Heavy Construction — Austin, Texas

WD TX20260045-14878-hvy · Revision 1 · Effective May 17, 2026

Revision history →
Quick Answer

The Davis-Bacon prevailing wage for ASPHALT DISTRIBUTOR OPERATOR in Austin, Texas (construction type: heavy) is $12.57/hr base + $0.00/hr fringe = $12.57/hr total package (WD TX20260045-14878-hvy, Rev. 1).

Scroll down for all 35 trade classifications covered by this determination.

WD Number: TX20260045-14878-hvy
Revision: 1
Construction Type: heavy
State: Texas (TX)
County: Austin
Effective: May 17, 2026
Trades covered: 35
Official source: SAM.gov reference TX20260045View on SAM.gov →

Prevailing Wage Rates — All Trades

Base hourly rates and fringe benefit requirements for all trade classifications covered by this wage determination. Total package = base + fringe.

Trade Classification Base $/hr Fringe $/hr Total Package H&W Pension Vacation Training
ASPHALT DISTRIBUTOR OPERATOR $12.57 $0.00 $12.57 Bottom 10% $0.00 $0.00 $0.00 $0.00
ASPHALT PAVING MACHINE OPERATOR $11.60 $0.00 $11.60 Bottom 10% $0.00 $0.00 $0.00 $0.00
ASPHALT RAKER $10.63 $0.00 $10.63 Bottom 10% $0.00 $0.00 $0.00 $0.00
ASPHALT SHOVELER $9.23 $0.00 $9.23 Above median $0.00 $0.00 $0.00 $0.00
BROOM OR SWEEPER OPERATOR $9.32 $0.00 $9.32 Bottom 10% $0.00 $0.00 $0.00 $0.00
BULLDOZER OPERATOR $11.69 $0.00 $11.69 Above median $0.00 $0.00 $0.00 $0.00
CARPENTER $11.70 $0.00 $11.70 Bottom 10% -49% vs market $0.00 $0.00 $0.00 $0.00
CONCRETE FINISHER, PAVING $11.64 $0.00 $11.64 Above median -48% vs market $0.00 $0.00 $0.00 $0.00
CONCRETE FINISHER, STRUCTURES $10.23 $0.00 $10.23 Above median -54% vs market $0.00 $0.00 $0.00 $0.00
CONCRETE RUBBER $9.00 $0.00 $9.00 Bottom 10% $0.00 $0.00 $0.00 $0.00
CRANE, CLAMSHELL, BACKHOE, DERRICK, DRAGLINE, SHOVEL OPERATOR $12.00 $0.00 $12.00 Above median $0.00 $0.00 $0.00 $0.00
FLAGGER $8.60 $0.00 $8.60 Bottom 10% $0.00 $0.00 $0.00 $0.00
FORM BUILDER/SETTER, STRUCTURES $10.51 $0.00 $10.51 Bottom 10% $0.00 $0.00 $0.00 $0.00
FORM SETTER, PAVING & CURB $9.48 $0.00 $9.48 Bottom 10% $0.00 $0.00 $0.00 $0.00
FOUNDATION DRILL OPERATOR, TRUCK MOUNTED $14.58 $0.00 $14.58 Bottom 10% $0.00 $0.00 $0.00 $0.00
FRONT END LOADER OPERATOR $10.62 $0.00 $10.62 Above median $0.00 $0.00 $0.00 $0.00
LABORER, COMMON $8.91 $0.00 $8.91 -51% vs market $0.00 $0.00 $0.00 $0.00
LABORER, UTILITY $9.21 $0.00 $9.21 Bottom 10% -50% vs market $0.00 $0.00 $0.00 $0.00
MECHANIC $12.18 $0.00 $12.18 Bottom 10% $0.00 $0.00 $0.00 $0.00
MOTOR GRADER OPERATOR FINE GRADE $15.15 $0.00 $15.15 $0.00 $0.00 $0.00 $0.00
MOTOR GRADER OPERATOR ROUGH $12.95 $0.00 $12.95 $0.00 $0.00 $0.00 $0.00
PAVEMENT MARKING MACHINE OPERATOR $13.32 $0.00 $13.32 Bottom 10% $0.00 $0.00 $0.00 $0.00
PIPELAYER $9.71 $0.00 $9.71 Bottom 10% $0.00 $0.00 $0.00 $0.00
ROLLER OPERATOR, PNEUMATIC, SELF-PROPELLED $8.90 $0.00 $8.90 Top 10% $0.00 $0.00 $0.00 $0.00
ROLLER OPERATOR, STEEL WHEEL, FLAT WHEEL/TAMPING $9.30 $0.00 $9.30 Top 10% $0.00 $0.00 $0.00 $0.00
ROLLER OPERATOR, STEEL WHEEL, PLANT MIX PAVEMENT $10.59 $0.00 $10.59 Top 10% $0.00 $0.00 $0.00 $0.00
SCRAPER OPERATOR $9.85 $0.00 $9.85 Bottom 10% $0.00 $0.00 $0.00 $0.00
SERVICER $11.18 $0.00 $11.18 Bottom 10% $0.00 $0.00 $0.00 $0.00
SPREADER BOX OPERATOR $13.00 $0.00 $13.00 Bottom 10% $0.00 $0.00 $0.00 $0.00
TRAVELING MIXER OPERATOR $12.67 $0.00 $12.67 Top 10% $0.00 $0.00 $0.00 $0.00
TRUCK DRIVER SINGLE AXLE HEAVY $10.87 $0.00 $10.87 Bottom 10% -57% vs market $0.00 $0.00 $0.00 $0.00
TRUCK DRIVER SINGLE AXLE, LIGHT $10.85 $0.00 $10.85 Bottom 10% -57% vs market $0.00 $0.00 $0.00 $0.00
TRUCK DRIVER, LOWBOY-FLOAT $13.70 $0.00 $13.70 Top 10% -46% vs market $0.00 $0.00 $0.00 $0.00
TRUCK DRIVER, TANDEM AXLE, SEMI-TRAILER $10.05 $0.00 $10.05 Above median -61% vs market $0.00 $0.00 $0.00 $0.00
WORK ZONE BARRICADE SERVICER $9.63 $0.00 $9.63 Bottom 10% $0.00 $0.00 $0.00 $0.00

Crew Labor Cost Estimator

Estimate total federal-contract labor cost using the Austin, TX — Heavy construction prevailing wage rates. Add a row for each trade in your crew, set the number of workers and hours, and optionally add a burden percentage for payroll taxes, workers’ comp, and insurance.

Trade Workers Hours/worker Rate $/hr Subtotal
|
Direct labor subtotal
$0.00
Loaded cost (with burden)
$0.00

This is an estimate only. Burden percentages vary widely by state, employer experience modifier, and benefit plan structure. Davis-Bacon also requires per-trade record-keeping on Form WH-347; this calculator does not replace certified payroll reporting.