Residential Construction — Crosby, Texas

WD TX20260227-14927-res · Revision 1 · Effective May 17, 2026

Revision history →
Quick Answer

The Davis-Bacon prevailing wage for CARPENTER in Crosby, Texas (construction type: residential) is $11.76/hr base + $0.00/hr fringe = $11.76/hr total package (WD TX20260227-14927-res, Rev. 1).

Scroll down for all 7 trade classifications covered by this determination.

WD Number: TX20260227-14927-res
Revision: 1
Construction Type: residential
State: Texas (TX)
County: Crosby
Effective: May 17, 2026
Trades covered: 7
Official source: SAM.gov reference TX20260227View on SAM.gov →

Prevailing Wage Rates — All Trades

Base hourly rates and fringe benefit requirements for all trade classifications covered by this wage determination. Total package = base + fringe.

Trade Classification Base $/hr Fringe $/hr Total Package H&W Pension Vacation Training
CARPENTER $11.76 $0.00 $11.76 Bottom 10% -49% vs market $0.00 $0.00 $0.00 $0.00
ELECTRICIAN $26.07 $12.63 $38.70 +41% vs market $0.00 $0.00 $0.00 $0.00
LABORER: COMMON OR GENERAL $7.58 $0.00 $7.58 Bottom 10% -59% vs market $0.00 $0.00 $0.00 $0.00
PAINTER: BRUSH AND ROLLER $9.13 $0.00 $9.13 Bottom 10% -57% vs market $0.00 $0.00 $0.00 $0.00
PLUMBER $15.50 $2.00 $17.50 -38% vs market $0.00 $0.00 $0.00 $0.00
ROOFER $9.35 $0.00 $9.35 Bottom 10% -57% vs market $0.00 $0.00 $0.00 $0.00
SHEET METAL WORKER $10.88 $0.00 $10.88 Bottom 10% -59% vs market $0.00 $0.00 $0.00 $0.00

Crew Labor Cost Estimator

Estimate total federal-contract labor cost using the Crosby, TX — Residential construction prevailing wage rates. Add a row for each trade in your crew, set the number of workers and hours, and optionally add a burden percentage for payroll taxes, workers’ comp, and insurance.

Trade Workers Hours/worker Rate $/hr Subtotal
|
Direct labor subtotal
$0.00
Loaded cost (with burden)
$0.00

This is an estimate only. Burden percentages vary widely by state, employer experience modifier, and benefit plan structure. Davis-Bacon also requires per-trade record-keeping on Form WH-347; this calculator does not replace certified payroll reporting.

Other Construction Types in Crosby

Compliance Notes

Full Davis-Bacon compliance guide →

View full revision history for TX20260227-14927-res →