Heavy Construction — Bexar, Texas
WD TX20260007-15020-hvy · Revision 1 · Effective May 17, 2026
The Davis-Bacon prevailing wage for CEMENT MASON/CONCRETE FINISHER in Bexar, Texas (construction type: heavy) is $12.56/hr base + $0.00/hr fringe = $12.56/hr total package (WD TX20260007-15020-hvy, Rev. 1).
Scroll down for all 47 trade classifications covered by this determination.
Prevailing Wage Rates — All Trades
Base hourly rates and fringe benefit requirements for all trade classifications covered by this wage determination. Total package = base + fringe.
| Trade Classification | Base $/hr | Fringe $/hr | Total Package | H&W | Pension | Vacation | Training |
|---|---|---|---|---|---|---|---|
| CEMENT MASON/CONCRETE FINISHER | $12.56 | $0.00 | $12.56 -44% vs market | $0.00 | $0.00 | $0.00 | $0.00 |
| ELECTRICIAN | $26.35 | $0.00 | $26.35 -4% vs market | $0.00 | $0.00 | $0.00 | $0.00 |
| FORM BUILDER/FORM SETTER | $12.87 | $0.00 | $12.87 | $0.00 | $0.00 | $0.00 | $0.00 |
| FORM BUILDER/FORM SETTER | $12.94 | $0.00 | $12.94 Above median | $0.00 | $0.00 | $0.00 | $0.00 |
| LABORER | $11.85 | $0.00 | $11.85 -35% vs market | $0.00 | $0.00 | $0.00 | $0.00 |
| LABORER | $12.27 | $0.00 | $12.27 -33% vs market | $0.00 | $0.00 | $0.00 | $0.00 |
| LABORER | $10.50 | $0.00 | $10.50 -43% vs market | $0.00 | $0.00 | $0.00 | $0.00 |
| LABORER | $9.45 | $0.00 | $9.45 -49% vs market | $0.00 | $0.00 | $0.00 | $0.00 |
| LABORER: ASPHALT RAKER | $12.12 | $0.00 | $12.12 -34% vs market | $0.00 | $0.00 | $0.00 | $0.00 |
| LABORER: PIPELAYER | $12.79 | $0.00 | $12.79 -30% vs market | $0.00 | $0.00 | $0.00 | $0.00 |
| PAINTER | $18.34 | $0.00 | $18.34 -14% vs market | $0.00 | $0.00 | $0.00 | $0.00 |
| POWER EQUIPMENT OPERATOR | $18.48 | $0.00 | $18.48 -23% vs market | $0.00 | $0.00 | $0.00 | $0.00 |
| POWER EQUIPMENT OPERATOR | $14.04 | $0.00 | $14.04 -41% vs market | $0.00 | $0.00 | $0.00 | $0.00 |
| POWER EQUIPMENT OPERATOR | $10.50 | $0.00 | $10.50 Bottom 10% -56% vs market | $0.00 | $0.00 | $0.00 | $0.00 |
| POWER EQUIPMENT OPERATOR | $12.78 | $0.00 | $12.78 -46% vs market | $0.00 | $0.00 | $0.00 | $0.00 |
| POWER EQUIPMENT OPERATOR | $12.88 | $0.00 | $12.88 -46% vs market | $0.00 | $0.00 | $0.00 | $0.00 |
| POWER EQUIPMENT OPERATOR | $19.17 | $0.00 | $19.17 -20% vs market | $0.00 | $0.00 | $0.00 | $0.00 |
| POWER EQUIPMENT OPERATOR | $14.18 | $0.00 | $14.18 -41% vs market | $0.00 | $0.00 | $0.00 | $0.00 |
| POWER EQUIPMENT OPERATOR | $14.12 | $0.00 | $14.12 -41% vs market | $0.00 | $0.00 | $0.00 | $0.00 |
| POWER EQUIPMENT OPERATOR | $13.21 | $0.00 | $13.21 -45% vs market | $0.00 | $0.00 | $0.00 | $0.00 |
| POWER EQUIPMENT OPERATOR | $17.71 | $0.00 | $17.71 -26% vs market | $0.00 | $0.00 | $0.00 | $0.00 |
| POWER EQUIPMENT OPERATOR | $17.24 | $0.00 | $17.24 -28% vs market | $0.00 | $0.00 | $0.00 | $0.00 |
| POWER EQUIPMENT OPERATOR | $11.67 | $0.00 | $11.67 Bottom 10% -51% vs market | $0.00 | $0.00 | $0.00 | $0.00 |
| POWER EQUIPMENT OPERATOR | $19.38 | $0.00 | $19.38 -19% vs market | $0.00 | $0.00 | $0.00 | $0.00 |
| POWER EQUIPMENT OPERATOR | $15.87 | $0.00 | $15.87 -34% vs market | $0.00 | $0.00 | $0.00 | $0.00 |
| POWER EQUIPMENT OPERATOR | $18.36 | $0.00 | $18.36 -23% vs market | $0.00 | $0.00 | $0.00 | $0.00 |
| POWER EQUIPMENT OPERATOR | $15.48 | $0.00 | $15.48 -35% vs market | $0.00 | $0.00 | $0.00 | $0.00 |
| POWER EQUIPMENT OPERATOR: ASPHALT DISTRIBUTOR | $15.55 | $0.00 | $15.55 Top 10% -35% vs market | $0.00 | $0.00 | $0.00 | $0.00 |
| POWER EQUIPMENT OPERATOR: BOOM TRUCK | $18.36 | $0.00 | $18.36 Top 10% -23% vs market | $0.00 | $0.00 | $0.00 | $0.00 |
| POWER EQUIPMENT OPERATOR: BROOM OR SWEEPER | $11.04 | $0.00 | $11.04 Top 10% -54% vs market | $0.00 | $0.00 | $0.00 | $0.00 |
| POWER EQUIPMENT OPERATOR: CRAWLER TRACTOR | $15.67 | $0.00 | $15.67 Above median -34% vs market | $0.00 | $0.00 | $0.00 | $0.00 |
| POWER EQUIPMENT OPERATOR: FOUNDATION DRILL, TRUCK MOUNTED | $16.93 | $0.00 | $16.93 Above median -29% vs market | $0.00 | $0.00 | $0.00 | $0.00 |
| POWER EQUIPMENT OPERATOR: FRONT END LOADER, 3 CY OR LESS | $13.04 | $0.00 | $13.04 Above median -45% vs market | $0.00 | $0.00 | $0.00 | $0.00 |
| POWER EQUIPMENT OPERATOR: MOTOR GRADER, FINE GRADE..$ 18.51 0.00 POWER EQUIPMENT OPERATOR: MECHANIC | $17.10 | $0.00 | $17.10 Top 10% -28% vs market | $0.00 | $0.00 | $0.00 | $0.00 |
| POWER EQUIPMENT OPERATOR: MOTOR GRADER, ROUGH | $14.63 | $0.00 | $14.63 Above median -39% vs market | $0.00 | $0.00 | $0.00 | $0.00 |
| POWER EQUIPMENT OPERATOR: SCRAPER | $12.27 | $0.00 | $12.27 -49% vs market | $0.00 | $0.00 | $0.00 | $0.00 |
| POWER EQUIPMENT OPERATOR:..$ 14.36 0.00 POWER EQUIPMENT OPERATOR | $12.69 | $0.00 | $12.69 Top 10% -47% vs market | $0.00 | $0.00 | $0.00 | $0.00 |
| SERVICER | $14.51 | $0.00 | $14.51 | $0.00 | $0.00 | $0.00 | $0.00 |
| STEEL WORKER | $19.29 | $0.00 | $19.29 Top 10% | $0.00 | $0.00 | $0.00 | $0.00 |
| STEEL WORKER | $14.00 | $0.00 | $14.00 Above median | $0.00 | $0.00 | $0.00 | $0.00 |
| TRAFFIC SIGNALIZATION: TRAFFIC SIGNAL INSTALLATION | $16.00 | $0.00 | $16.00 Bottom 10% | $0.00 | $0.00 | $0.00 | $0.00 |
| TRUCK DRIVER | $11.79 | $0.00 | $11.79 -54% vs market | $0.00 | $0.00 | $0.00 | $0.00 |
| TRUCK DRIVER | $11.88 | $0.00 | $11.88 -53% vs market | $0.00 | $0.00 | $0.00 | $0.00 |
| TRUCK DRIVER | $15.66 | $0.00 | $15.66 Above median -39% vs market | $0.00 | $0.00 | $0.00 | $0.00 |
| TRUCK DRIVER: SINGLE OR TANDEM AXLE DUMP TRUCK | $11.68 | $0.00 | $11.68 Top 10% -54% vs market | $0.00 | $0.00 | $0.00 | $0.00 |
| TRUCK DRIVER: TANDEM AXLE TRACTOR W/SEMI TRAILER | $12.81 | $0.00 | $12.81 Top 10% -50% vs market | $0.00 | $0.00 | $0.00 | $0.00 |
| WELDER | $15.97 | $0.00 | $15.97 -33% vs market | $0.00 | $0.00 | $0.00 | $0.00 |
Crew Labor Cost Estimator
Estimate total federal-contract labor cost using the Bexar, TX — Heavy construction prevailing wage rates. Add a row for each trade in your crew, set the number of workers and hours, and optionally add a burden percentage for payroll taxes, workers’ comp, and insurance.
| Trade | Workers | Hours/worker | Rate $/hr | Subtotal |
|---|
This is an estimate only. Burden percentages vary widely by state, employer experience modifier, and benefit plan structure. Davis-Bacon also requires per-trade record-keeping on Form WH-347; this calculator does not replace certified payroll reporting.
Other Construction Types in Bexar
Compliance Notes
- This wage determination applies to federal contracts for heavy construction in Bexar, Texas.
- The Davis-Bacon Act applies to contracts ≥$2,000 involving construction, alteration, or repair of federal or federally assisted buildings.
- The total package (base + fringe) is the minimum hourly labor cost per worker. Employers may satisfy fringe requirements by contributing to bona fide benefit plans.
- Apprentices must be registered with a DOL-approved apprenticeship program to be paid apprentice rates.
- Contractors must post this wage determination at the job site. Certified payroll records must be submitted weekly using Form WH-347.
- If a trade classification you need isn't listed below, request a conformance from the DOL Wage and Hour Division.