Davis-Bacon Wage Determinations — Potter, South Dakota
Potter has 4 active Davis-Bacon wage determinations. Select a construction type to view trade rates and fringe benefit requirements.
Quick Answer
Davis-Bacon prevailing wage determinations for Potter, South Dakota cover 4 construction types: Building, Heavy, Highway and Residential. Each determination sets the minimum base hourly wage and fringe benefits per trade classification for federal construction projects in the county. Select a construction type below for the full trade-by-trade rate table.
building
Active
WD: SD20260024-17134-bld Rev. 1
Effective: May 17, 2026
View trade rates →
heavy
Active
WD: SD20260001-17134-hvy Rev. 2
Effective: May 20, 2026
View trade rates →
highway
Active
WD: SD20260001-17134-hwy Rev. 2
Effective: May 20, 2026
View trade rates →
residential
Active
WD: SD20260003-17134-res Rev. 1
Effective: May 17, 2026
View trade rates →
Top-Paying Trades in Potter
Highest Davis-Bacon total packages (base + fringe) across this county's wage determinations. Each row shows the construction type that yields the highest rate for that trade.
| # | Trade | Construction Type | Base $/hr | Fringe $/hr | Total Package | |
|---|---|---|---|---|---|---|
| 1 | YEAR'S DAY; MEMORIAL DAY; INDEPENDENCE DAY; LABOR DAY; VETERAN'S DAY; THANKSGIVING DAY; DAY AFTER THANKSGIVING; & CHRISTMAS DAY | building | $56.30 | $38.44 | $94.74 | WD → |
| 2 | ASBESTOS WORKER/HEAT & FROST INSULATOR | building | $55.34 | $34.03 | $89.37 | WD → |
| 3 | SPRINKLER FITTER | building | $38.47 | $24.68 | $63.15 | WD → |
| 4 | POWER EQUIPMENT OPERATOR Tower Crane | building | $34.38 | $18.71 | $53.09 | WD → |
| 5 | POWER EQUIPMENT OPERATOR ( TOWER CRANE): LONG BOOM PAY: 151' TO 200' - $0.50 PER HOUR ADDITIONAL; 201' AND OVER - $0.60 PER HOUR. MEASUREMENT SHALL BE | building | $34.38 | $18.71 | $53.09 | WD → |
| 6 | POWER EQUIPMENT OPERATOR Hydro Crane; Crane | building | $34.08 | $18.71 | $52.79 | WD → |
| 7 | $2.00 400' TO 449' - $2.50 450' AND OVER - $3.00 | building | $34.08 | $18.71 | $52.79 | WD → |
| 8 | PLUMBER | building | $34.90 | $15.70 | $50.60 | WD → |
| 9 | SHEET METAL WORKER: HVAC DUCT INSTALLATION ONLY | building | $30.93 | $17.22 | $48.15 | WD → |
| 10 | SHEET METAL WORKER | building | $30.93 | $17.22 | $48.15 | WD → |
Each wage determination above lists the minimum hourly base rate and required fringe benefits per trade classification. Full Davis-Bacon compliance guide →