Heavy Construction — Galveston, Texas

WD TX20260062-14883-hvy · Revision 1 · Effective May 17, 2026

Revision history →
Quick Answer

The Davis-Bacon prevailing wage for CARPENTER (HEAVY INCLUDING WATER AND SEWER LINES) in Galveston, Texas (construction type: heavy) is $14.38/hr base + $0.00/hr fringe = $14.38/hr total package (WD TX20260062-14883-hvy, Rev. 1).

Scroll down for all 19 trade classifications covered by this determination.

WD Number: TX20260062-14883-hvy
Revision: 1
Construction Type: heavy
State: Texas (TX)
County: Galveston
Effective: May 17, 2026
Trades covered: 19
Official source: SAM.gov reference TX20260062View on SAM.gov →

Prevailing Wage Rates — All Trades

Base hourly rates and fringe benefit requirements for all trade classifications covered by this wage determination. Total package = base + fringe.

Trade Classification Base $/hr Fringe $/hr Total Package H&W Pension Vacation Training
CARPENTER (HEAVY INCLUDING WATER AND SEWER LINES) $14.38 $0.00 $14.38 -38% vs market $0.00 $0.00 $0.00 $0.00
CEMENT MASON/CONCRETE FINISHER (HEAVY INCLUDING WATER AND SEWER LINES) $11.37 $1.13 $12.50 -44% vs market $0.00 $0.00 $0.00 $0.00
ELECTRICIAN (HEAVY INCLUDING WATER AND SEWER LINES) $18.40 $1.34 $19.74 -28% vs market $0.00 $0.00 $0.00 $0.00
FORM BUILDER/FORM SETTER (HEAVY INCLUDING WATER AND SEWER LINES) $13.35 $1.17 $14.52 $0.00 $0.00 $0.00 $0.00
IRONWORKER, REINFORCING (HEAVY INCLUDING WATER AND SEWER LINES) $11.29 $0.00 $11.29 -52% vs market $0.00 $0.00 $0.00 $0.00
LABORERS: COMMON $10.70 $0.00 $10.70 Top 10% -42% vs market $0.00 $0.00 $0.00 $0.00
LABORERS: LANDSCAPE $7.35 $0.00 $7.35 Bottom 10% -60% vs market $0.00 $0.00 $0.00 $0.00
LABORERS: MASON TENDER CEMENT $9.96 $0.00 $9.96 Bottom 10% -46% vs market $0.00 $0.00 $0.00 $0.00
LABORERS: PIPELAYER $10.07 $0.00 $10.07 Above median -45% vs market $0.00 $0.00 $0.00 $0.00
PIPEFITTER (HEAVY INCLUDING WATER AND SEWER LINES) $17.00 $0.04 $17.04 -39% vs market $0.00 $0.00 $0.00 $0.00
POWER EQUIPMENT OPERATORS: BACKHOE $13.25 $0.00 $13.25 Above median -44% vs market $0.00 $0.00 $0.00 $0.00
POWER EQUIPMENT OPERATORS: BULLDOZER $14.00 $0.00 $14.00 Above median -41% vs market $0.00 $0.00 $0.00 $0.00
POWER EQUIPMENT OPERATORS: CRANE $14.91 $0.58 $15.49 Above median -35% vs market $0.00 $0.00 $0.00 $0.00
POWER EQUIPMENT OPERATORS: EXCAVATOR $16.74 $0.00 $16.74 -30% vs market $0.00 $0.00 $0.00 $0.00
POWER EQUIPMENT OPERATORS: FRONT END LOADER $11.75 $0.92 $12.67 Above median -47% vs market $0.00 $0.00 $0.00 $0.00
POWER EQUIPMENT OPERATORS: GRADER $12.20 $1.48 $13.68 Above median -43% vs market $0.00 $0.00 $0.00 $0.00
POWER EQUIPMENT OPERATORS: TRACTOR $12.38 $1.51 $13.89 Top 10% -42% vs market $0.00 $0.00 $0.00 $0.00
SPRINKLER FITTER $36.15 $24.47 $60.62 +115% vs market $0.00 $0.00 $0.00 $0.00
TRUCK DRIVER (HEAVY INCLUDING WATER AND SEWER LINES) $12.28 $0.98 $13.26 -48% vs market $0.00 $0.00 $0.00 $0.00

Crew Labor Cost Estimator

Estimate total federal-contract labor cost using the Galveston, TX — Heavy construction prevailing wage rates. Add a row for each trade in your crew, set the number of workers and hours, and optionally add a burden percentage for payroll taxes, workers’ comp, and insurance.

Trade Workers Hours/worker Rate $/hr Subtotal
|
Direct labor subtotal
$0.00
Loaded cost (with burden)
$0.00

This is an estimate only. Burden percentages vary widely by state, employer experience modifier, and benefit plan structure. Davis-Bacon also requires per-trade record-keeping on Form WH-347; this calculator does not replace certified payroll reporting.

Other Construction Types in Galveston

Compliance Notes

Full Davis-Bacon compliance guide →

View full revision history for TX20260062-14883-hvy →