Highway Construction — Monroe, Tennessee

WD TN20260147-14690-hwy · Revision 1 · Effective May 17, 2026

Revision history →
Quick Answer

The Davis-Bacon prevailing wage for BRICKLAYER in Monroe, Tennessee (construction type: highway) is $14.26/hr base + $0.00/hr fringe = $14.26/hr total package (WD TN20260147-14690-hwy, Rev. 1).

Scroll down for all 23 trade classifications covered by this determination.

WD Number: TN20260147-14690-hwy
Revision: 1
Construction Type: highway
State: Tennessee (TN)
County: Monroe
Effective: May 17, 2026
Trades covered: 23
Official source: SAM.gov reference TN20260147View on SAM.gov →

Prevailing Wage Rates — All Trades

Base hourly rates and fringe benefit requirements for all trade classifications covered by this wage determination. Total package = base + fringe.

Trade Classification Base $/hr Fringe $/hr Total Package H&W Pension Vacation Training
BRICKLAYER $14.26 $0.00 $14.26 Bottom 10% -53% vs market $0.00 $0.00 $0.00 $0.00
CARPENTER $17.52 $0.00 $17.52 -26% vs market $0.00 $0.00 $0.00 $0.00
CEMENT MASON/CONCRETE FINISHER $15.55 $0.00 $15.55 -30% vs market $0.00 $0.00 $0.00 $0.00
ELECTRICIAN $24.08 $0.00 $24.08 -15% vs market $0.00 $0.00 $0.00 $0.00
IRONWORKER $16.89 $0.00 $16.89 Bottom 10% -37% vs market $0.00 $0.00 $0.00 $0.00
IRONWORKER $16.29 $0.00 $16.29 Bottom 10% -39% vs market $0.00 $0.00 $0.00 $0.00
LABORER $13.11 $0.00 $13.11 -38% vs market $0.00 $0.00 $0.00 $0.00
LABORER, SKILLED (AIR TOOL OPERATOR, ASPHALT RAKER, CHAIN SAW OPERATOR, CONCRETE MIXER, CONCRETE RUBBER, EDGER, FENCE ERECTOR, FORM SETTER, GUARD RAIL $15.27 $0.00 $15.27 Top 10% -28% vs market $0.00 $0.00 $0.00 $0.00
PAINTER $26.36 $0.00 $26.36 +35% vs market $0.00 $0.00 $0.00 $0.00
POWER EQUIPMENT OPERATOR: BOBCAT, CENTRAL MINING PLANT, CONCRETE PUMP, CONCRETE SAW, CURB MACHINE, DOZER OR LOADER, DRILL, MULCHER OR SEEDER, ROCK DRI $16.48 $0.00 $16.48 Top 10% -30% vs market $0.00 $0.00 $0.00 $0.00
POWER EQUIPMENT OPERATOR: GROUP 1 BACKHOE/HYDRAULIC EXCAVATOR, CRANE, END LOADER, MOTOR PATROL,PILEDRIVER, DRAGLINE $19.14 $0.00 $19.14 Top 10% -19% vs market $0.00 $0.00 $0.00 $0.00
POWER EQUIPMENT OPERATOR: GROUP 1A DRILL OPERATOR $25.26 $0.00 $25.26 Top 10% +7% vs market $0.00 $0.00 $0.00 $0.00
POWER EQUIPMENT OPERATOR: GROUP 1A FARM TRACTOR OPERATOR $13.50 $0.00 $13.50 Top 10% -43% vs market $0.00 $0.00 $0.00 $0.00
POWER EQUIPMENT OPERATOR: GROUP 2 BACKHOE/HYDRAULIC EXCAVATOR, BULLDOZER OR PUSH DOZER, END LOADER, MOTOR PATROL, TRACTOR, TRUCK DRIVER SCRAPER, SHOVE $17.08 $0.00 $17.08 Top 10% -28% vs market $0.00 $0.00 $0.00 $0.00
POWER EQUIPMENT OPERATOR: GROUP 3 ASPHALT PAVER, CONCRETE FINISHING MACHINE, CONCRETE PAVER, SCALE, SPREADER, CONCRETE GRINDER, ASPHALT MILLING MACHIN $17.75 $0.00 $17.75 Top 10% -25% vs market $0.00 $0.00 $0.00 $0.00
POWER EQUIPMENT OPERATOR: GROUP 4 BOBCAT, CENTRAL MINING PLANT, CONCRETE PUMP, CONCRETE SAW, CURB MACHINE, DOZER OR LOADER, DRILL, MULCHER OR SEEDER $16.48 $0.00 $16.48 Top 10% -30% vs market $0.00 $0.00 $0.00 $0.00
POWER EQUIPMENT OPERATOR: GROUP 4 HEAVY DUTY MECHANIC $20.33 $0.00 $20.33 Top 10% -14% vs market $0.00 $0.00 $0.00 $0.00
POWER EQUIPMENT OPERATOR: GROUP 4 LIGHT DUTY MECHANIC $19.53 $0.00 $19.53 Top 10% -17% vs market $0.00 $0.00 $0.00 $0.00
POWER EQUIPMENT OPERATOR: GROUP 4 SWEEPING MACHINE OPERATOR $15.56 $0.00 $15.56 Top 10% -34% vs market $0.00 $0.00 $0.00 $0.00
POWER EQUIPMENT OPERATOR: GROUP 5 CRANE $20.44 $0.00 $20.44 Top 10% -13% vs market $0.00 $0.00 $0.00 $0.00
TRUCK DRIVER $16.27 $0.00 $16.27 Above median -39% vs market $0.00 $0.00 $0.00 $0.00
TRUCK DRIVER $14.86 $0.00 $14.86 -44% vs market $0.00 $0.00 $0.00 $0.00
TRUCK DRIVER $15.36 $0.00 $15.36 Above median -43% vs market $0.00 $0.00 $0.00 $0.00

Crew Labor Cost Estimator

Estimate total federal-contract labor cost using the Monroe, TN — Highway construction prevailing wage rates. Add a row for each trade in your crew, set the number of workers and hours, and optionally add a burden percentage for payroll taxes, workers’ comp, and insurance.

Trade Workers Hours/worker Rate $/hr Subtotal
|
Direct labor subtotal
$0.00
Loaded cost (with burden)
$0.00

This is an estimate only. Burden percentages vary widely by state, employer experience modifier, and benefit plan structure. Davis-Bacon also requires per-trade record-keeping on Form WH-347; this calculator does not replace certified payroll reporting.

Other Construction Types in Monroe

Compliance Notes

Full Davis-Bacon compliance guide →

View full revision history for TN20260147-14690-hwy →