 $21.26 Above median +0% vs market $0.00 $0.00 $0.00 $0.00
PIPEFITTER $42.09 $12.96 $55.05 +96% vs market $0.00 $0.00 $0.00 $0.00
PLUMBER $35.96 $11.68 $47.64 Above median +69% vs market $0.00 $0.00 $0.00 $0.00
POWER EQUIPMENT OPERATOR $39.47 $10.39 $49.86 Above median +109% vs market $0.00 $0.00 $0.00 $0.00
ROOFER $15.40 $0.00 $15.40 -30% vs market $0.00 $0.00 $0.00 $0.00
SHEET METAL WORKER $28.69 $14.13 $42.82 +60% vs market $0.00 $0.00 $0.00 $0.00
SHEET METAL WORKER $26.89 $10.38 $37.27 +39% vs market $0.00 $0.00 $0.00 $0.00
TILE FINISHER $12.00 $0.00 $12.00 Bottom 10% -43% vs market $0.00 $0.00 $0.00 $0.00
TILE SETTER $16.17 $0.00 $16.17 -23% vs market $0.00 $0.00 $0.00 $0.00
TRUCK DRIVER: DUMP TRUCK $12.39 $1.18 $13.57 -47% vs market $0.00 $0.00 $0.00 $0.00
TRUCK DRIVER: FLATBED TRUCK $19.65 $8.57 $28.22 Top 10% +11% vs market $0.00 $0.00 $0.00 $0.00
TRUCK DRIVER: SEMI-TRAILER TRUCK $12.50 $0.00 $12.50 Above median -51% vs market $0.00 $0.00 $0.00 $0.00
TRUCK DRIVER: WATER TRUCK $12.00 $4.11 $16.11 -37% vs market $0.00 $0.00 $0.00 $0.00

Crew Labor Cost Estimator

Estimate total federal-contract labor cost using the Hardin, TX — Building construction prevailing wage rates. Add a row for each trade in your crew, set the number of workers and hours, and optionally add a burden percentage for payroll taxes, workers’ comp, and insurance.

Trade Workers Hours/worker Rate $/hr Subtotal
|
Direct labor subtotal
$0.00
Loaded cost (with burden)
$0.00

This is an estimate only. Burden percentages vary widely by state, employer experience modifier, and benefit plan structure. Davis-Bacon also requires per-trade record-keeping on Form WH-347; this calculator does not replace certified payroll reporting.

Other Construction Types in Hardin

Compliance Notes

Full Davis-Bacon compliance guide →

View full revision history for TX20260252-14815-bld →