Heavy Construction — Grainger, Tennessee

WD TN20260144-14685-hvy · Revision 1 · Effective May 17, 2026

Revision history →
Quick Answer

The Davis-Bacon prevailing wage for ELECTRICIAN in Grainger, Tennessee (construction type: heavy) is $32.45/hr base + $15.25/hr fringe = $47.70/hr total package (WD TN20260144-14685-hvy, Rev. 1).

Scroll down for all 10 trade classifications covered by this determination.

WD Number: TN20260144-14685-hvy
Revision: 1
Construction Type: heavy
State: Tennessee (TN)
County: Grainger
Effective: May 17, 2026
Trades covered: 10
Official source: SAM.gov reference TN20260144View on SAM.gov →

Prevailing Wage Rates — All Trades

Base hourly rates and fringe benefit requirements for all trade classifications covered by this wage determination. Total package = base + fringe.

Trade Classification Base $/hr Fringe $/hr Total Package H&W Pension Vacation Training
ELECTRICIAN $32.45 $15.25 $47.70 +68% vs market $0.00 $0.00 $0.00 $0.00
ELECTRICIAN $34.82 $2.00 $36.82 +29% vs market $0.00 $0.00 $0.00 $0.00
LABORER: COMMON OR GENERAL $19.77 $6.53 $26.30 Above median +24% vs market $0.00 $0.00 $0.00 $0.00
LABORER: FLAGGER $8.73 $0.00 $8.73 Bottom 10% -59% vs market $0.00 $0.00 $0.00 $0.00
LABORER: PIPELAYER $11.70 $0.00 $11.70 -45% vs market $0.00 $0.00 $0.00 $0.00
OPERATING ENGINEERS $30.44 $13.40 $43.84 Above median +86% vs market $0.00 $0.00 $0.00 $0.00
OPERATING ENGINEERS $33.23 $13.40 $46.63 Above median +98% vs market $0.00 $0.00 $0.00 $0.00
OPERATOR: BACKHOE/EXCAVATOR/TRACKHOE $17.15 $0.00 $17.15 $0.00 $0.00 $0.00 $0.00
OPERATOR: LOADER $13.50 $0.00 $13.50 $0.00 $0.00 $0.00 $0.00
TRUCK DRIVER: DUMP TRUCK $10.76 $0.00 $10.76 Bottom 10% -60% vs market $0.00 $0.00 $0.00 $0.00

Crew Labor Cost Estimator

Estimate total federal-contract labor cost using the Grainger, TN — Heavy construction prevailing wage rates. Add a row for each trade in your crew, set the number of workers and hours, and optionally add a burden percentage for payroll taxes, workers’ comp, and insurance.

Trade Workers Hours/worker Rate $/hr Subtotal
|
Direct labor subtotal
$0.00
Loaded cost (with burden)
$0.00

This is an estimate only. Burden percentages vary widely by state, employer experience modifier, and benefit plan structure. Davis-Bacon also requires per-trade record-keeping on Form WH-347; this calculator does not replace certified payroll reporting.

Other Construction Types in Grainger

Compliance Notes

Full Davis-Bacon compliance guide →

View full revision history for TN20260144-14685-hvy →