Building Construction — Bradley, Tennessee

WD TN20260194-14667-bld · Revision 1 · Effective May 17, 2026

Revision history →
Quick Answer

The Davis-Bacon prevailing wage for ASBESTOS WORKER/HEAT & FROST INSULATOR in Bradley, Tennessee (construction type: building) is $38.17/hr base + $18.82/hr fringe = $56.99/hr total package (WD TN20260194-14667-bld, Rev. 1).

Scroll down for all 31 trade classifications covered by this determination.

WD Number: TN20260194-14667-bld
Revision: 1
Construction Type: building
State: Tennessee (TN)
County: Bradley
Effective: May 17, 2026
Trades covered: 31
Official source: SAM.gov reference TN20260194View on SAM.gov →

Prevailing Wage Rates — All Trades

Base hourly rates and fringe benefit requirements for all trade classifications covered by this wage determination. Total package = base + fringe.

Trade Classification Base $/hr Fringe $/hr Total Package H&W Pension Vacation Training
ASBESTOS WORKER/HEAT & FROST INSULATOR $38.17 $18.82 $56.99 +162% vs market $0.00 $0.00 $0.00 $0.00
BRICKLAYER $20.00 $0.00 $20.00 -34% vs market $0.00 $0.00 $0.00 $0.00
CARPENTER $18.00 $0.00 $18.00 -24% vs market $0.00 $0.00 $0.00 $0.00
CEMENT MASON/CONCRETE FINISHER $20.25 $0.00 $20.25 -9% vs market $0.00 $0.00 $0.00 $0.00
ELECTRICIAN $35.35 $14.63 $49.98 +76% vs market $0.00 $0.00 $0.00 $0.00
IRONWORKER, REINFORCING $35.32 $17.07 $52.39 Above median +95% vs market $0.00 $0.00 $0.00 $0.00
IRONWORKER, STRUCTURAL $35.32 $17.07 $52.39 Above median +95% vs market $0.00 $0.00 $0.00 $0.00
IRONWORKER: ORNAMENTAL $35.32 $17.07 $52.39 +95% vs market $0.00 $0.00 $0.00 $0.00
LABORER DEMOLITION $16.74 $0.00 $16.74 Top 10% -21% vs market $0.00 $0.00 $0.00 $0.00
LABORER GRADE CHECKER $13.01 $0.00 $13.01 Bottom 10% -39% vs market $0.00 $0.00 $0.00 $0.00
LABORER: COMMON OR GENERAL $14.11 $2.30 $16.41 Above median -23% vs market $0.00 $0.00 $0.00 $0.00
LABORER: MASON TENDER - BRICK $13.54 $0.00 $13.54 -36% vs market $0.00 $0.00 $0.00 $0.00
LABORER: MASON TENDER - CEMENT/CONCRETE $15.33 $0.00 $15.33 Above median -28% vs market $0.00 $0.00 $0.00 $0.00
LABORER: PIPELAYER $14.99 $2.41 $17.40 Above median -18% vs market $0.00 $0.00 $0.00 $0.00
OPERATOR: BACKHOE/EXCAVATOR/TRACKHOE $24.08 $0.00 $24.08 Above median $0.00 $0.00 $0.00 $0.00
OPERATOR: BOBCAT/SKID STEER/SKID LOADER $16.84 $0.00 $16.84 $0.00 $0.00 $0.00 $0.00
OPERATOR: BULLDOZER $28.19 $9.65 $37.84 Above median $0.00 $0.00 $0.00 $0.00
OPERATOR: DRILL $26.50 $4.09 $30.59 Above median $0.00 $0.00 $0.00 $0.00
OPERATOR: FORKLIFT $15.00 $0.00 $15.00 $0.00 $0.00 $0.00 $0.00
OPERATOR: PAVER $14.70 $0.00 $14.70 $0.00 $0.00 $0.00 $0.00
OPERATOR: ROLLER $14.35 $0.00 $14.35 $0.00 $0.00 $0.00 $0.00
PAINTER $15.48 $0.00 $15.48 -21% vs market $0.00 $0.00 $0.00 $0.00
PIPEFITTER $29.54 $12.41 $41.95 +51% vs market $0.00 $0.00 $0.00 $0.00
PLUMBER $26.86 $10.40 $37.26 +34% vs market $0.00 $0.00 $0.00 $0.00
POWER EQUIPMENT OPERATOR: CRANE $36.25 $13.40 $49.65 +110% vs market $0.00 $0.00 $0.00 $0.00
ROOFER $16.29 $0.00 $16.29 -24% vs market $0.00 $0.00 $0.00 $0.00
SHEET METAL WORKER $34.95 $16.66 $51.61 +100% vs market $0.00 $0.00 $0.00 $0.00
SHEET METAL WORKER $37.70 $17.40 $55.10 +113% vs market $0.00 $0.00 $0.00 $0.00
TILE FINISHER $14.00 $0.00 $14.00 Bottom 10% -30% vs market $0.00 $0.00 $0.00 $0.00
TILE SETTER $19.65 $0.00 $19.65 -2% vs market $0.00 $0.00 $0.00 $0.00
TRUCK DRIVER: DUMP TRUCK $15.28 $0.00 $15.28 -43% vs market $0.00 $0.00 $0.00 $0.00

Crew Labor Cost Estimator

Estimate total federal-contract labor cost using the Bradley, TN — Building construction prevailing wage rates. Add a row for each trade in your crew, set the number of workers and hours, and optionally add a burden percentage for payroll taxes, workers’ comp, and insurance.

Trade Workers Hours/worker Rate $/hr Subtotal
|
Direct labor subtotal
$0.00
Loaded cost (with burden)
$0.00

This is an estimate only. Burden percentages vary widely by state, employer experience modifier, and benefit plan structure. Davis-Bacon also requires per-trade record-keeping on Form WH-347; this calculator does not replace certified payroll reporting.

Other Construction Types in Bradley

Compliance Notes

Full Davis-Bacon compliance guide →

View full revision history for TN20260194-14667-bld →