Building Construction — Grimes, Texas

WD TX20260148-14884-bld · Revision 1 · Effective May 17, 2026

Revision history →
Quick Answer

The Davis-Bacon prevailing wage for BRICKLAYER in Grimes, Texas (construction type: building) is $18.00/hr base + $0.00/hr fringe = $18.00/hr total package (WD TX20260148-14884-bld, Rev. 1).

Scroll down for all 19 trade classifications covered by this determination.

WD Number: TX20260148-14884-bld
Revision: 1
Construction Type: building
State: Texas (TX)
County: Grimes
Effective: May 17, 2026
Trades covered: 19
Official source: SAM.gov reference TX20260148View on SAM.gov →

Prevailing Wage Rates — All Trades

Base hourly rates and fringe benefit requirements for all trade classifications covered by this wage determination. Total package = base + fringe.

Trade Classification Base $/hr Fringe $/hr Total Package H&W Pension Vacation Training
BRICKLAYER $18.00 $0.00 $18.00 -27% vs market $0.00 $0.00 $0.00 $0.00
CARPENTER, INCLUDES ACOUSTICAL CEILING INSTALLATION, BATT INSULATION, AND METAL STUD INSTALLATION $15.13 $2.63 $17.76 Top 10% -23% vs market $0.00 $0.00 $0.00 $0.00
CEMENT MASON/CONCRETE FINISHER $12.09 $0.00 $12.09 -46% vs market $0.00 $0.00 $0.00 $0.00
DRYWALL HANGER $13.89 $1.00 $14.89 Above median -38% vs market $0.00 $0.00 $0.00 $0.00
ELECTRICIAN $18.06 $4.87 $22.93 -16% vs market $0.00 $0.00 $0.00 $0.00
LABORER: COMMON OR GENERAL $9.24 $0.00 $9.24 -50% vs market $0.00 $0.00 $0.00 $0.00
LABORER: LANDSCAPE & IRRIGATION $8.50 $0.22 $8.72 Above median -53% vs market $0.00 $0.00 $0.00 $0.00
LABORER: MASON TENDER - BRICK $12.02 $0.00 $12.02 -35% vs market $0.00 $0.00 $0.00 $0.00
LABORER: MORTAR MIXER $12.00 $0.00 $12.00 Top 10% -35% vs market $0.00 $0.00 $0.00 $0.00
OPERATOR: BACKHOE/EXCAVATOR/TRACKHOE $14.67 $0.47 $15.14 $0.00 $0.00 $0.00 $0.00
OPERATOR: BULLDOZER $13.00 $0.35 $13.35 $0.00 $0.00 $0.00 $0.00
OPERATOR: CRANE $21.33 $0.00 $21.33 $0.00 $0.00 $0.00 $0.00
OPERATOR: FORKLIFT $14.58 $0.00 $14.58 Bottom 10% $0.00 $0.00 $0.00 $0.00
OPERATOR: LOADER $10.54 $0.00 $10.54 Bottom 10% $0.00 $0.00 $0.00 $0.00
PAINTER: BRUSH, ROLLER AND SPRAY $11.75 $0.00 $11.75 -45% vs market $0.00 $0.00 $0.00 $0.00
ROOFER $13.64 $1.80 $15.44 -29% vs market $0.00 $0.00 $0.00 $0.00
SHEET METAL WORKER $17.00 $0.00 $17.00 Bottom 10% -37% vs market $0.00 $0.00 $0.00 $0.00
TILE SETTER $15.00 $0.00 $15.00 -28% vs market $0.00 $0.00 $0.00 $0.00
TRUCK DRIVER $10.68 $0.34 $11.02 -57% vs market $0.00 $0.00 $0.00 $0.00

Crew Labor Cost Estimator

Estimate total federal-contract labor cost using the Grimes, TX — Building construction prevailing wage rates. Add a row for each trade in your crew, set the number of workers and hours, and optionally add a burden percentage for payroll taxes, workers’ comp, and insurance.

Trade Workers Hours/worker Rate $/hr Subtotal
|
Direct labor subtotal
$0.00
Loaded cost (with burden)
$0.00

This is an estimate only. Burden percentages vary widely by state, employer experience modifier, and benefit plan structure. Davis-Bacon also requires per-trade record-keeping on Form WH-347; this calculator does not replace certified payroll reporting.

Other Construction Types in Grimes

Compliance Notes

Full Davis-Bacon compliance guide →

View full revision history for TX20260148-14884-bld →