Heavy Construction — Clay, Texas

WD TX20260044-16852-hvy · Revision 1 · Effective May 17, 2026

Revision history →
Quick Answer

The Davis-Bacon prevailing wage for AIR TOOL OPERATOR in Clay, Texas (construction type: heavy) is $9.05/hr base + $0.00/hr fringe = $9.05/hr total package (WD TX20260044-16852-hvy, Rev. 1).

Scroll down for all 47 trade classifications covered by this determination.

WD Number: TX20260044-16852-hvy
Revision: 1
Construction Type: heavy
State: Texas (TX)
County: Clay
Effective: May 17, 2026
Trades covered: 47
Official source: SAM.gov reference TX20260044View on SAM.gov →

Prevailing Wage Rates — All Trades

Base hourly rates and fringe benefit requirements for all trade classifications covered by this wage determination. Total package = base + fringe.

Trade Classification Base $/hr Fringe $/hr Total Package H&W Pension Vacation Training
AIR TOOL OPERATOR $9.05 $0.00 $9.05 $0.00 $0.00 $0.00 $0.00
ASPHALT DISTRIBUTOR OPERATOR $10.46 $0.00 $10.46 Bottom 10% $0.00 $0.00 $0.00 $0.00
ASPHALT PAVING MACHINE OPERATOR $9.38 $0.00 $9.38 Bottom 10% $0.00 $0.00 $0.00 $0.00
ASPHALT RAKER $9.53 $0.00 $9.53 Bottom 10% $0.00 $0.00 $0.00 $0.00
ASPHALT SHOVELER $7.33 $0.00 $7.33 Bottom 10% $0.00 $0.00 $0.00 $0.00
BATCHING PLANT WEIGHER $11.15 $0.00 $11.15 Bottom 10% $0.00 $0.00 $0.00 $0.00
BROOM OR SWEEPER OPERATOR $8.01 $0.00 $8.01 Bottom 10% $0.00 $0.00 $0.00 $0.00
BULLDOZER OPERATOR $10.88 $0.00 $10.88 Bottom 10% $0.00 $0.00 $0.00 $0.00
CARPENTER $10.10 $0.00 $10.10 Bottom 10% -56% vs market $0.00 $0.00 $0.00 $0.00
CONCRETE FINISHER, PAVING $11.25 $0.00 $11.25 Bottom 10% -50% vs market $0.00 $0.00 $0.00 $0.00
CONCRETE FINISHER, STRUCTURES $10.03 $0.00 $10.03 Bottom 10% -55% vs market $0.00 $0.00 $0.00 $0.00
CONCRETE PAVING SAW OPERATOR $15.00 $0.00 $15.00 Top 10% $0.00 $0.00 $0.00 $0.00
CRANE, CLAMSHELL, BACKHOE, DERRICK, DRAGLINE, SHOVEL OPERATOR $10.94 $0.00 $10.94 Bottom 10% $0.00 $0.00 $0.00 $0.00
CRUSHER OR SCREEN PLANT OPERATOR $9.00 $0.00 $9.00 $0.00 $0.00 $0.00 $0.00
ELECTRICIAN $19.00 $0.00 $19.00 -31% vs market $0.00 $0.00 $0.00 $0.00
FLAGGER $7.29 $0.00 $7.29 Bottom 10% $0.00 $0.00 $0.00 $0.00
FORM BUILDER/SETTER, STRUCTURES $10.01 $0.00 $10.01 Bottom 10% $0.00 $0.00 $0.00 $0.00
FORM SETTER, PAVING & CURB $9.43 $0.00 $9.43 Bottom 10% $0.00 $0.00 $0.00 $0.00
FOUNDATION DRILL OPERATOR, TRUCK MOUNTED $18.00 $0.00 $18.00 Bottom 10% $0.00 $0.00 $0.00 $0.00
FRONT END LOADER OPERATOR $10.04 $0.00 $10.04 Bottom 10% $0.00 $0.00 $0.00 $0.00
LABORER, COMMON $8.25 $0.00 $8.25 Bottom 10% -55% vs market $0.00 $0.00 $0.00 $0.00
LABORER, UTILITY $9.62 $0.00 $9.62 Bottom 10% -48% vs market $0.00 $0.00 $0.00 $0.00
MECHANIC $14.05 $0.00 $14.05 Bottom 10% $0.00 $0.00 $0.00 $0.00
MILLING MACHINE OPERATOR, FINE GRADE $12.20 $0.00 $12.20 $0.00 $0.00 $0.00 $0.00
MOTOR GRADER OPERATOR, FINE GRADE $13.24 $0.00 $13.24 Bottom 10% $0.00 $0.00 $0.00 $0.00
MOTOR GRADER OPERATOR, ROUGH $14.36 $0.00 $14.36 Bottom 10% $0.00 $0.00 $0.00 $0.00
OILER $10.67 $0.00 $10.67 Bottom 10% $0.00 $0.00 $0.00 $0.00
PAINTER, STRUCTURES $11.00 $0.00 $11.00 Bottom 10% -48% vs market $0.00 $0.00 $0.00 $0.00
PAVEMENT MARKING MACHINE OPERATOR $9.26 $0.00 $9.26 Bottom 10% $0.00 $0.00 $0.00 $0.00
PLANER OPERATOR $17.50 $0.00 $17.50 $0.00 $0.00 $0.00 $0.00
REINFORCING STEEL SETTER, PAVING $9.50 $0.00 $9.50 $0.00 $0.00 $0.00 $0.00
REINFORCING STEEL SETTER, STRUCTURE $11.85 $0.00 $11.85 $0.00 $0.00 $0.00 $0.00
ROLLER OPERATOR, PNEUMATIC, SELF-PROPELLED $7.55 $0.00 $7.55 Bottom 10% $0.00 $0.00 $0.00 $0.00
ROLLER OPERATOR, STEEL WHEEL, FLAT WHEEL/TAMPING $8.66 $0.00 $8.66 Bottom 10% $0.00 $0.00 $0.00 $0.00
ROLLER OPERATOR, STEEL WHEEL, PLANT MIX PAVEMENT $9.81 $0.00 $9.81 Above median $0.00 $0.00 $0.00 $0.00
SCRAPER OPERATOR $7.78 $0.00 $7.78 Bottom 10% $0.00 $0.00 $0.00 $0.00
SERVICER $8.22 $0.00 $8.22 Bottom 10% $0.00 $0.00 $0.00 $0.00
SPREADER BOX OPERATOR $10.07 $0.00 $10.07 Bottom 10% $0.00 $0.00 $0.00 $0.00
TRACTOR OPERATOR, PNEUMATIC $8.58 $0.00 $8.58 Bottom 10% $0.00 $0.00 $0.00 $0.00
TRAVELING MIXER OPERATOR $9.71 $0.00 $9.71 Bottom 10% $0.00 $0.00 $0.00 $0.00
TRUCK DRIVER, LOWBOY-FLOAT $11.42 $0.00 $11.42 -55% vs market $0.00 $0.00 $0.00 $0.00
TRUCK DRIVER, SINGLE AXLE, HEAVY $11.00 $0.00 $11.00 Above median -57% vs market $0.00 $0.00 $0.00 $0.00
TRUCK DRIVER, SINGLE AXLE, LIGHT $7.55 $0.00 $7.55 Bottom 10% -70% vs market $0.00 $0.00 $0.00 $0.00
TRUCK DRIVER, TANDEM AXLE, SEMI-TRAILER $9.02 $0.00 $9.02 Bottom 10% -65% vs market $0.00 $0.00 $0.00 $0.00
WAGON DRILL, BORING MACHINE, POST HOLE DRILLER OPERATOR $8.86 $0.00 $8.86 $0.00 $0.00 $0.00 $0.00
WELDER $9.75 $0.00 $9.75 Bottom 10% -59% vs market $0.00 $0.00 $0.00 $0.00
WORK ZONE BARRICADE SERVICER $8.64 $0.00 $8.64 Bottom 10% $0.00 $0.00 $0.00 $0.00

Crew Labor Cost Estimator

Estimate total federal-contract labor cost using the Clay, TX — Heavy construction prevailing wage rates. Add a row for each trade in your crew, set the number of workers and hours, and optionally add a burden percentage for payroll taxes, workers’ comp, and insurance.

Trade Workers Hours/worker Rate $/hr Subtotal
|
Direct labor subtotal
$0.00
Loaded cost (with burden)
$0.00

This is an estimate only. Burden percentages vary widely by state, employer experience modifier, and benefit plan structure. Davis-Bacon also requires per-trade record-keeping on Form WH-347; this calculator does not replace certified payroll reporting.

Other Construction Types in Clay

Compliance Notes

Full Davis-Bacon compliance guide →

View full revision history for TX20260044-16852-hvy →