Heavy Construction — Hardin, Tennessee

WD TN20260123-14725-hvy · Revision 1 · Effective May 17, 2026

Revision history →
Quick Answer

The Davis-Bacon prevailing wage for ELECTRICIAN in Hardin, Tennessee (construction type: heavy) is $20.06/hr base + $0.00/hr fringe = $20.06/hr total package (WD TN20260123-14725-hvy, Rev. 1).

Scroll down for all 7 trade classifications covered by this determination.

WD Number: TN20260123-14725-hvy
Revision: 1
Construction Type: heavy
State: Tennessee (TN)
County: Hardin
Effective: May 17, 2026
Trades covered: 7
Official source: SAM.gov reference TN20260123View on SAM.gov →

Prevailing Wage Rates — All Trades

Base hourly rates and fringe benefit requirements for all trade classifications covered by this wage determination. Total package = base + fringe.

Trade Classification Base $/hr Fringe $/hr Total Package H&W Pension Vacation Training
ELECTRICIAN $20.06 $0.00 $20.06 -30% vs market $0.00 $0.00 $0.00 $0.00
LABORER: COMMON OR GENERAL $9.05 $1.57 $10.62 -50% vs market $0.00 $0.00 $0.00 $0.00
LABORER: FLAGGER $10.50 $0.00 $10.50 -51% vs market $0.00 $0.00 $0.00 $0.00
LABORER: PIPELAYER $12.59 $0.00 $12.59 -41% vs market $0.00 $0.00 $0.00 $0.00
OPERATING ENGINEERS $33.15 $13.62 $46.77 Top 10% +98% vs market $0.00 $0.00 $0.00 $0.00
OPERATOR: BACKHOE/EXCAVATOR/TRACKHOE $16.76 $0.00 $16.76 $0.00 $0.00 $0.00 $0.00
TRUCK DRIVER: DUMP TRUCK $11.61 $0.81 $12.42 -54% vs market $0.00 $0.00 $0.00 $0.00

Crew Labor Cost Estimator

Estimate total federal-contract labor cost using the Hardin, TN — Heavy construction prevailing wage rates. Add a row for each trade in your crew, set the number of workers and hours, and optionally add a burden percentage for payroll taxes, workers’ comp, and insurance.

Trade Workers Hours/worker Rate $/hr Subtotal
|
Direct labor subtotal
$0.00
Loaded cost (with burden)
$0.00

This is an estimate only. Burden percentages vary widely by state, employer experience modifier, and benefit plan structure. Davis-Bacon also requires per-trade record-keeping on Form WH-347; this calculator does not replace certified payroll reporting.

Other Construction Types in Hardin

Compliance Notes

Full Davis-Bacon compliance guide →

View full revision history for TN20260123-14725-hvy →