Building Construction — Bell, Texas

WD TX20260230-16828-bld · Revision 1 · Effective May 17, 2026

Revision history →
Quick Answer

The Davis-Bacon prevailing wage for BOILERMAKER in Bell, Texas (construction type: building) is $33.17/hr base + $24.92/hr fringe = $58.09/hr total package (WD TX20260230-16828-bld, Rev. 1).

Scroll down for all 42 trade classifications covered by this determination.

WD Number: TX20260230-16828-bld
Revision: 1
Construction Type: building
State: Texas (TX)
County: Bell
Effective: May 17, 2026
Trades covered: 42
Official source: SAM.gov reference TX20260230View on SAM.gov →

Prevailing Wage Rates — All Trades

Base hourly rates and fringe benefit requirements for all trade classifications covered by this wage determination. Total package = base + fringe.

Trade Classification Base $/hr Fringe $/hr Total Package H&W Pension Vacation Training
BOILERMAKER $33.17 $24.92 $58.09 +88% vs market $0.00 $0.00 $0.00 $0.00
BRICKLAYER $19.09 $0.00 $19.09 -22% vs market $0.00 $0.00 $0.00 $0.00
CARPENTER, EXCLUDES DRYWALL HANGING, AND METAL STUD INSTALLATION $17.28 $1.71 $18.99 -18% vs market $0.00 $0.00 $0.00 $0.00
CEMENT MASON/CONCRETE FINISHER $14.00 $0.00 $14.00 -38% vs market $0.00 $0.00 $0.00 $0.00
DRYWALL HANGER AND METAL STUD INSTALLER $14.59 $0.00 $14.59 -39% vs market $0.00 $0.00 $0.00 $0.00
ELECTRICIAN $28.28 $2.44 $30.72 +12% vs market $0.00 $0.00 $0.00 $0.00
ELECTRICIAN, EXCLUDES LOW VOLTAGE WIRING $20.50 $2.71 $23.21 -15% vs market $0.00 $0.00 $0.00 $0.00
HVAC MECHANIC $16.01 $1.56 $17.57 Above median -32% vs market $0.00 $0.00 $0.00 $0.00
HVAC MECHANIC $15.50 $0.00 $15.50 Above median -40% vs market $0.00 $0.00 $0.00 $0.00
INSULATOR - MECHANICAL $19.77 $7.13 $26.90 Above median +17% vs market $0.00 $0.00 $0.00 $0.00
IRONWORKER, REINFORCING $13.35 $0.00 $13.35 Bottom 10% -44% vs market $0.00 $0.00 $0.00 $0.00
IRONWORKER, STRUCTURAL $18.35 $4.90 $23.25 -2% vs market $0.00 $0.00 $0.00 $0.00
IRONWORKER: ORNAMENTAL $28.26 $8.13 $36.39 Bottom 10% +53% vs market $0.00 $0.00 $0.00 $0.00
LABORER: COMMON OR GENERAL $10.53 $0.00 $10.53 -43% vs market $0.00 $0.00 $0.00 $0.00
LABORER: MASON TENDER - BRICK $9.98 $0.00 $9.98 Bottom 10% -46% vs market $0.00 $0.00 $0.00 $0.00
LABORER: MASON TENDER - CEMENT/CONCRETE $9.93 $0.00 $9.93 -46% vs market $0.00 $0.00 $0.00 $0.00
LABORER: PIPELAYER $12.49 $2.13 $14.62 -20% vs market $0.00 $0.00 $0.00 $0.00
LABORER: ROOF TEAROFF $11.28 $0.00 $11.28 Top 10% -39% vs market $0.00 $0.00 $0.00 $0.00
OPERATOR: BACKHOE/EXCAVATOR/TRACKHOE $13.10 $1.24 $14.34 $0.00 $0.00 $0.00 $0.00
OPERATOR: BOBCAT/SKID STEER/SKID LOADER $13.93 $0.00 $13.93 Bottom 10% $0.00 $0.00 $0.00 $0.00
OPERATOR: BULLDOZER $18.29 $1.31 $19.60 Above median $0.00 $0.00 $0.00 $0.00
OPERATOR: DRILL $16.22 $0.34 $16.56 $0.00 $0.00 $0.00 $0.00
OPERATOR: FORKLIFT $14.00 $0.00 $14.00 Bottom 10% $0.00 $0.00 $0.00 $0.00
OPERATOR: GRADER/BLADE $14.34 $1.68 $16.02 $0.00 $0.00 $0.00 $0.00
OPERATOR: LOADER $13.88 $0.44 $14.32 $0.00 $0.00 $0.00 $0.00
OPERATOR: MECHANIC $17.52 $3.33 $20.85 Above median $0.00 $0.00 $0.00 $0.00
OPERATOR: PAVER $16.03 $0.00 $16.03 $0.00 $0.00 $0.00 $0.00
OPERATOR: ROLLER $13.11 $0.00 $13.11 $0.00 $0.00 $0.00 $0.00
PAINTER: BRUSH, ROLLER, AND SPRAY $15.00 $0.81 $15.81 -26% vs market $0.00 $0.00 $0.00 $0.00
PIPEFITTER $37.15 $16.92 $54.07 +92% vs market $0.00 $0.00 $0.00 $0.00
PLUMBER, EXCLUDES HVAC PIPE INSTALLATION $21.18 $7.57 $28.75 +2% vs market $0.00 $0.00 $0.00 $0.00
POWER EQUIPMENT OPERATOR ( HYDRAULIC CRANES 59 TONS AND UNDER) $32.35 $13.10 $45.45 Top 10% +90% vs market $0.00 $0.00 $0.00 $0.00
POWER EQUIPMENT OPERATOR ( TOWER CRANE) $32.85 $13.10 $45.95 Top 10% +93% vs market $0.00 $0.00 $0.00 $0.00
ROOFER $13.75 $0.00 $13.75 -37% vs market $0.00 $0.00 $0.00 $0.00
SHEET METAL WORKER, EXCLUDES HVAC DUCT INSTALLATION.$ 14.89 1.55 SHEET METAL WORKER $18.71 $4.90 $23.61 -12% vs market $0.00 $0.00 $0.00 $0.00
SPRINKLER FITTER $15.46 $0.00 $15.46 Bottom 10% -45% vs market $0.00 $0.00 $0.00 $0.00
TILE FINISHER $11.22 $0.00 $11.22 Bottom 10% -46% vs market $0.00 $0.00 $0.00 $0.00
TILE SETTER $14.74 $0.00 $14.74 -30% vs market $0.00 $0.00 $0.00 $0.00
TRUCK DRIVER: DUMP TRUCK $11.50 $1.10 $12.60 -51% vs market $0.00 $0.00 $0.00 $0.00
TRUCK DRIVER: FLATBED TRUCK $19.65 $8.57 $28.22 Top 10% +11% vs market $0.00 $0.00 $0.00 $0.00
TRUCK DRIVER: SEMI-TRAILER TRUCK $12.50 $0.00 $12.50 Above median -51% vs market $0.00 $0.00 $0.00 $0.00
TRUCK DRIVER: WATER TRUCK $12.00 $4.11 $16.11 -37% vs market $0.00 $0.00 $0.00 $0.00

Crew Labor Cost Estimator

Estimate total federal-contract labor cost using the Bell, TX — Building construction prevailing wage rates. Add a row for each trade in your crew, set the number of workers and hours, and optionally add a burden percentage for payroll taxes, workers’ comp, and insurance.

Trade Workers Hours/worker Rate $/hr Subtotal
|
Direct labor subtotal
$0.00
Loaded cost (with burden)
$0.00

This is an estimate only. Burden percentages vary widely by state, employer experience modifier, and benefit plan structure. Davis-Bacon also requires per-trade record-keeping on Form WH-347; this calculator does not replace certified payroll reporting.

Other Construction Types in Bell

Compliance Notes

Full Davis-Bacon compliance guide →

View full revision history for TX20260230-16828-bld →