Building Construction — Lawrence, Tennessee

WD TN20260161-15817-bld · Revision 1 · Effective May 17, 2026

Revision history →
Quick Answer

The Davis-Bacon prevailing wage for CARPENTER in Lawrence, Tennessee (construction type: building) is $17.50/hr base + $4.30/hr fringe = $21.80/hr total package (WD TN20260161-15817-bld, Rev. 1).

Scroll down for all 12 trade classifications covered by this determination.

WD Number: TN20260161-15817-bld
Revision: 1
Construction Type: building
State: Tennessee (TN)
County: Lawrence
Effective: May 17, 2026
Trades covered: 12
Official source: SAM.gov reference TN20260161View on SAM.gov →

Prevailing Wage Rates — All Trades

Base hourly rates and fringe benefit requirements for all trade classifications covered by this wage determination. Total package = base + fringe.

Trade Classification Base $/hr Fringe $/hr Total Package H&W Pension Vacation Training
CARPENTER $17.50 $4.30 $21.80 -8% vs market $0.00 $0.00 $0.00 $0.00
CEMENT MASON/CONCRETE FINISHER $19.00 $0.00 $19.00 -15% vs market $0.00 $0.00 $0.00 $0.00
ELECTRICIAN $22.00 $11.77 $33.77 +19% vs market $0.00 $0.00 $0.00 $0.00
IRONWORKER, STRUCTURAL $19.96 $0.00 $19.96 -26% vs market $0.00 $0.00 $0.00 $0.00
LABORER: COMMON OR GENERAL $13.00 $3.99 $16.99 Above median -20% vs market $0.00 $0.00 $0.00 $0.00
LABORER: MASON TENDER - CEMENT/CONCRETE $15.00 $0.00 $15.00 Above median -29% vs market $0.00 $0.00 $0.00 $0.00
PAINTER $14.07 $0.00 $14.07 -28% vs market $0.00 $0.00 $0.00 $0.00
PLUMBER $21.81 $0.00 $21.81 -21% vs market $0.00 $0.00 $0.00 $0.00
POWER EQUIPMENT OPERATOR $33.23 $13.40 $46.63 Above median +98% vs market $0.00 $0.00 $0.00 $0.00
POWER EQUIPMENT OPERATOR: BULLDOZER $33.23 $13.40 $46.63 Above median +98% vs market $0.00 $0.00 $0.00 $0.00
POWER EQUIPMENT OPERATOR: CRANE $36.25 $13.40 $49.65 +110% vs market $0.00 $0.00 $0.00 $0.00
SHEET METAL WORKER $37.70 $17.40 $55.10 +113% vs market $0.00 $0.00 $0.00 $0.00

Crew Labor Cost Estimator

Estimate total federal-contract labor cost using the Lawrence, TN — Building construction prevailing wage rates. Add a row for each trade in your crew, set the number of workers and hours, and optionally add a burden percentage for payroll taxes, workers’ comp, and insurance.

Trade Workers Hours/worker Rate $/hr Subtotal
|
Direct labor subtotal
$0.00
Loaded cost (with burden)
$0.00

This is an estimate only. Burden percentages vary widely by state, employer experience modifier, and benefit plan structure. Davis-Bacon also requires per-trade record-keeping on Form WH-347; this calculator does not replace certified payroll reporting.

Other Construction Types in Lawrence

Compliance Notes

Full Davis-Bacon compliance guide →

View full revision history for TN20260161-15817-bld →