Heavy Construction — Sumner, Tennessee

WD TN20260137-14766-hvy · Revision 1 · Effective May 17, 2026

Revision history →
Quick Answer

The Davis-Bacon prevailing wage for ELECTRICIAN in Sumner, Tennessee (construction type: heavy) is $34.92/hr base + $14.75/hr fringe = $49.67/hr total package (WD TN20260137-14766-hvy, Rev. 1).

Scroll down for all 8 trade classifications covered by this determination.

WD Number: TN20260137-14766-hvy
Revision: 1
Construction Type: heavy
State: Tennessee (TN)
County: Sumner
Effective: May 17, 2026
Trades covered: 8
Official source: SAM.gov reference TN20260137View on SAM.gov →

Prevailing Wage Rates — All Trades

Base hourly rates and fringe benefit requirements for all trade classifications covered by this wage determination. Total package = base + fringe.

Trade Classification Base $/hr Fringe $/hr Total Package H&W Pension Vacation Training
ELECTRICIAN $34.92 $14.75 $49.67 +75% vs market $0.00 $0.00 $0.00 $0.00
LABORER: COMMON OR GENERAL $10.25 $0.00 $10.25 -52% vs market $0.00 $0.00 $0.00 $0.00
LABORER: FLAGGER $8.73 $0.00 $8.73 Bottom 10% -59% vs market $0.00 $0.00 $0.00 $0.00
LABORER: PIPELAYER $11.71 $0.00 $11.71 -45% vs market $0.00 $0.00 $0.00 $0.00
OPERATING ENGINEERS $33.15 $13.62 $46.77 Top 10% +98% vs market $0.00 $0.00 $0.00 $0.00
OPERATOR: BACKHOE $17.35 $0.00 $17.35 Above median $0.00 $0.00 $0.00 $0.00
OPERATOR: LOADER $13.50 $0.00 $13.50 $0.00 $0.00 $0.00 $0.00
TRUCK DRIVER: DUMP TRUCK $10.76 $0.00 $10.76 Bottom 10% -60% vs market $0.00 $0.00 $0.00 $0.00

Crew Labor Cost Estimator

Estimate total federal-contract labor cost using the Sumner, TN — Heavy construction prevailing wage rates. Add a row for each trade in your crew, set the number of workers and hours, and optionally add a burden percentage for payroll taxes, workers’ comp, and insurance.

Trade Workers Hours/worker Rate $/hr Subtotal
|
Direct labor subtotal
$0.00
Loaded cost (with burden)
$0.00

This is an estimate only. Burden percentages vary widely by state, employer experience modifier, and benefit plan structure. Davis-Bacon also requires per-trade record-keeping on Form WH-347; this calculator does not replace certified payroll reporting.

Other Construction Types in Sumner

Compliance Notes

Full Davis-Bacon compliance guide →

View full revision history for TN20260137-14766-hvy →