Highway Construction — Calhoun, Texas

WD TX20260296-14828-hwy · Revision 1 · Effective May 17, 2026

Revision history →
Quick Answer

The Davis-Bacon prevailing wage for ASPHALT DISTRIBUTOR OPERATOR in Calhoun, Texas (construction type: highway) is $23.20/hr base + $0.00/hr fringe = $23.20/hr total package (WD TX20260296-14828-hwy, Rev. 1).

Scroll down for all 34 trade classifications covered by this determination.

WD Number: TX20260296-14828-hwy
Revision: 1
Construction Type: highway
State: Texas (TX)
County: Calhoun
Effective: May 17, 2026
Trades covered: 34
Official source: SAM.gov reference TX20260296View on SAM.gov →

Prevailing Wage Rates — All Trades

Base hourly rates and fringe benefit requirements for all trade classifications covered by this wage determination. Total package = base + fringe.

Trade Classification Base $/hr Fringe $/hr Total Package H&W Pension Vacation Training
ASPHALT DISTRIBUTOR OPERATOR $23.20 $0.00 $23.20 $0.00 $0.00 $0.00 $0.00
ASPHALT PAVING MACHINE OPERATOR $19.14 $0.00 $19.14 $0.00 $0.00 $0.00 $0.00
ASPHALT RAKER $17.40 $0.00 $17.40 $0.00 $0.00 $0.00 $0.00
BROOM OR SWEEPER OPERATOR $16.63 $0.00 $16.63 Bottom 10% $0.00 $0.00 $0.00 $0.00
CONCRETE FINISHER, PAVING AND STRUCTURES $21.16 $0.00 $21.16 Top 10% -6% vs market $0.00 $0.00 $0.00 $0.00
CRANE OPERATOR, HYDRAULIC 80 TONS OR LESS $27.88 $0.00 $27.88 Above median $0.00 $0.00 $0.00 $0.00
CRANE OPERATOR, HYDRAULIC OVER 80 TONS $30.25 $0.00 $30.25 Bottom 10% $0.00 $0.00 $0.00 $0.00
CRANE OPERATOR, LATTICE BOOM OVER 80 TONS $34.20 $0.00 $34.20 Top 10% $0.00 $0.00 $0.00 $0.00
CRAWLER TRACTOR OPERATOR $23.23 $0.00 $23.23 Top 10% $0.00 $0.00 $0.00 $0.00
EXCAVATOR OPERATOR, 50,000 POUNDS OR LESS $19.69 $0.00 $19.69 Bottom 10% $0.00 $0.00 $0.00 $0.00
EXCAVATOR OPERATOR, OVER 50,000 POUNDS $22.05 $0.00 $22.05 Bottom 10% $0.00 $0.00 $0.00 $0.00
FLAGGER $14.59 $0.00 $14.59 $0.00 $0.00 $0.00 $0.00
FORM BUILDER/SETTER, STRUCTURES $19.82 $0.00 $19.82 $0.00 $0.00 $0.00 $0.00
FORM SETTER, PAVING & CURB $18.16 $0.00 $18.16 $0.00 $0.00 $0.00 $0.00
FRONT END LOADER OPERATOR, 3 CY OR LESS $18.80 $0.00 $18.80 $0.00 $0.00 $0.00 $0.00
FRONT END LOADER OPERATOR, OVER 3 CY $18.71 $0.00 $18.71 Bottom 10% $0.00 $0.00 $0.00 $0.00
LABORER, COMMON $16.63 $0.00 $16.63 Above median -9% vs market $0.00 $0.00 $0.00 $0.00
LABORER, UTILITY $18.42 $0.00 $18.42 Above median +0% vs market $0.00 $0.00 $0.00 $0.00
LOADER/BACKHOE OPERATOR $19.01 $0.00 $19.01 $0.00 $0.00 $0.00 $0.00
MECHANIC $25.51 $0.00 $25.51 Above median $0.00 $0.00 $0.00 $0.00
MILLING MACHINE OPERATOR $22.53 $0.00 $22.53 Top 10% $0.00 $0.00 $0.00 $0.00
MOTOR GRADER OPERATOR, FINE GRADE $26.88 $0.00 $26.88 Above median $0.00 $0.00 $0.00 $0.00
MOTOR GRADER OPERATOR, ROUGH $23.06 $0.00 $23.06 Above median $0.00 $0.00 $0.00 $0.00
PAINTER, STRUCTURES $27.93 $0.00 $27.93 Top 10% +32% vs market $0.00 $0.00 $0.00 $0.00
PIPELAYER $19.40 $0.00 $19.40 $0.00 $0.00 $0.00 $0.00
RECLAIMER/PULVERIZER OPERATOR $18.83 $0.00 $18.83 $0.00 $0.00 $0.00 $0.00
REINFORCING STEEL WORKER $22.76 $0.00 $22.76 $0.00 $0.00 $0.00 $0.00
ROLLER OPERATOR, ASPHALT $17.27 $0.00 $17.27 $0.00 $0.00 $0.00 $0.00
ROLLER OPERATOR, OTHER $16.90 $0.00 $16.90 Bottom 10% $0.00 $0.00 $0.00 $0.00
SPREADER BOX OPERATOR $20.63 $0.00 $20.63 Above median $0.00 $0.00 $0.00 $0.00
TRUCK DRIVER LOWBOY FLOAT $22.90 $0.00 $22.90 Bottom 10% -10% vs market $0.00 $0.00 $0.00 $0.00
TRUCK DRIVER, SINGLE AXLE $17.99 $0.00 $17.99 Bottom 10% -29% vs market $0.00 $0.00 $0.00 $0.00
TRUCK DRIVER, TANDEM AXLE TRACTOR WITH SEMI TRAILER.$ 22.08 0.00 TRUCK DRIVER, SINGLE OR TANDEM AXLE DUMP TRUCK $20.30 $0.00 $20.30 -20% vs market $0.00 $0.00 $0.00 $0.00
WORK ZONE BARRICADE SERVICER $17.52 $0.00 $17.52 $0.00 $0.00 $0.00 $0.00

Crew Labor Cost Estimator

Estimate total federal-contract labor cost using the Calhoun, TX — Highway construction prevailing wage rates. Add a row for each trade in your crew, set the number of workers and hours, and optionally add a burden percentage for payroll taxes, workers’ comp, and insurance.

Trade Workers Hours/worker Rate $/hr Subtotal
|
Direct labor subtotal
$0.00
Loaded cost (with burden)
$0.00

This is an estimate only. Burden percentages vary widely by state, employer experience modifier, and benefit plan structure. Davis-Bacon also requires per-trade record-keeping on Form WH-347; this calculator does not replace certified payroll reporting.